Tender Value
₹30.9 Cr
EMD Value
₹17.0 L
Closing Date
5 Jan 2026, 3:00 pmClosed
1. Quilon-Trivandrum Section - Proposed construction of 2 Lane road over bridge in lieu of level crossing No: 549 (Kottikada gate) at km 162/000-100 with 1x30000 (effective span) composite girder super structure between Kollam Junction and Mayyanad Railway stations. 2. Quilon-Trivandrum Section - Proposed construction of 2 Lane road over bridge in lieu of level crossing No: 543 (SN college gate) at km 157/200-300 as 1x36000 (effective span) composite girder super structure between Kollam Junction and Mayyanad Railway stations. 3. Kollam - Tiruvananthapuram section - Proposed road over bridge in lieu of Existing level crossing No: 558 (Punnamoodu) at km 177/800-900 with 1x36000 (Effective span) composite Girder super structure between Edava Junction and Varkala Railway Station. 4. Kollam - Tiruvananthapuram section - Proposed road over bridge in lieu of Existing level crossing No: 574 (Vettu Road) at km 203/900-204/000 with 1x36000 (Effective span) composite Girder super structure between Murukkampuzha & Kazhakuttam Stations.
CAO-CN-RSP-ROB-11-2025~SR
CAO-CN-RSP-ROB-11-2025
Open
Works - General
18 Months
Thiruvananthapuram, Kerala
₹0
₹17.0 L
5 Jan 2026
12 Dec 2025
22 Dec 2025
A1-ITEMS OF WORKS THAT ARE COVERED UNDER USSOR 2021 ( LC
A2-ITEMS OF WORKS THAT ARE COVERED UNDER USSOR 2021 ( LC
A3-ITEMS OF WORKS THAT ARE COVERED UNDER USSOR 2021 (LC 558) 5284657.01 Below/P
A4-ITEMS OF WORKS THAT ARE COVERED UNDER USSOR 2021 ( LC
B1-ITEMS OF WORKS THAT ARE COVERED UNDER USSOR 2021 ( LC
B2-ITEMS OF WORKS THAT ARE COVERED UNDER USSOR 2021 ( LC
B3-ITEMS OF WORKS THAT ARE COVERED UNDER USSOR 2021 ( LC
B4-ITEMS OF WORKS THAT ARE COVERED UNDER USSOR 2021 ( LC
C1-ITEMS OF WORKS THAT ARE NOT COVERED UNDER USSOR 2021/DSR
C2-ITEMS OF WORKS THAT ARE NOT COVERED UNDER USSOR 2021/DSR
C3-ITEMS OF WORKS THAT ARE NOT COVERED UNDER USSOR 2021 (LC
C4-ITEMS OF WORKS THAT ARE NOT COVERED UNDER USSOR 2021/DSR
D1-ITEM THAT ARE COVERED UNDER USSOR 2021 - WORKS Above/
D2-ITEM THAT ARE COVERED UNDER USSOR 2021 - WORKS Above/
D3-ITEM THAT ARE COVERED UNDER USSOR 2021 - WORKS Above/
D4-ITEM THAT ARE COVERED UNDER USSOR 2021 - WORKS Above/
E1-ITEMS THAT ARE COVERED UNDER DSR 2021 (LC 549) 1514047.50 Below/P
E2-ITEMS THAT ARE COVERED UNDER DSR 2021) (LC 543) 5409000.15 Below/P
E3-ITEMS THAT ARE COVERED UNDER DSR 2021) (LC 558) 1802655.00 Below/P
E4-ITEMS THAT ARE COVERED UNDER DSR 2021) (LC 574) 5409000.15 Below/P
F1-ITEMS THAT ARE COVERED UNDER USSOR 2021 (LC 549)SUPPLY OF
F2-ITEMS THAT ARE COVERED UNDER USSOR 2021 (LC 543) SUPPLY OF
F3-ITEMS THAT ARE COVERED UNDER USSOR 2021 (LC 558)-SUPPLY OF
F4-ITEMS THAT ARE COVERED UNDER USSOR 2021 (LC 574)-SUPPLY OF
G1-ITEMS THAT ARE COVERED UNDER USSOR 2021 (LC 549)- SUPPLY
G2-ITEMS THAT ARE COVERED UNDER USSOR 2021 (LC 543)- SUPPLY
G3-ITEMS THAT ARE COVERED UNDER USSOR 2021 (LC 558)- SUPPLY
G4-ITEMS THAT ARE COVERED UNDER USSOR 2021 (LC 574)- SUPPLY
H1-ITEMS OF WORKS THAT ARE COVERED UNDER USSOR 2021- WORKS
H2-ITEMS OF WORKS THAT ARE COVERED UNDER USSOR 2021- WORKS
H3-(ITEMS OF WORKS THAT ARE COVERED UNDER USSOR 2021- WORKS
H4-ITEMS OF WORKS THAT ARE COVERED UNDER USSOR 2021- WORKS
I1-ITEMS OF WORKS COVERED UNDER DSR 2021- FOR DISMATLING OF
I2-ITEMS OF WORKS COVERED UNDER DSR 2021- FOR DISMATLING OF
I3-ITEMS OF WORKS COVERED UNDER DSR 2021- FOR DISMATLING OF
I4-ITEMS OF WORKS COVERED UNDER DSR 2021- FOR DISMATLING OF
J1-ITEMS COVERED UNDER USSOR 2021 (P WAY ITEMS) (LC 549) 773713.57 Below/P
J3-ITEMS COVERED UNDER USSOR 2021 (P WAY ITEMS) LC 558 508516.35 Below/P
K1-ITEMS OF WORKS THAT ARE NOT COVERED UNDER USSOR 2021/DSR
K3-ITEMS OF WORKS THAT ARE NOT COVERED UNDER USSOR 2021/DSR
Item Breakup - A1-ITEMS OF WORKS THAT ARE COVERED UNDER USSOR 2021 ( LC 549)
Preparation of foundation for 100 Embankment by clearing, grubbing, Sqm stripping top soil (average 150 mm) and stacking beyond foundation area, thereafter ploughing and pulverizing 150 - 200 mm of top of soil with tractor trolley, mixing water to achieve OMC with water sprinkler or left for natural drying, as required, and compaction with vibratory roller of suitable capacity to achieve 98% MDD for laying first layer of soil for embankment construction.
Conducting standard penetration Each test as per IS:2131 at approximate1.5m intervals in bore holes, as directed by the Engineer in charge Earthwork in excavation by mechanical means (Hydraulic Excavator)/Manual Means for foundations and floors of the bridges, retaining walls etc. including setting out, dressing of sides, ramming of bottom, getting out the excavated material, back filling in layers with approved material and consolidation of the layers by ramming and watering etc. including all lift, disposal of surplus soil up to a lead of 300m, all types of shoring and strutting with all labour and material complete as per drawing and technical specification as directed by Engineer in charge. Note: This item will be used for excavation work in connection with other miscellaneous works also like side drains, foundation for OHE masts and other miscellaneous structures in connection with Gauge Conversion, Doubling, New lines.
All kinds of soils Providing and laying in position Plain cement concrete of specified Nominal Mix f o r miscellaneous works like side drains, foundation for OHE masts and other miscellaneous structures excluding the cost of Cement, centering and shuttering - All work up to plinth level : CAO-CN-RSP-MS-ENGINEERING/SOUTHERN RLY
1:3:6 (1 Cement : 3 coarse sand cum (zone-III): 6 graded stone aggregate 40 mm nominal size).
Providing and laying in position cum machine batched, machine mixed and machine vibrated Cement Concrete of specified grade as per approved Design Mix (mixed in Mobile Concrete Batching/Mixing Plant at site or RMC from approved p l a n t s ) using 20mm graded crushed stone aggregate and coarse sand of approved quality in RCC raft foundation & Pile cap including finishing, using Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability complete as per specifications and direction of the Engineer in charge. N o t e : 1. Payment for cement, reinforcement and shuttering shall be made extra under relevant item. 2. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons for not using plasticiser at the stage of Mix Design and in that case deduction shall be made as per relevant item. Providing and laying in position machine batched, machine mixed and machine vibrated Cement Concrete of specified grade as per approved Design Mix (mixed in Mobile Concrete Batching/Mixing Plant at site or RMC from approved plants) using 20mm graded crushed stone aggregate and coarse sand of approved quality for the following Reinforced cement concrete structural elements up to height of 9.0 m from foundation top level, including finishing, using Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability complete as p e r specifications and direction of t h e Engineer in charge. N o t e : 1. Payment for cement, reinforcement and shuttering shall be made extra under relevant item. 2. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons for not using plasticiser at the stage of Mix Design and in that case deduction shall be made as per relevant item.
Abutment & Pier
Wing wall and Return wall CAO-CN-RSP-MS-ENGINEERING/SOUTHERN RLY
Abutment cap, Pier Cap, Inspection cum Platform & Pedestal over Pier cap, Fender wall, Diaphragm wall etc.
Approach slab at formation level, cum Dirt wall/ ballast wall at formation level Conducting load test of a single pile up to specified capacity in accordance with IS:2911 (Part-IV) including installation of loading platform and preparation of pile head or construction of test cap and dismantling of test cap after test etc. with all labour, material, tool & plants, equipment, machinery, etc. complete as per drawing and specification, as directed by the Engineer.
Routine Load Test above 100 ton Each capacity up to 250 ton capacity pile Centering and shuttering including strutting, propping etc. and removal of form for :
All types of bridge sub-structures, Sqm e.g. pier, abutment, wing wall, retaining wall, RCC box type foundations, Abutment cap, Pier Cap, Inspection Platform & Pedestal over Pier cap, Fender wall, Diaphragm wall etc. up to 5m above ground level
All types of bridge super-structures, Sqm e.g. slabs, I-girders, T-girders, Box girders etc. up to 5m above ground level.
Extra for additional height over Sqm item no. 025031 & 025032 wherever required with adequate bracing, propping etc. over initial height of 5 metres for every additional height of 1 metre or part thereof. Providing and fixing in position of standard preformed sealed and slab type or strip seal elastomeric type expansion joints for Railway bridge or Road Over Bridges as per approved drawings and latest MORTH/IRC specifications complete in all respect as directed by Engineer in-charge.
For 40mm expansion Providing and fixing in position GI Drainage Spouts of required length with Grating in RCC slab and filling bitumen along kerb as shown in drawing with contractor's pipes, bitumen, tools, equipment, lead, lifts etc. complete as per specifications and as directed by Engineer in-charge.
