Loading…
Loading…
6 results • Latest
Tiruchchirappalli Division - Villupuram Tiruchchirappalli (Main Line) section: Proposed Construction of Road Over Bridge in lieu of LC No. 138 at Km 185/300- 400 with 1x36m effective span steel composite girder including limited height subway of size 6m x 2.85m in between Panruti and Melpattambakkam stations.
Chengalpattu-Arakkonam section - Proposed construction of Road over bridge in lieu of level crossing No. 49D at km 63/900-64/000 including Limited Height Subway between Takkolam & Arakkonam Junction
1. Quilon-Trivandrum Section - Proposed construction of 2 Lane road over bridge in lieu of level crossing No: 549 (Kottikada gate) at km 162/000-100 with 1x30000 (effective span) composite girder super structure between Kollam Junction and Mayyanad Railway stations. 2. Quilon-Trivandrum Section - Proposed construction of 2 Lane road over bridge in lieu of level crossing No: 543 (SN college gate) at km 157/200-300 as 1x36000 (effective span) composite girder super structure between Kollam Junction and Mayyanad Railway stations. 3. Kollam - Tiruvananthapuram section - Proposed road over bridge in lieu of Existing level crossing No: 558 (Punnamoodu) at km 177/800-900 with 1x36000 (Effective span) composite Girder super structure between Edava Junction and Varkala Railway Station. 4. Kollam - Tiruvananthapuram section - Proposed road over bridge in lieu of Existing level crossing No: 574 (Vettu Road) at km 203/900-204/000 with 1x36000 (Effective span) composite Girder super structure between Murukkampuzha & Kazhakuttam Stations.
1. Shoranur-Ernakulam section - Proposed construction of 2 Lane road over bridge in lieu of level crossing No: 28 (Pudukad) at km 46/600-700 with 1x41500 (effective span)and 1x30000 (effective span) composite Girder super structure between Thrisur and Ollur stations. 2. Shoranur-Ernakulam section - Proposed construction of 2 Lane road over bridge in lieu of level crossing No: 24 (Nedupuzha) at km 35/400-500 with 1x30000 sk (effective span)and 1x24000 sk(effective span) composite Girder super structure between Thrisur and Ollur stations. 3. Ernakulam - Tiruvananthapuram section - Proposed road over bridge in lieu of Existing level crossing No: 75A (Atlantis Junction) at km 1/500-600 with 1x36000 (effective span) composite Girder super structure.
MAS Division-MS - VM Section - Preparation of Detailed Project Report for 2L Road Over Bridge in lieu of 20 No of LCs and Detailed Project Report for Limited Height Subway in lieu of 2 Nos of LC's
NAME OF WORK:MDU Division- Preparation of Detailed Project Report for the proposed subway/ROB in lieu of LCs-14 nos. in DEN/North jurisdiction.