100mm dia. Drainage Spouts
Providing and fixing of Drainage Metre Spouts of 110mm UPVC Type A ISI marked (Working pressure 4 kg/sqcm) using suitable clamps and adhesive etc., complete. CAO-CN-RSP-MS-ENGINEERING/SOUTHERN RLY
Providing Rail Barricading with rails MT supplied by Railways with verticals provided at every 1.5m interval, height of barricade being up to 1.5m above ground / termination level and one or more row of horizontal rail, duly cutting rails and drilling holes as required, assembling necessary accessories to required length, including earthwork excavation for foundation, fixing posts in cement concrete 1:3:6 base of size 0.45m x 0.45m x 0.60m and one coat of red oxide painting of steel work. Note: 1. Excavation and concrete work will be paid separately. 2. Rail shall be made available within 250 metres Hiring of machinery for minor miscellaneous works for short duration including operator/driver, fuel, lubricants and consumable. The contractor shall arrange all statutory permits as required by rules and regulations prevailing in the area of work. Payment shall be made for actual working hours at site.
JCB Backhoe Loaders 3DX Plus or Hour similar with minimum 1.10 cum bucket capacity Earthwork in excavation by mechanical means (Hydraulic Excavator)/Manual Means for foundations and floors of the bridges, retaining walls etc. including setting out, dressing of sides, ramming of bottom, getting out the excavated material, back filling in layers with approved material and consolidation of the layers by ramming and watering etc. including all lift, disposal of surplus soil up to a lead of 300m, all types of shoring and strutting with all labour and material complete as per drawing and technical specification as directed by Engineer in charge. Note: This item will be used for excavation work in connection with other miscellaneous works also like side drains, foundation for OHE masts and other miscellaneous structures in connection with Gauge Conversion, Doubling, New lines. 19 022011(022020) Extra over item nos. 022011 to cum 700.00 46.52 32564.00 022014 for executing the work under water and/or liquid mud to compensate all additional arrangements including pumping out water as required. Note: The extra percentage rate is applicable only for the quantity of work executed under water. [RATE = 20%] Total 4015057.20
Item Breakup - A2-ITEMS OF WORKS THAT ARE COVERED UNDER USSOR 2021 ( LC 543)
Shoring with 'Z' section MS sheet Sqm piles side by side in all kinds of soil mechanically or manually as per approved drawing with contractor's own arrangement complete in all respects and removal of sheet piles after completion of the work as directed by engineer in-charge Note: Payment will be made as per actual driven length of pile. Earthwork in excavation by mechanical means (Hydraulic Excavator)/Manual Means for foundations and floors of the bridges, retaining walls etc. including setting out, dressing of sides, ramming of bottom, getting out the excavated material, back filling in layers with approved material and consolidation of the layers by ramming and watering etc. including all lift, disposal of surplus soil up to a lead of 300m, all types of shoring and strutting with all labour and material complete as per drawing and technical specification as directed by Engineer in charge. Note: This item will be used for excavation work in connection with other miscellaneous works also like side drains, foundation for OHE masts and other miscellaneous structures in connection with Gauge Conversion, Doubling, New lines.
All kinds of soils
Soft rock (not requiring blasting) Providing and laying in position Plain cement concrete of specified Nominal Mix f o r miscellaneous works like side drains, foundation for OHE masts and other miscellaneous structures excluding the cost of Cement, centering and shuttering - All work up to plinth level :
1:1½:3 (1 Cement: 1½ coarse sand cum (zone-III) : 3 graded stone aggregate 20 mm nominal size)
1:3:6 (1 Cement : 3 coarse sand cum (zone-III) : 6 graded stone aggregate 20 mm nominal size) CAO-CN-RSP-MS-ENGINEERING/SOUTHERN RLY
Providing and laying in position cum machine batched, machine mixed and machine vibrated Cement Concrete of specified grade as per approved Design Mix (mixed in Mobile Concrete Batching/Mixing Plant at site or RMC from approved p l a n t s ) using 20mm graded crushed stone aggregate and coarse sand of approved quality in RCC raft foundation & Pile cap including finishing, using Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability complete as per specifications and direction of the Engineer in charge. N o t e : 1. Payment for cement, reinforcement and shuttering shall be made extra under relevant item. 2. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons for not using plasticiser at the stage of Mix Design and in that case deduction shall be made as per relevant item. Providing and laying in position machine batched, machine mixed and machine vibrated Cement Concrete of specified grade as per approved Design Mix (mixed in Mobile Concrete Batching/Mixing Plant at site or RMC from approved plants) using 20mm graded crushed stone aggregate and coarse sand of approved quality for the following Reinforced cement concrete structural elements up to height of 9.0 m from foundation top level, including finishing, using Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability complete as p e r specifications and direction of t h e Engineer in charge. N o t e : 1. Payment for cement, reinforcement and shuttering shall be made extra under relevant item. 2. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons for not using plasticiser at the stage of Mix Design and in that case deduction shall be made as per relevant item.
Abutment & Pier
Wing wall and Return wall
Abutment cap, Pier Cap, Inspection cum Platform & Pedestal over Pier cap, Fender wall, Diaphragm wall etc. CAO-CN-RSP-MS-ENGINEERING/SOUTHERN RLY
Approach slab at formation level, cum Dirt wall/ ballast wall at formation level Deduct if Plasticiser has not been used in Design Mix Concrete of any grade as per approved mix design or use of 40mm graded stone aggregate in place of 20mm graded stone aggregate in any grade of concrete. Note: Deduction to be made for quantity of concrete.
Deduction for not using Plasticiser cum in approved proportions (as per IS:9103) for any grade of Design Mix Concrete. Centering and shuttering including strutting, propping etc. and removal of form for :
All types of bridge sub-structures, Sqm e.g. pier, abutment, wing wall, retaining wall, RCC box type foundations, Abutment cap, Pier Cap, Inspection Platform & Pedestal over Pier cap, Fender wall, Diaphragm wall etc. up to 5m above ground level
All types of bridge super-structures, Sqm e.g. slabs, I-girders, T-girders, Box girders etc. up to 5m above ground level.
Extra for additional height over Sqm item no. 025031 & 025032 wherever required with adequate bracing, propping etc. over initial height of 5 metres for every additional height of 1 metre or part thereof.
Supplying, Fabricating and fixing MT access ladders, inspection platforms, Trolley refuges etc., on bridges with structural steel conforming to IS:2062 including welding / bolting, priming painting with one coat of ready mixed paint of Zinc Chromate (IS:104) with DFT of 25-30 microns followed by one coat of Zinc Chrome Red Oxide (IS:2074) with DFT of 25 microns with all material, labour, T&P as a complete job. Note: Painting shall be paid separately under relevant item.
Providing and fixing of Drainage Metre Spouts of 110mm UPVC Type A ISI marked (Working pressure 4 kg/sqcm) using suitable clamps and adhesive etc., complete. CAO-CN-RSP-MS-ENGINEERING/SOUTHERN RLY
Providing cast in situ bridge Each number plaques as per Railway drawing in cement concrete 1:2:4 mix using 20mm hard stone aggregate embedded in 30mm notch in Bridge parapet coping duly engraving the letter and figures and an arrow indicating the direction of flow and finishing the top exposed surface with cement mortar 1:3, painting letters and figures with two coats of black enamel paint on two coats of white background with all labour, tools, cement, paint etc. with all leads and lifts.
Supplying, spreading and filling cum coarse sand (no cohesive materials to be used) of approved quality including watering and ramming in foundation, behind the abutment, wing wall, retaining wall in layers not exceeding 150mm thick including its compaction as per direction of Engineer-in-charge. The rate includes all lead, lift, ascent, descent, crossing of Railway line etc. complete with contractor's labour, materials, tools and plant.
Dewatering accumulated water from any Hour location. Payment to be done for Horse power of pump multiplied by pumping hours. Hiring of machinery for minor miscellaneous works for short duration including operator/driver, fuel, lubricants and consumable. The contractor shall arrange all statutory permits as required by rules and regulations prevailing in the area of work. Payment shall be made for actual working hours at site.
JCB Backhoe Loaders 3DX Plus or Hour similar with minimum 1.10 cum bucket capacity Total 7435469.00
Item Breakup - A3-ITEMS OF WORKS THAT ARE COVERED UNDER USSOR 2021 (LC 558)
Preparation of foundation for 100 Embankment by clearing, grubbing, Sqm stripping top soil (average 150 mm) and stacking beyond foundation area, thereafter ploughing and pulverizing 150 - 200 mm of top of soil with tractor trolley, mixing water to achieve OMC with water sprinkler or left for natural drying, as required, and compaction with vibratory roller of suitable capacity to achieve 98% MDD for laying first layer of soil for embankment construction. CAO-CN-RSP-MS-ENGINEERING/SOUTHERN RLY
Conducting standard penetration Each test as per IS:2131 at approximate1.5m intervals in bore holes, as directed by the Engineer in charge Earthwork in excavation by mechanical means (Hydraulic Excavator)/Manual Means for foundations and floors of the bridges, retaining walls etc. including setting out, dressing of sides, ramming of bottom, getting out the excavated material, back filling in layers with approved material and consolidation of the layers by ramming and watering etc. including all lift, disposal of surplus soil up to a lead of 300m, all types of shoring and strutting with all labour and material complete as per drawing and technical specification as directed by Engineer in charge. Note: This item will be used for excavation work in connection with other miscellaneous works also like side drains, foundation for OHE masts and other miscellaneous structures in connection with Gauge Conversion, Doubling, New lines.
All kinds of soils Providing and laying in position Plain cement concrete of specified Nominal Mix f o r miscellaneous works like side drains, foundation for OHE masts and other miscellaneous structures excluding the cost of Cement, centering and shuttering - All work up to plinth level :
1:3:6 (1 Cement : 3 coarse sand cum (zone-III): 6 graded stone aggregate 40 mm nominal size). CAO-CN-RSP-MS-ENGINEERING/SOUTHERN RLY
Providing and laying in position cum machine batched, machine mixed and machine vibrated Cement Concrete of specified grade as per approved Design Mix (mixed in Mobile Concrete Batching/Mixing Plant at site or RMC from approved p l a n t s ) using 20mm graded crushed stone aggregate and coarse sand of approved quality in RCC raft foundation & Pile cap including finishing, using Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability complete as per specifications and direction of the Engineer in charge. N o t e : 1. Payment for cement, reinforcement and shuttering shall be made extra under relevant item. 2. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons for not using plasticiser at the stage of Mix Design and in that case deduction shall be made as per relevant item. Providing and laying in position machine batched, machine mixed and machine vibrated Cement Concrete of specified grade as per approved Design Mix (mixed in Mobile Concrete Batching/Mixing Plant at site or RMC from approved plants) using 20mm graded crushed stone aggregate and coarse sand of approved quality for the following Reinforced cement concrete structural elements up to height of 9.0 m from foundation top level, including finishing, using Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability complete as p e r specifications and direction of t h e Engineer in charge. N o t e : 1. Payment for cement, reinforcement and shuttering shall be made extra under relevant item. 2. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons for not using plasticiser at the stage of Mix Design and in that case deduction shall be made as per relevant item.
Abutment & Pier
Wing wall and Return wall
Abutment cap, Pier Cap, Inspection cum Platform & Pedestal over Pier cap, Fender wall, Diaphragm wall etc. CAO-CN-RSP-MS-ENGINEERING/SOUTHERN RLY
Approach slab at formation level, cum Dirt wall/ ballast wall at formation level Centering and shuttering including strutting, propping etc. and removal of form for :
All types of bridge sub-structures, Sqm e.g. pier, abutment, wing wall, retaining wall, RCC box type foundations, Abutment cap, Pier Cap, Inspection Platform & Pedestal over Pier cap, Fender wall, Diaphragm wall etc. up to 5m above ground level
All types of bridge super-structures, Sqm e.g. slabs, I-girders, T-girders, Box girders etc. up to 5m above ground level.
Extra for additional height over Sqm item no. 025031 & 025032 wherever required with adequate bracing, propping etc. over initial height of 5 metres for every additional height of 1 metre or part thereof. Providing and fixing in position of standard preformed sealed and slab type or strip seal elastomeric type expansion joints for Railway bridge or Road Over Bridges as per approved drawings and latest MORTH/IRC specifications complete in all respect as directed by Engineer in-charge.
For 40mm expansion Providing and fixing in position GI Drainage Spouts of required length with Grating in RCC slab and filling bitumen along kerb as shown in drawing with contractor's pipes, bitumen, tools, equipment, lead, lifts etc. complete as per specifications and as directed by Engineer in-charge.
100mm dia. Drainage Spouts
Providing and fixing of Drainage Metre Spouts of 110mm UPVC Type A ISI marked (Working pressure 4 kg/sqcm) using suitable clamps and adhesive etc., complete.
Providing Rail Barricading with rails MT supplied by Railways with verticals provided at every 1.5m interval, height of barricade being up to 1.5m above ground / termination level and one or more row of horizontal rail, duly cutting rails and drilling holes as required, assembling necessary accessories to required length, including earthwork excavation for foundation, fixing posts in cement concrete 1:3:6 base of size 0.45m x 0.45m x 0.60m and one coat of red oxide painting of steel work. Note: 1. Excavation and concrete work will be paid separately. 2. Rail shall be made available within 250 metres CAO-CN-RSP-MS-ENGINEERING/SOUTHERN RLY Hiring of machinery for minor miscellaneous works for short duration including operator/driver, fuel, lubricants and consumable. The contractor shall arrange all statutory permits as required by rules and regulations prevailing in the area of work. Payment shall be made for actual working hours at site.
JCB Backhoe Loaders 3DX Plus or Hour similar with minimum 1.10 cum bucket capacity Total 4653215.65
Item Breakup - A4-ITEMS OF WORKS THAT ARE COVERED UNDER USSOR 2021 ( LC 574)
Shoring with 'Z' section MS sheet Sqm piles side by side in all kinds of soil mechanically or manually as per approved drawing with contractor's own arrangement complete in all respects and removal of sheet piles after completion of the work as directed by engineer in-charge Note: Payment will be made as per actual driven length of pile. Earthwork in excavation by mechanical means (Hydraulic Excavator)/Manual Means for foundations and floors of the bridges, retaining walls etc. including setting out, dressing of sides, ramming of bottom, getting out the excavated material, back filling in layers with approved material and consolidation of the layers by ramming and watering etc. including all lift, disposal of surplus soil up to a lead of 300m, all types of shoring and strutting with all labour and material complete as per drawing and technical specification as directed by Engineer in charge. Note: This item will be used for excavation work in connection with other miscellaneous works also like side drains, foundation for OHE masts and other miscellaneous structures in connection with Gauge Conversion, Doubling, New lines.
All kinds of soils
Soft rock (not requiring blasting) Providing and laying in position Plain cement concrete of specified Nominal Mix f o r miscellaneous works like side drains, foundation for OHE masts and other miscellaneous structures excluding the cost of Cement, centering and shuttering - All work up to plinth level :
1:1½:3 (1 Cement: 1½ coarse sand cum (zone-III) : 3 graded stone aggregate 20 mm nominal size) CAO-CN-RSP-MS-ENGINEERING/SOUTHERN RLY
1:3:6 (1 Cement : 3 coarse sand cum (zone-III) : 6 graded stone aggregate 20 mm nominal size)
Providing and laying in position cum machine batched, machine mixed and machine vibrated Cement Concrete of specified grade as per approved Design Mix (mixed in Mobile Concrete Batching/Mixing Plant at site or RMC from approved p l a n t s ) using 20mm graded crushed stone aggregate and coarse sand of approved quality in RCC raft foundation & Pile cap including finishing, using Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability complete as per specifications and direction of the Engineer in charge. N o t e : 1. Payment for cement, reinforcement and shuttering shall be made extra under relevant item. 2. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons for not using plasticiser at the stage of Mix Design and in that case deduction shall be made as per relevant item. Providing and laying in position machine batched, machine mixed and machine vibrated Cement Concrete of specified grade as per approved Design Mix (mixed in Mobile Concrete Batching/Mixing Plant at site or RMC from approved plants) using 20mm graded crushed stone aggregate and coarse sand of approved quality for the following Reinforced cement concrete structural elements up to height of 9.0 m from foundation top level, including finishing, using Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability complete as p e r specifications and direction of t h e Engineer in charge. N o t e : 1. Payment for cement, reinforcement and shuttering shall be made extra under relevant item. 2. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons for not using plasticiser at the stage of Mix Design and in that case deduction shall be made as per relevant item.
Abutment & Pier
Wing wall and Return wall CAO-CN-RSP-MS-ENGINEERING/SOUTHERN RLY
Abutment cap, Pier Cap, Inspection cum Platform & Pedestal over Pier cap, Fender wall, Diaphragm wall etc.
Approach slab at formation level, cum Dirt wall/ ballast wall at formation level Deduct if Plasticiser has not been used in Design Mix Concrete of any grade as per approved mix design or use of 40mm graded stone aggregate in place of 20mm graded stone aggregate in any grade of concrete. Note: Deduction to be made for quantity of concrete.
Deduction for not using Plasticiser cum in approved proportions (as per IS:9103) for any grade of Design Mix Concrete. Centering and shuttering including strutting, propping etc. and removal of form for :
All types of bridge sub-structures, Sqm e.g. pier, abutment, wing wall, retaining wall, RCC box type foundations, Abutment cap, Pier Cap, Inspection Platform & Pedestal over Pier cap, Fender wall, Diaphragm wall etc. up to 5m above ground level
All types of bridge super-structures, Sqm e.g. slabs, I-girders, T-girders, Box girders etc. up to 5m above ground level.
Extra for additional height over Sqm item no. 025031 & 025032 wherever required with adequate bracing, propping etc. over initial height of 5 metres for every additional height of 1 metre or part thereof.
Providing and fixing of Drainage Metre Spouts of 110mm UPVC Type A ISI marked (Working pressure 4 kg/sqcm) using suitable clamps and adhesive etc., complete.
Providing cast in situ bridge Each number plaques as per Railway drawing in cement concrete 1:2:4 mix using 20mm hard stone aggregate embedded in 30mm notch in Bridge parapet coping duly engraving the letter and figures and an arrow indicating the direction of flow and finishing the top exposed surface with cement mortar 1:3, painting letters and figures with two coats of black enamel paint on two coats of white background with all labour, tools, cement, paint etc. with all leads and lifts. CAO-CN-RSP-MS-ENGINEERING/SOUTHERN RLY
Supplying, spreading and filling cum coarse sand (no cohesive materials to be used) of approved quality including watering and ramming in foundation, behind the abutment, wing wall, retaining wall in layers not exceeding 150mm thick including its compaction as per direction of Engineer-in-charge. The rate includes all lead, lift, ascent, descent, crossing of Railway line etc. complete with contractor's labour, materials, tools and plant.
Dewatering accumulated water from any Hour location. Payment to be done for Horse power of pump multiplied by pumping hours. Hiring of machinery for minor miscellaneous works for short duration including operator/driver, fuel, lubricants and consumable. The contractor shall arrange all statutory permits as required by rules and regulations prevailing in the area of work. Payment shall be made for actual working hours at site.
JCB Backhoe Loaders 3DX Plus or Hour similar with minimum 1.10 cum bucket capacity Total 6547134.72
Item Breakup - B1-ITEMS OF WORKS THAT ARE COVERED UNDER USSOR 2021 ( LC 549)
1000mm diameter
Providing, fabricating and installing MT permanent casing pipe for bored piles for all diameters with specified thickness of steel plate including all labour, materials, tools & complete as per approved drawing & specifications complete in all respect as per the direction of Engineer in charge. Note: Payment shall be made as per the weight of circular plate of casing pipe only. Extra for chiselling in addition to boring of piles, if chiselling is required to be resorted to in hard rock or big stone boulders larger than 30cm, manually or by any other means.
1000mm diameter pile CAO-CN-RSP-MS-ENGINEERING/SOUTHERN RLY Conducting load test of a single pile up to specified capacity in accordance with IS:2911 (Part-IV) including installation of loading platform and preparation of pile head or construction of test cap and dismantling of test cap after test etc. with all labour, material, tool & plants, equipment, machinery, etc. complete as per drawing and specification, as directed by the Engineer.
Initial load test above 100 ton and Each up to 250 T capacity pile
Extra for every increase of 50 ton Each in pile capacity or part thereof over 250 ton
Pulse Echo Test (PET) for integrity Each testing of piles with contractor's men, materials and machines. The rate includes cost of Inspection of site, preparation of pile head and any other unforeseen cost required for the test, submission of reports in triplicate as per satisfaction of the Engineer in Charge. Total 2315676.56
Item Breakup - B2-ITEMS OF WORKS THAT ARE COVERED UNDER USSOR 2021 ( LC 543)
1000mm diameter CAO-CN-RSP-MS-ENGINEERING/SOUTHERN RLY
Providing, fabricating and installing MT permanent casing pipe for bored piles for all diameters with specified thickness of steel plate including all labour, materials, tools & complete as per approved drawing & specifications complete in all respect as per the direction of Engineer in charge. Note: Payment shall be made as per the weight of circular plate of casing pipe only. Extra for chiselling in addition to boring of piles, if chiselling is required to be resorted to in hard rock or big stone boulders larger than 30cm, manually or by any other means.
1000mm diameter pile Conducting load test of a single pile up to specified capacity in accordance with IS:2911 (Part-IV) including installation of loading platform and preparation of pile head or construction of test cap and dismantling of test cap after test etc. with all labour, material, tool & plants, equipment, machinery, etc. complete as per drawing and specification, as directed by the Engineer.
Initial load test above 100 ton and Each up to 250 T capacity pile
Extra for every increase of 50 ton Each in pile capacity or part thereof over 250 ton
Routine Load Test above 100 ton Each capacity up to 250 ton capacity pile
Pulse Echo Test (PET) for integrity Each testing of piles with contractor's men, materials and machines. The rate includes cost of Inspection of site, preparation of pile head and any other unforeseen cost required for the test, submission of reports in triplicate as per satisfaction of the Engineer in Charge. Total 10032237.37
Item Breakup - B3-ITEMS OF WORKS THAT ARE COVERED UNDER USSOR 2021 ( LC 558)
1000mm diameter
Providing, fabricating and installing MT permanent casing pipe for bored piles for all diameters with specified thickness of steel plate including all labour, materials, tools & complete as per approved drawing & specifications complete in all respect as per the direction of Engineer in charge. Note: Payment shall be made as per the weight of circular plate of casing pipe only. Extra for chiselling in addition to boring of piles, if chiselling is required to be resorted to in hard rock or big stone boulders larger than 30cm, manually or by any other means.
1000mm diameter pile CAO-CN-RSP-MS-ENGINEERING/SOUTHERN RLY Conducting load test of a single pile up to specified capacity in accordance with IS:2911 (Part-IV) including installation of loading platform and preparation of pile head or construction of test cap and dismantling of test cap after test etc. with all labour, material, tool & plants, equipment, machinery, etc. complete as per drawing and specification, as directed by the Engineer.
Initial load test above 100 ton and Each up to 250 T capacity pile
Extra for every increase of 50 ton Each in pile capacity or part thereof over 250 ton
Routine Load Test above 100 ton Each capacity up to 250 ton capacity pile
Pulse Echo Test (PET) for integrity Each testing of piles with contractor's men, materials and machines. The rate includes cost of Inspection of site, preparation of pile head and any other unforeseen cost required for the test, submission of reports in triplicate as per satisfaction of the Engineer in Charge. Total 2365269.18
Item Breakup - B4-ITEMS OF WORKS THAT ARE COVERED UNDER USSOR 2021 ( LC 574)
1000mm diameter CAO-CN-RSP-MS-ENGINEERING/SOUTHERN RLY
Providing, fabricating and installing MT permanent casing pipe for bored piles for all diameters with specified thickness of steel plate including all labour, materials, tools & complete as per approved drawing & specifications complete in all respect as per the direction of Engineer in charge. Note: Payment shall be made as per the weight of circular plate of casing pipe only. Extra for chiselling in addition to boring of piles, if chiselling is required to be resorted to in hard rock or big stone boulders larger than 30cm, manually or by any other means.
1000mm diameter pile Conducting load test of a single pile up to specified capacity in accordance with IS:2911 (Part-IV) including installation of loading platform and preparation of pile head or construction of test cap and dismantling of test cap after test etc. with all labour, material, tool & plants, equipment, machinery, etc. complete as per drawing and specification, as directed by the Engineer.
Initial load test above 100 ton and Each up to 250 T capacity pile
Extra for every increase of 50 ton Each in pile capacity or part thereof over 250 ton
Routine Load Test above 100 ton Each capacity up to 250 ton capacity pile
Pulse Echo Test (PET) for integrity Each testing of piles with contractor's men, materials and machines. The rate includes cost of Inspection of site, preparation of pile head and any other unforeseen cost required for the test, submission of reports in triplicate as per satisfaction of the Engineer in Charge. Total 8773689.61
Item Breakup - C1-ITEMS OF WORKS THAT ARE NOT COVERED UNDER USSOR 2021/DSR 2021 (LC 549)
Removal of the cables of any size Metre and nature viz. Signal/Telecom/Electrical (HT or LT) existing below Ground Level including casing of trough without causing any damage to the cable including excavating the earth upto the cable, refilling the earth after the removal of cable and placing the cable on the ground with all leads and lifts etc.complete and as directed. (All labour, materials, consumables, tools and plants, machinery by Contractor). Depth 1 m. and upto 2 m. CAO-CN-RSP-MS-ENGINEERING/SOUTHERN RLY
Re-laying of Railway's cables below Metre ground level removed as per Item above, including excavation of earth to the required depth (upto a maximum of 1m) and filling back the same earth after laying the cable, withoutcausing any damage to the cable with all leads and lifts etc. complete and as directed. (All labour, materials, consumables, tools and plants, machinery by Contractor).
Supplying and fixing of CI gratings Kg of sizes as required with contractors labour, materials, consumables etc complete.
Fixing of Fiber reinforced Plastic Sqm (FRP) insulation sheets in corrugated profile of 3mm thick with contractors own FRP sheets to be fixed below the fabricated structural steel supports for casting the composite girder duly transporting and fixing by insulated self tapping screws with the fabricated steel sections such as MS angles, flats, channels, etc as per the relevant drawings to correct alignment including cutting, drilling holes, welding, etc., complete and as directed as by Engineer- in charge in line/Power block (all labour, materials, tools and plants and other consumables by contractor).
Preparation of completion plans for Each the ROB/RUB in AutoCAD duly marking correction in the existing drawings based on the completion of bridge work over the already prepared drawings, supply of a draft print out of the completed drawings for scrutiny & taking the final printout on good quality tracing film, supplying the same with 3 copies of ammonia prints etc. complete with contractors men, materials, tools and plants, survey equipments, vehicles, machinery, fuel, consumables, Technical supervisors, computer etc complete and as directed.
Extra over item No. 1 inAnnexure MT 'B' (USSOR item-041011) for erection of Composite girders UNDER TRAFFIC CONDITION WITH TRAFFIC BLOCK. CAO-CN-RSP-MS-ENGINEERING/SOUTHERN RLY
Provision of an Reinforced cement cum concrete crash barrier at the edges of the road, approaches to bridge structures and medians, constructed with M-20 grade concrete with HYSD reinforcement conforming to IRC:21 and dowel bars 25 mm dia, 450 mm long at expansion joints filled with pre- moulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclosure to MOST circular No. RW/NH - 33022/1/94- DO III dated 24 June 1994 as per dimensions in the approved drawing and at locations directed by the Engineer, all as specified
Provision of an Reinforced cement Metre concrete crash barrier at the edges of the road, approaches to bridge structures and medians, constructed with M-20 grade concrete with HYSD reinforcement conforming to IRC:21 and dowel bars 25 mm dia, 450 mm long at expansion joints filled with pre- moulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclosure to MOST circular No.RW/NH - 33022/1/94- DO III dated 24 June 1994 as per dimensions in the approved drawing and at locations directed by the Engineer, all as specified
Designing, Supplying, fabricating Sqm and providing of trapezoidal roll formed deck sheeting profiles of 50mm depth made of galvanized steel troughed metal decking plate over cross girders/ supports for cast-in-situ deck slab of ROB. Thickness of deck plate shall be 1.00mm (minimum) and shall serve as permanent shuttering to deck slab of 250mm (max) thickness measured over crest of metal decking and shall have adequate strength to support the weight of green concrete and imposed loads during concreting over a span of 200mm between supports. Deck sheets to be embossed to facilitate enhanced sheet to concrete bonding with contractor's material, men, equipment, tools and plants, fixing arrangements, all leads and lifts and the work to be carried out above Railway tracks and 25Kv OHE electrified area without affecting Railway traffic and damage in Railway properties as directed by Engineer-in-charge. CAO-CN-RSP-MS-ENGINEERING/SOUTHERN RLY
Supply & applying of Loctite Thread Each locker adhesive as an anti-theft and anti sabotage measure for HSFG Bolts. with contractor's labour, tools & plant NNS-26 including all lead & lift, etc. complete as required. Liter The rates are all inclusive (Supplying, Applying & testing) and will be paid after the testing and satisfaction of the Engineer - in - charge. STAGE PAYMENT i) Stage- I:- 60% of payment as per the accepted rate against supply of bonding agent along with necessary documents such as copy of invoice and MTC may be claimed. (ii) Stage- II:- 30% of payment as per the accepted rate for supplied bonding agent will be made after application on HSFG bolts for consumed quantity. (iii) Stage-III:- 10% of payment as per the accepted rate for supplied bonding agent will be made after application on HSFG bolts successfully completion of work. (note: Unit each denotes each bolt ). Total 5717124.33
Item Breakup - C2-ITEMS OF WORKS THAT ARE NOT COVERED UNDER USSOR 2021/DSR 2021 (LC 543)
Removal of the cables of any size Metre and nature viz. Signal/Telecom/Electrical (HT or LT) existing below Ground Level including casing of trough without causing any damage to the cable including excavating the earth upto the cable, refilling the earth after the removal of cable and placing the cable on the ground with all leads and lifts etc.complete and as directed. (All labour, materials, consumables, tools and plants, machinery by Contractor). Depth 1 m. and upto 2 m.
Re-laying of Railway's cables below Metre ground level removed as per Item above, including excavation of earth to the required depth (upto a maximum of 1m) and filling back the same earth after laying the cable, withoutcausing any damage to the cable with all leads and lifts etc. complete and as directed. (All labour, materials, consumables, tools and plants, machinery by Contractor).
Supplying and fixing of CI gratings Kg of sizes as required with contractors labour, materials, consumables etc complete. CAO-CN-RSP-MS-ENGINEERING/SOUTHERN RLY
Fixing of Fiber reinforced Plastic Sqm (FRP) insulation sheets in corrugated profile of 3mm thick with contractors own FRP sheets to be fixed below the fabricated structural steel supports for casting the composite girder duly transporting and fixing by insulated self tapping screws with the fabricated steel sections such as MS angles, flats, channels, etc as per the relevant drawings to correct alignment including cutting, drilling holes, welding, etc., complete and as directed as by Engineer- in charge in line/Power block (all labour, materials, tools and plants and other consumables by contractor).
Preparation of completion plans for Each the ROB/RUB in AutoCAD duly marking correction in the existing drawings based on the completion of bridge work over the already prepared drawings, supply of a draft print out of the completed drawings for scrutiny & taking the final printout on good quality tracing film, supplying the same with 3 copies of ammonia prints etc. complete with contractors men, materials, tools and plants, survey equipments, vehicles, machinery, fuel,consumables, Technical supervisors, computer etc complete and as directed.
Manufacture and supply of Cement cum Concrete blocks of required size and shape with M25 mix using 20mm stone metal etc., with contractor's shuttering materials Including curing as per standard specification with all leads and lifts etc., complete and as directed. (All labour, material by contractor EXCLUDING cement which will be paid separately under relevant item and Annexure of this schedule).
Laying the pre-cast CC Blocks of Sqm required size and shape for lining the side slope and quadrants of abutments, flooring of bridges including joining the blocks and flush pointing the top faces with cement mortar 1:3 mix with all leads and lifts etc., complete and as directed. (All labour and material by contractor EXC cement which will be paid separately under relevant item and Annexure of this schedule).
Extra over item No. 1 inAnnexure MT 'B' (USSOR item-041011) for erection of Composite girders UNDER TRAFFIC CONDITION WITH TRAFFIC BLOCK. CAO-CN-RSP-MS-ENGINEERING/SOUTHERN RLY
Providing and laying in position cum machine mixed, machine vibrated and machine batched Design Mix Cement Concrete M25 or higher grade (Cast-in-situ) for RCC deck slab including parapet wall, crash barrier, kerb wall etc. using 20mm graded crushed stone aggregate and coarse sand of approved quality for the Reinforced cement concrete structural elements up to height of 12m from formation level, including cost of centering, shuttering, but including finishing, using Admixtures in recommended proportions (as per IS:9103), if approved in Mix design to accelerate or retard setting of concrete and/or improve workability without impairing strength and durability complete as per specifications over the running lines, OHE area etc. duly taking necessary precautions including earthings and providing FRP sheets along the OHE line etc. and direction of the Engineer in charge .Payment for cement, steel reinforcement, shuttering & FRP sheet shall be paid separately as per relevant items in Annexures. The contractor may use sacrificial form work using approved quality and design decking profile sheets for slab bottom shuttering. However no extra payment will be made for the same.
Designing, Supplying, fabricating Sqm and providing of trapezoidal roll formed deck sheeting profiles of 50mm depth made of galvanized steel troughed metal decking plate over cross girders/ supports for cast-in-situ deck slab of ROB. Thickness of deck plate shall be 1.00mm (minimum) and shall serve as permanent shuttering to deck slab of 250mm (max) thickness measured over crest of metal decking and shall have adequate strength to support the weight of green concrete and imposed loads during concreting over a span of 200mm between supports. Deck sheets to be embossed to facilitate enhanced sheet to concrete bonding with contractor's material, men, equipment, tools and plants, fixing arrangements, all leads and lifts and the work to be carried out above Railway tracks and 25Kv OHE electrified area without affecting Railway traffic and damage in Railway properties as directed by Engineer-in-charge. CAO-CN-RSP-MS-ENGINEERING/SOUTHERN RLY
Supply & applying of Loctite Thread Each locker adhesive as an anti-theft and anti sabotage measure for HSFG Bolts. with contractor's labour, tools & plant NNS-26 including all lead & lift, etc. complete as required. Liter The rates are all inclusive (Supplying, Applying & testing) and will be paid after the testing and satisfaction of the Engineer - in - charge. STAGE PAYMENT i) Stage- I:- 60% of payment as per the accepted rate against supply of bonding agent along with necessary documents such as copy of invoice and MTC may be claimed. (ii) Stage- II:- 30% of payment as per the accepted rate for supplied bonding agent will be made after application on HSFG bolts for consumed quantity. (iii) Stage-III:- 10% of payment as per the accepted rate for supplied bonding agent will be made after application on HSFG bolts successfully completion of work. (note: Unit each denotes each bolt ). Total 4076518.05
Item Breakup - C3-ITEMS OF WORKS THAT ARE NOT COVERED UNDER USSOR 2021 (LC 558)
Removal of the cables of any size Metre and nature viz. Signal/Telecom/Electrical (HT or LT) existing below Ground Level including casing of trough without causing any damage to the cable including excavating the earth upto the cable, refilling the earth after the removal of cable and placing the cable on the ground with all leads and lifts etc.complete and as directed. (All labour, materials, consumables, tools and plants, machinery by Contractor). Depth 1 m. and upto 2 m.
Re-laying of Railway's cables below Metre ground level removed as per Item above, including excavation of earth to the required depth (upto a maximum of 1m) and filling back the same earth after laying the cable, withoutcausing any damage to the cable with all leads and lifts etc. complete and as directed. (All labour, materials, consumables, tools and plants, machinery by Contractor).
Supplying and fixing of CI gratings Kg of sizes as required with contractors labour, materials, consumables etc complete. CAO-CN-RSP-MS-ENGINEERING/SOUTHERN RLY
Fixing of Fiber reinforced Plastic Sqm (FRP) insulation sheets in corrugated profile of 3mm thick with contractors own FRP sheets to be fixed below the fabricated structural steel supports for casting the composite girder duly transporting and fixing by insulated self tapping screws with the fabricated steel sections such as MS angles, flats, channels, etc as per the relevant drawings to correct alignment including cutting, drilling holes, welding, etc., complete and as directed as by Engineer-in charge in line/Power block (all labour, materials, tools and plants and other consumables by contractor).
Preparation of completion plans for Each the ROB/RUB in AutoCAD duly marking correction in the existing drawings based on the completion of bridge work over the already prepared drawings, supply of a draft print out of the completed drawings for scrutiny & taking the final printout on good quality tracing film, supplying the same with 3 copies of ammonia prints etc. complete with contractors men, materials, tools and plants, survey equipments, vehicles, machinery, fuel, consumables, Technical supervisors, computer etc complete and as directed.
Extra over item No. 1 inAnnexure MT 'B' (USSOR item-041011) for erection of Composite girders UNDER TRAFFIC CONDITION WITH TRAFFIC BLOCK. CAO-CN-RSP-MS-ENGINEERING/SOUTHERN RLY
Providing and laying in position Each machine mixed, machine vibrated and machine batched Design Mix Cement Concrete M25 or higher grade (Cast-in-situ) for RCC deck slab including parapet wall, crash barrier, kerb wall etc. using 20mm graded crushed stone aggregate and coarse sand of approved quality for the Reinforced cement concrete structural elements up to height of 12m from formation level, including cost of centering, shuttering, but including finishing, using Admixtures in recommended proportions (as per IS:9103), if approved in Mix design to accelerate or retard setting of concrete and/or improve workability without impairing strength and durability complete as per specifications over the running lines, OHE area etc. duly taking necessary precautions including earthings and providing FRP sheets along the OHE line etc. and direction of the Engineer in charge. Payment for cement, steel reinforcement, shuttering & FRP sheet shall be paid separately as per relevant items in Annexures. The contractor may use sacrificial form work using approved quality and design decking profile sheets for slab bottom shuttering. However no extra payment will be made for the same.
Provision of an Reinforced cement Metre concrete crash barrier at the edges of the road, approaches to bridge structures and medians, constructed with M-20 grade concrete with HYSD reinforcement conforming to IRC:21 and dowel bars 25 mm dia, 450 mm long at expansion joints filled with pre- moulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclosure to MOST circular No. RW/NH - 33022/1/94-DO III dated 24 June 1994 as per dimensions in the approved drawing and at locations directed by the Engineer, all as specified CAO-CN-RSP-MS-ENGINEERING/SOUTHERN RLY
Designing, Supplying, fabricating Sqm and providing of trapezoidal roll formed deck sheeting profiles of 50mm depth made of galvanized steel troughed metal decking plate over cross girders/ supports for cast-in-situ deck slab of ROB. Thickness of deck plate shall be 1.00mm (minimum) and shall serve as permanent shuttering to deck slab of 250mm (max) thickness measured over crest of metal decking and shall have adequate strength to support the weight of green concrete and imposed loads during concreting over a span of 200mm between supports. Deck sheets to be embossed to facilitate enhanced sheet to concrete bonding with contractor's material, men, equipment, tools and plants, fixing arrangements, all leads and lifts and the work to be carried out above Railway tracks and 25Kv OHE electrified area without affecting Railway traffic and damage in Railway properties as directed by Engineer-in-charge.
Supply & applying of Loctite Thread Each locker adhesive as an anti-theft and anti sabotage measure for HSFG Bolts. with contractor's labour, tools & plant NNS-26 including all lead & lift, etc. complete as required. Liter The rates are all inclusive (Supplying, Applying & testing) and will be paid after the testing and satisfaction of the Engineer - in - charge. STAGE PAYMENT i) Stage- I:- 60% of payment as per the accepted rate against supply of bonding agent along with necessary documents such as copy of invoice and MTC may be claimed. (ii) Stage-II:- 30% of payment as per the accepted rate for supplied bonding agent will be made after application on HSFG bolts for consumed quantity. (iii) Stage-III:- 10% of payment as per the accepted rate for supplied bonding agent will be made after application on HSFG bolts successfully completion of work. (note: Unit each denotes each bolt ). Total 5843334.33
Item Breakup - C4-ITEMS OF WORKS THAT ARE NOT COVERED UNDER USSOR 2021/DSR 2021 (LC 574)
Removal of the cables of any size Each and nature viz. Signal/Telecom/Electrical (HT or LT) existing below Ground Level including casing of trough without causing any damage to the cable including excavating the earth upto the cable, refilling the earth after the removal of cable and placing the cable on the ground with all leads and lifts etc.complete and as directed. (All labour, materials, consumables, tools and plants, machinery by Contractor). Depth 1 m. and upto 2 m.
Re-laying of Railway's cables below Metre ground level removed as per Item above, including excavation of earth to the required depth (upto a maximum of 1m) and filling back the same earth after laying the cable, withoutcausing any damage to the cable with all leads and lifts etc. complete and as directed. (All labour, materials, consumables, tools and plants, machinery by Contractor).
Supplying and fixing of CI gratings Kg of sizes as required with contractors labour, materials, consumables etc complete.
Fixing of Fiber reinforced Plastic Sqm (FRP) insulation sheets in corrugated profile of 3mm thick with contractors own FRP sheets to be fixed below the fabricated structural steel supports for casting the composite girder duly transporting and fixing by insulated self tapping screws with the fabricated steel sections such as MS angles, flats, channels, etc as per the relevant drawings to correct alignment including cutting, drilling holes, welding, etc., complete and as directed as by Engineer-in charge in line/Power block (all labour, materials, tools and plants and other consumables by contractor).
Preparation of completion plans for Each the ROB/RUB in AutoCAD duly marking correction in the existing drawings based on the completion of bridge work over the already prepared drawings, supply of a draft print out of the completed drawings for scrutiny & taking the final printout on good quality tracing film, supplying the same with 3 copies of ammonia prints etc. complete with contractors men, materials, tools and plants, survey equipments, vehicles, machinery, fuel, consumables, Technical supervisors, computer etc complete and as directed. CAO-CN-RSP-MS-ENGINEERING/SOUTHERN RLY
Manufacture and supply of Cement cum Concrete blocks of required size and shape with M25 mix using 20mm stone metal etc., with contractor's shuttering materials Including curing as per standard specification with all leads and lifts etc., complete and as directed. (All labour, material by contractor EXCLUDING cement which will be paid separately under relevant item and Annexure of this schedule).
Laying the pre-cast CC Blocks of Sqm required size and shape for lining the side slope and quadrants of abutments, flooring of bridges including joining the blocks and flush pointing the top faces with cement mortar 1:3 mix with all leads and lifts etc., complete and as directed. (All labour and material by contractor EXC cement which will be paid separately under relevant item and Annexure of this schedule).
Extra over item No. 1 inAnnexure MT 'B' (USSOR item-041011) for erection of Composite girders UNDER TRAFFIC CONDITION WITH TRAFFIC BLOCK.
Providing and laying in position cum machine mixed, machine vibrated and machine batched Design Mix Cement Concrete M25 or higher grade (Cast-in-situ) for RCC deck slab including parapet wall, crash barrier, kerb wall etc. using 20mm graded crushed stone aggregate and coarse sand of approved quality for the Reinforced cement concrete structural elements up to height of 12m from formation level, including cost of centering, shuttering, but including finishing, using Admixtures in recommended proportions (as per IS:9103), if approved in Mix design to accelerate or retard setting of concrete and/or improve workability without impairing strength and durability complete as per specifications over the running lines, OHE area etc. duly taking necessary precautions including earthings and providing FRP sheets along the OHE line etc. and direction of the Engineer in charge. Payment for cement, steel reinforcement, shuttering & FRP sheet shall be paid separately as per relevant items in Annexures. The contractor may use sacrificial form work using approved quality and design decking profile sheets for slab bottom shuttering. However no extra payment will be made for the same. CAO-CN-RSP-MS-ENGINEERING/SOUTHERN RLY
Designing, Supplying, fabricating Sqm and providing of trapezoidal roll formed deck sheeting profiles of 50mm depth made of galvanized steel troughed metal decking plate over cross girders/ supports for cast-in-situ deck slab of ROB. Thickness of deck plate shall be 1.00mm (minimum) and shall serve as permanent shuttering to deck slab of 250mm (max) thickness measured over crest of metal decking and shall have adequate strength to support the weight of green concrete and imposed loads during concreting over a span of 200mm between supports. Deck sheets to be embossed to facilitate enhanced sheet to concrete bonding with contractor's material, men, equipment, tools and plants, fixing arrangements, all leads and lifts and the work to be carried out above Railway tracks and 25Kv OHE electrified area without affecting Railway traffic and damage in Railway properties as directed by Engineer-in-charge.
Supply & applying of Loctite Thread Each locker adhesive as an anti-theft and anti sabotage measure for HSFG Bolts. with contractor's labour, tools & plant NNS-26 including all lead & lift, etc. complete as required. Liter The rates are all inclusive (Supplying, Applying & testing) and will be paid after the testing and satisfaction of the Engineer - in - charge. STAGE PAYMENT i) Stage- I:- 60% of payment as per the accepted rate against supply of bonding agent along with necessary documents such as copy of invoice and MTC may be claimed. (ii) Stage-II:- 30% of payment as per the accepted rate for supplied bonding agent will be made after application on HSFG bolts for consumed quantity. (iii) Stage-III:- 10% of payment as per the accepted rate for supplied bonding agent will be made after application on HSFG bolts successfully completion of work. (note: Unit each denotes each bolt ). Total 4076518.05 Schedule D1-ITEM THAT ARE COVERED UNDER USSOR 2021 - WORKS CONNECTED WITH
SUPERSTRUCTURE WITH COMPOSITE GRIDER, BEARINGS,ETC) (LC 549)
ITEM THAT ARE COVERED UNDER USSOR 2021 - WORKS CONNECTED WITH SUPERSTRUCTURE
WITH COMPOSITE GRIDER, BEARINGS,ETC) (LC 549)
S No. Item No Description of Item Unit Qty Rate Amount
CAO-CN-RSP-MS-ENGINEERING/SOUTHERN RLY
Supplying, fabrication, assembling
of all types of steel girders of
specified spans with structural steel
conforming to Quality "B0" Grade
Designation E250 conforming to
IS:2062, erection / slewing / end
launching of steel girders with
cranes or any other approved
launching methods as per site
conditions (not requiring traffic
block) on sub-structure including
provision of trolley refuges etc.,
complete as per approved QAP and
drawings conforming to IRS-B1-
2001 and other relevant codes and
specifications. Note: 1. Detailed
fabrication and erection drawings &
launching methodology will be
prepared by the contractor and got
approved from Railway. 2. The rate
is all inclusive including launching
in position, complete in all respect
except cost of (i) Painting /
Metalising; (ii) Bearings & (iii) HSFG
bolts which shall be paid extra
under relevant item. 3. The
payment shall be made on the
theoretical weight of main
components and gusset plates only.
4. Payment Schedule: (i) Receipt of
material at site: 40% (ii)
Fabrication of girders: 20% (iii)
Erection/Launching: 20% (iv)
Completion in all respects: 20%
Girder/Composite Girder (Steel
any dia and any length with
suitable nuts including DTI washers
conforming to IRS-B1-2001 for
bridges and steel structures with
contractors labour, tools and plants
and lead and lift etc., complete.
Metallizing of steel work of girders
with sprayed aluminium after
surface preparation by Sand/grit
blasting, followed by one coat of
etch primer (IS:5666) & one coat of
Zinc Chrome primer (IS:104) and
two coats of aluminium paint
(IS:2339) with all labour, T&P and
material as a complete job duly
conforming to all relevant
specifications and process given
under Clause 39 of IRS-B1-2001.
Note: Nominal Thickness of
sprayed Aluminium coating shall be
150 microns. DFT of Zinc chrome
primer shall be 25-30 microns and
DFT of each coat of Aluminium
paint shall be 12-14 microns.
CAO-CN-RSP-MS-ENGINEERING/SOUTHERN RLY
access ladders, inspection
platforms, Trolley refuges etc., on
bridges with structural steel
conforming to IS:2062 including
welding / bolting, priming painting
with one coat of ready mixed paint
of Zinc Chromate (IS:104) with DFT
of 25-30 microns followed by one
coat of Zinc Chrome Red Oxide
(IS:2074) with DFT of 25 microns
with all material, labour, T&P as a
complete job. Note: Painting shall
be paid separately under relevant
Design, supply, fitting and fixing in
position true to line and level POT-
PTFE bearing of 200 MT Capacity,
consisting of a metal piston
supported by a disc or un
reinforced elastomer confined
within a metal cylinder, sealing
rings, dust seals, PTFE surface
sliding against stainless steel
mating surface, complete assembly
to be of cast steel / fabricated
structural steel, metal and
elastomer elements complete as
per IS:2062, IS:1030, AISI:304,
IS:3400, IS:226, BS-5400, Bridge
Code and as per approved drawing
a n d Technical Specifications. The
design of the bearings shall be
submitted by the manufacturers /
contractor and got approved from
Railway before fixing. Test report
after inspection of the bearings
shall be submitted and got
approved before the materials are
lifted from the manufacturer
Surface preparation of steel work of
bridge plate/composite girders by
cleaning with scrappers and/or wire
brushes to remove all rust and
loose or perished paint to prepare
perfectly clean & dry bare metal
surface free from all dirt/foreign
material & ready for initial coat of
paint for new or existing steel
girders. Rate includes cost of
labour, consumables, brushes, tools
& plants, ladders, scaffoldings,
jhoola, hanging scaffolding staging
Painting of cleaned plate/composite
bridge girders including all
scaffolding along with provision of
Jhoola / hanging scaffolding ladders
etc. where required.
CAO-CN-RSP-MS-ENGINEERING/SOUTHERN RLY
Chromate conforming to IS:104
with DFT of 25-30 Microns followed
by one coat of Zinc Chromate red
oxide conforming to IS:2074 DFT of
in dual containers conforming to
IS:2339 with DFT of 15 - 20 Microns
Schedule D2-ITEM THAT ARE COVERED UNDER USSOR 2021 - WORKS CONNECTED WITH
SUPERSTRUCTURE WITH COMPOSITE GRIDER, BEARINGS,ETC) (LC 543)
ITEM THAT ARE COVERED UNDER USSOR 2021 - WORKS CONNECTED WITH SUPERSTRUCTURE
WITH COMPOSITE GRIDER, BEARINGS,ETC) (LC 543)
S No. Item No Description of Item Unit Qty Rate Amount
Providing and fixing in position of
standard preformed sealed and
slab type or strip seal elastomeric
type expansion joints for Railway
bridge or Road Over Bridges as per
approved drawings and latest
MORTH/IRC specifications complete
in all respect as directed by
Engineer in-charge.
Supplying, fabrication, assembling
of all types of steel girders of
specified spans with structural steel
conforming to Quality "B0" Grade
Designation E250 conforming to
IS:2062, erection / slewing / end
launching of steel girders with
cranes or any other approved
launching methods as per site
conditions (not requiring traffic
block) on sub-structure including
provision of trolley refuges etc.,
complete as per approved QAP and
drawings conforming to IRS-B1-
2001 and other relevant codes and
specifications. Note: 1. Detailed
fabrication and erection drawings &
launching methodology will be
prepared by the contractor and got
approved from Railway. 2. The rate
is all inclusive including launching
in position, complete in all respect
except cost of (i) Painting /
Metalising; (ii) Bearings & (iii) HSFG
bolts which shall be paid extra
under relevant item. 3. The
payment shall be made on the
theoretical weight of main
components and gusset plates only.
4. Payment Schedule: (i) Receipt of
material at site: 40% (ii)
Fabrication of girders: 20% (iii)
Erection/Launching: 20% (iv)
Completion in all respects: 20%
Girder/Composite Girder (Steel
CAO-CN-RSP-MS-ENGINEERING/SOUTHERN RLY
any dia and any length with
suitable nuts including DTI washers
conforming to IRS-B1-2001 for
bridges and steel structures with
contractors labour, tools and plants
and lead and lift etc., complete.
Metallizing of steel work of girders
with sprayed aluminium after
surface preparation by Sand/grit
blasting, followed by one coat of
etch primer (IS:5666) & one coat of
Zinc Chrome primer (IS:104) and
two coats of aluminium paint
(IS:2339) with all labour, T&P and
material as a complete job duly
conforming to all relevant
specifications and process given
under Clause 39 of IRS-B1-2001.
Note: Nominal Thickness of
sprayed Aluminium coating shall be
150 microns. DFT of Zinc chrome
primer shall be 25-30 microns and
DFT of each coat of Aluminium
paint shall be 12-14 microns.
Design, supply, fitting and fixing in
position true to line and level POT-
PTFE bearing of 250 MT Capacity,
consisting of a metal piston
supported by a disc or un
reinforced elastomer confined
within a metal cylinder, sealing
rings, dust seals, PTFE surface
sliding against stainless steel
mating surface, complete assembly
to be of cast steel / fabricated
structural steel, metal and
elastomer elements complete as
per IS:2062, IS:1030, AISI:304,
IS:3400, IS:226, BS-5400, Bridge
Code and as per approved drawing
a n d Technical Specifications. The
design of the bearings shall be
submitted by the manufacturers /
contractor and got approved from
Railway before fixing. Test report
after inspection of the bearings
shall be submitted and got
approved before the materials are
lifted from the manufacturer
CAO-CN-RSP-MS-ENGINEERING/SOUTHERN RLY
Surface preparation of steel work of
bridge plate/composite girders by
cleaning with scrappers and/or wire
brushes to remove all rust and
loose or perished paint to prepare
perfectly clean & dry bare metal
surface free from all dirt/foreign
material & ready for initial coat of
paint for new or existing steel
girders. Rate includes cost of
labour, consumables, brushes, tools
& plants, ladders, scaffoldings,
jhoola, hanging scaffolding staging
Painting of cleaned plate/composite
bridge girders including all
scaffolding along with provision of
Jhoola / hanging scaffolding ladders
etc. where required.
Chromate conforming to IS:104
with DFT of 25-30 Microns followed
by one coat of Zinc Chromate red
oxide conforming to IS:2074 DFT of
in dual containers conforming to
IS:2339 with DFT of 15 - 20 Microns
Schedule D3-ITEM THAT ARE COVERED UNDER USSOR 2021 - WORKS CONNECTED WITH
SUPERSTRUCTURE WITH COMPOSITE GRIDER, BEARINGS,ETC) (LC 558)
ITEM THAT ARE COVERED UNDER USSOR 2021 - WORKS CONNECTED WITH SUPERSTRUCTURE
WITH COMPOSITE GRIDER, BEARINGS,ETC) (LC 558)
S No. Item No Description of Item Unit Qty Rate Amount
CAO-CN-RSP-MS-ENGINEERING/SOUTHERN RLY
Supplying, fabrication, assembling
of all types of steel girders of
specified spans with structural steel
conforming to Quality "B0" Grade
Designation E250 conforming to
IS:2062, erection / slewing / end
launching of steel girders with
cranes or any other approved
launching methods as per site
conditions (not requiring traffic
block) on sub-structure including
provision of trolley refuges etc.,
complete as per approved QAP and
drawings conforming to IRS-B1-
2001 and other relevant codes and
specifications. Note: 1. Detailed
fabrication and erection drawings &
launching methodology will be
prepared by the contractor and got
approved from Railway. 2. The rate
is all inclusive including launching
in position, complete in all respect
except cost of (i) Painting /
Metalising; (ii) Bearings & (iii) HSFG
bolts which shall be paid extra
under relevant item. 3. The
payment shall be made on the
theoretical weight of main
components and gusset plates only.
4. Payment Schedule: (i) Receipt of
material at site: 40% (ii)
Fabrication of girders: 20% (iii)
Erection/Launching: 20% (iv)
Completion in all respects: 20%
Girder/Composite Girder (Steel
any dia and any length with
suitable nuts including DTI washers
conforming to IRS-B1-2001 for
bridges and steel structures with
contractors labour, tools and plants
and lead and lift etc., complete.
Metallizing of steel work of girders
with sprayed aluminium after
surface preparation by Sand/grit
blasting, followed by one coat of
etch primer (IS:5666) & one coat of
Zinc Chrome primer (IS:104) and
two coats of aluminium paint
(IS:2339) with all labour, T&P and
material as a complete job duly
conforming to all relevant
specifications and process given
under Clause 39 of IRS-B1-2001.
Note: Nominal Thickness of
sprayed Aluminium coating shall be
150 microns. DFT of Zinc chrome
primer shall be 25-30 microns and
DFT of each coat of Aluminium
paint shall be 12-14 microns.
CAO-CN-RSP-MS-ENGINEERING/SOUTHERN RLY
access ladders, inspection
platforms, Trolley refuges etc., on
bridges with structural steel
conforming to IS:2062 including
welding / bolting, priming painting
with one coat of ready mixed paint
of Zinc Chromate (IS:104) with DFT
of 25-30 microns followed by one
coat of Zinc Chrome Red Oxide
(IS:2074) with DFT of 25 microns
with all material, labour, T&P as a
complete job. Note: Painting shall
be paid separately under relevant
Design, supply, fitting and fixing in
position true to line and level POT-
PTFE bearing of 250 MT Capacity,
consisting of a metal piston
supported by a disc or un
reinforced elastomer confined
within a metal cylinder, sealing
rings, dust seals, PTFE surface
sliding against stainless steel
mating surface, complete assembly
to be of cast steel / fabricated
structural steel, metal and
elastomer elements complete as
per IS:2062, IS:1030, AISI:304,
IS:3400, IS:226, BS-5400, Bridge
Code and as per approved drawing
a n d Technical Specifications. The
design of the bearings shall be
submitted by the manufacturers /
contractor and got approved from
Railway before fixing. Test report
after inspection of the bearings
shall be submitted and got
approved before the materials are
lifted from the manufacturer
Surface preparation of steel work of
bridge plate/composite girders by
cleaning with scrappers and/or wire
brushes to remove all rust and
loose or perished paint to prepare
perfectly clean & dry bare metal
surface free from all dirt/foreign
material & ready for initial coat of
paint for new or existing steel
girders. Rate includes cost of
labour, consumables, brushes, tools
& plants, ladders, scaffoldings,
jhoola, hanging scaffolding staging
Painting of cleaned plate/composite
bridge girders including all
scaffolding along with provision of
Jhoola / hanging scaffolding ladders
etc. where required.
CAO-CN-RSP-MS-ENGINEERING/SOUTHERN RLY
Chromate conforming to IS:104
with DFT of 25-30 Microns followed
by one coat of Zinc Chromate red
oxide conforming to IS:2074 DFT of
in dual containers conforming to
IS:2339 with DFT of 15 - 20 Microns
Schedule D4-ITEM THAT ARE COVERED UNDER USSOR 2021 - WORKS CONNECTED WITH
SUPERSTRUCTURE WITH COMPOSITE GRIDER, BEARINGS,ETC) (LC 574)
ITEM THAT ARE COVERED UNDER USSOR 2021 - WORKS CONNECTED WITH SUPERSTRUCTURE
WITH COMPOSITE GRIDER, BEARINGS,ETC) (LC 574)
S No. Item No Description of Item Unit Qty Rate Amount
Providing and fixing in position of
standard preformed sealed and
slab type or strip seal elastomeric
type expansion joints for Railway
bridge or Road Over Bridges as per
approved drawings and latest
MORTH/IRC specifications complete
in all respect as directed by
Engineer in-charge.
Supplying, fabrication, assembling
of all types of steel girders of
specified spans with structural steel
conforming to Quality "B0" Grade
Designation E250 conforming to
IS:2062, erection / slewing / end
launching of steel girders with
cranes or any other approved
launching methods as per site
conditions (not requiring traffic
block) on sub-structure including
provision of trolley refuges etc.,
complete as per approved QAP and
drawings conforming to IRS-B1-
2001 and other relevant codes and
specifications. Note: 1. Detailed
fabrication and erection drawings &
launching methodology will be
prepared by the contractor and got
approved from Railway. 2. The rate
is all inclusive including launching
in position, complete in all respect
except cost of (i) Painting /
Metalising; (ii) Bearings & (iii) HSFG
bolts which shall be paid extra
under relevant item. 3. The
payment shall be made on the
theoretical weight of main
components and gusset plates only.
4. Payment Schedule: (i) Receipt of
material at site: 40% (ii)
Fabrication of girders: 20% (iii)
Erection/Launching: 20% (iv)
Completion in all respects: 20%
Girder/Composite Girder (Steel
CAO-CN-RSP-MS-ENGINEERING/SOUTHERN RLY
any dia and any length with
suitable nuts including DTI washers
conforming to IRS-B1-2001 for
bridges and steel structures with
contractors labour, tools and plants
and lead and lift etc., complete.
Metallizing of steel work of girders
with sprayed aluminium after
surface preparation by Sand/grit
blasting, followed by one coat of
etch primer (IS:5666) & one coat of
Zinc Chrome primer (IS:104) and
two coats of aluminium paint
(IS:2339) with all labour, T&P and
material as a complete job duly
conforming to all relevant
specifications and process given
under Clause 39 of IRS-B1-2001.
Note: Nominal Thickness of
sprayed Aluminium coating shall be
150 microns. DFT of Zinc chrome
primer shall be 25-30 microns and
DFT of each coat of Aluminium
paint shall be 12-14 microns.
access ladders, inspection
platforms, Trolley refuges etc., on
bridges with structural steel
conforming to IS:2062 including
welding / bolting, priming painting
with one coat of ready mixed paint
of Zinc Chromate (IS:104) with DFT
of 25-30 microns followed by one
coat of Zinc Chrome Red Oxide
(IS:2074) with DFT of 25 microns
with all material, labour, T&P as a
complete job. Note: Painting shall
be paid separately under relevant
Design, supply, fitting and fixing in
position true to line and level POT-
PTFE bearing of 250 MT Capacity,
consisting of a metal piston
supported by a disc or un
reinforced elastomer confined
within a metal cylinder, sealing
rings, dust seals, PTFE surface
sliding against stainless steel
mating surface, complete assembly
to be of cast steel / fabricated
structural steel, metal and
elastomer elements complete as
per IS:2062, IS:1030, AISI:304,
IS:3400, IS:226, BS-5400, Bridge
Code and as per approved drawing
a n d Technical Specifications. The
design of the bearings shall be
submitted by the manufacturers /
contractor and got approved from
Railway before fixing. Test report
after inspection of the bearings
shall be submitted and got
approved before the materials are
lifted from the manufacturer
CAO-CN-RSP-MS-ENGINEERING/SOUTHERN RLY
Surface preparation of steel work of
bridge plate/composite girders by
cleaning with scrappers and/or wire
brushes to remove all rust and
loose or perished paint to prepare
perfectly clean & dry bare metal
surface free from all dirt/foreign
material & ready for initial coat of
paint for new or existing steel
girders. Rate includes cost of
labour, consumables, brushes, tools
& plants, ladders, scaffoldings,
jhoola, hanging scaffolding staging
Painting of cleaned plate/composite
bridge girders including all
scaffolding along with provision of
Jhoola / hanging scaffolding ladders
etc. where required.
Chromate conforming to IS:104
with DFT of 25-30 Microns followed
by one coat of Zinc Chromate red
oxide conforming to IS:2074 DFT of
in dual containers conforming to
IS:2339 with DFT of 15 - 20 Microns
Schedule Schedule E1-ITEMS THAT ARE COVERED UNDER DSR 2021 (LC 549)
Item- 17 ITEMS THAT ARE COVERED UNDER DSR 2021 (LC 549)
S No. Item No Description of Item Unit Qty Rate Amount
4.0 CONCRETE WORK
4.1S CEMENT CONCRETE (CAST IN SITU)
Providing and laying cement
concrete in retaining walls, return
walls, walls (any thickness)
including attached pilasters,
columns, piers, abutments, pillars,
posts, struts, buttresses, string or
lacing courses, parapets, coping,
bed blocks, anchor blocks, plain
window sills, fillets, sunken floor
etc., up to floor five level, excluding
the cost of centering, shuttering
(zone-III) derived from natural
1 sources : 3 graded stone aggregate
20 mm nominal size derived from
natural sources).
(zone-III) derived from natural
2 sources : 4 graded stone aggregate
20 mm nominal size derived from
natural sources)
Centering and shuttering including
4.3 strutting, propping etc. and
removal of form work for :
CAO-CN-RSP-MS-ENGINEERING/SOUTHERN RLY
4.3.2 Retaining walls, return walls, walls Sqm 100 669.55 66955
(any thickness) including attached
4 pilasters, buttresses, plinth and
string courses fillets, kerbs and
7.0 STONE WORK
7.1S RANDOM RUBBLE MASONRY
Random rubble masonry with hard
stone in foundation and plinth
including levelling up with cement
7.1 concrete 1:6:12 (1 cement : 6
coarse sand : 12 graded stone
aggregate 20 mm nominal size)
upto plinth level with :
Random rubble masonry with hard
stone in superstructure above
plinth level and upto floor five
level, including leveling up with
7.2 cement concrete 1:6:12 (1 cement
: 6 coarse sand : 12 graded stone
aggregate 20 mm nominal size) at
window sills, ceiling level and the
Schedule Schedule E2-ITEMS THAT ARE COVERED UNDER DSR 2021) (LC 543)
Item- 18 ITEMS THAT ARE COVERED UNDER DSR 2021) (LC 543)
S No. Item No Description of Item Unit Qty Rate Amount
2.0 EARTH WORK
Earth work in excavation by
mechanical means (Hydraulic
excavator) / manual means in
foundation trenches or drains (not
exceeding 1.5 m in width or 10 sqm
2.8 on plan), including dressing of sides
and ramming of bottoms, lift upto
1.5 m, including getting out the
excavated soil and disposal of
surplus excavated soil as directed,
within a lead of 50 m.
4.0 CONCRETE WORK
4.1S CEMENT CONCRETE (CAST IN SITU)
Providing and laying in position
cement concrete of specified grade
4.1 excluding the cost of centering and
shuttering - All work up to plinth
(zone-III) derived from natural
2 sources : 4 graded stone aggregate
20 mm nominal size derived from
natural sources)
(zone-III) derived from natural
3 sources: 6 graded stone aggregate
40 mm nominal size derived from
natural sources)
5.0 REINFORCED CEMENT CONCRETE
5.9S FORM WORK
CAO-CN-RSP-MS-ENGINEERING/SOUTHERN RLY
Centering and shuttering including
5.9 strutting, propping etc. and
removal of form for
5.9.1 Foundations, footings, bases of Sqm 70 307.95 21556.5
columns, etc. for mass concrete
5.9.2 Walls (any thickness) including Sqm 450 669.55 301297.5
5 attached pilasters, butteresses,
plinth and string courses etc.
5.9.3 Suspended floors, roofs, landings, Sqm 40 766.55 30662
balconies and access platform
5.9.7 Stairs, (excluding landings) except Sqm 30 657.75 19732.5
spiral-staircases
5.22S STEEL REINFORCEMENT
Steel reinforcement for R.C.C. work
including straightening, cutting,
5.22 bending, placing in position and
binding all complete upto plinth
5.22.6 Thermo-Mechanically Treated bars Kg 1000 89.65 89650
of grade Fe-500D or more.
Steel reinforcement for R.C.C. work
including straightening, cutting,
5.22A bending, placing in position and
binding all complete above plinth
5.22A.6 Thermo-Mechanically Treated bars Kg 25000 89.65 2241250
of grade Fe-500D or more.
5.33S DESIGN MIX CONCRETE
Providing and laying in position
ready mixed or site batched design
mix cement concrete for reinforced
cement concrete work; using
coarse aggregate and fine
aggregate derived from natural
s o u r c e s , Portland Pozzolana /
Ordinary Portland /Portland Slag
c e m e n t , admixtures in
recommended proportions as per
IS: 9103 to accelerate / retard
setting of concrete, to improve
durability and workability without
impairing strength; including
pumping of concrete to site of
5.33 laying, curing, carriage for all
leads; but excluding the cost of
centering, shuttering, finishing and
reinforcement as per direction of
the engineer-in-charge; for the
following grades of concrete. Note:
Extra cement up to 10% of the
minimum specified cement content
in design mix shall be payable
separately. In case the cement
content in design mix is more than
1.10 times of the specified
minimum cement content, the
contractor shall have discretion to
either re-design the mix or bear the
cost of extra cement.
5.33.1 All works upto plinth level
10 minimum cement content of 330 kg
11 minimum cement content of 350 kg
CAO-CN-RSP-MS-ENGINEERING/SOUTHERN RLY
All works above plinth level upto
12 minimum cement content of 330 kg
13 minimum cement content of 350 kg
5.35 Add for using extra cement in the Quintal 15 688.45 10326.75
items of design mix over and above
the specified cement content
6.0 MASONRY WORK
Brick work with common burnt clay
F.P.S. (non modular) bricks of class
designation 7.5 in foundation and
Brick work with common burnt clay
F.P.S. (non modular) bricks of class
6.4 designation 7.5 in superstructure
above plinth level up to floor V
level in all shapes and sizes in :
13.0 FINISHING
CEMENT PLASTER (IN COARSE
13.4 12 mm cement plaster of mix :
13.44S EXTERIOR FINISHING
Finishing walls with water proofing
cement paint of required shade :
applied @ 3.84 kg/10 sqm)
Schedule Schedule E3-ITEMS THAT ARE COVERED UNDER DSR 2021) (LC 558)
Item- 19 ITEMS THAT ARE COVERED UNDER DSR 2021) (LC 558)
S No. Item No Description of Item Unit Qty Rate Amount
4.0 CONCRETE WORK
4.1S CEMENT CONCRETE (CAST IN SITU)
Providing and laying cement
concrete in retaining walls, return
walls, walls (any thickness)
including attached pilasters,
columns, piers, abutments, pillars,
posts, struts, buttresses, string or
lacing courses, parapets, coping,
bed blocks, anchor blocks, plain
window sills, fillets, sunken floor
etc., up to floor five level, excluding
the cost of centering, shuttering
(zone-III) derived from natural
1 sources : 3 graded stone aggregate
20 mm nominal size derived from
natural sources).
(zone-III) derived from natural
2 sources : 4 graded stone aggregate
20 mm nominal size derived from
natural sources)
CAO-CN-RSP-MS-ENGINEERING/SOUTHERN RLY
Centering and shuttering including
4.3 strutting, propping etc. and
removal of form work for :
4.3.1 Foundations, footings, bases for Sqm 100 307.95 30795
4.3.2 Retaining walls, return walls, walls Sqm 100 669.55 66955
(any thickness) including attached
4 pilasters, buttresses, plinth and
string courses fillets, kerbs and
7.0 STONE WORK
7.1S RANDOM RUBBLE MASONRY
Random rubble masonry with hard
stone in foundation and plinth
including levelling up with cement
7.1 concrete 1:6:12 (1 cement : 6
coarse sand : 12 graded stone
aggregate 20 mm nominal size)
upto plinth level with :
Random rubble masonry with hard
stone in superstructure above
plinth level and upto floor five
level, including leveling up with
7.2 cement concrete 1:6:12 (1 cement
: 6 coarse sand : 12 graded stone
aggregate 20 mm nominal size) at
window sills, ceiling level and the
Schedule Schedule E4-ITEMS THAT ARE COVERED UNDER DSR 2021) (LC 574)
Item- 20 ITEMS THAT ARE COVERED UNDER DSR 2021) (LC 574)
S No. Item No Description of Item Unit Qty Rate Amount
2.0 EARTH WORK
Earth work in excavation by
mechanical means (Hydraulic
excavator) / manual means in
foundation trenches or drains (not
exceeding 1.5 m in width or 10 sqm
2.8 on plan), including dressing of sides
and ramming of bottoms, lift upto
1.5 m, including getting out the
excavated soil and disposal of
surplus excavated soil as directed,
within a lead of 50 m.
4.0 CONCRETE WORK
4.1S CEMENT CONCRETE (CAST IN SITU)
Providing and laying in position
cement concrete of specified grade
4.1 excluding the cost of centering and
shuttering - All work up to plinth
(zone-III) derived from natural
2 sources : 4 graded stone aggregate
20 mm nominal size derived from
natural sources)
(zone-III) derived from natural
3 sources: 6 graded stone aggregate
40 mm nominal size derived from
natural sources)
CAO-CN-RSP-MS-ENGINEERING/SOUTHERN RLY
5.0 REINFORCED CEMENT CONCRETE
5.9S FORM WORK
Centering and shuttering including
5.9 strutting, propping etc. and
removal of form for
5.9.1 Foundations, footings, bases of Sqm 70 307.95 21556.5
columns, etc. for mass concrete
5.9.2 Walls (any thickness) including Sqm 450 669.55 301297.5
5 attached pilasters, butteresses,
plinth and string courses etc.
5.9.3 Suspended floors, roofs, landings, Sqm 40 766.55 30662
balconies and access platform
5.9.7 Stairs, (excluding landings) except Sqm 30 657.75 19732.5
spiral-staircases
5.22S STEEL REINFORCEMENT
Steel reinforcement for R.C.C. work
including straightening, cutting,
5.22 bending, placing in position and
binding all complete upto plinth
5.22.6 Thermo-Mechanically Treated bars Kg 1000 89.65 89650
of grade Fe-500D or more.
Steel reinforcement for R.C.C. work
including straightening, cutting,
5.22A bending, placing in position and
binding all complete above plinth
5.22A.6 Thermo-Mechanically Treated bars Kg 25000 89.65 2241250
of grade Fe-500D or more.
5.33S DESIGN MIX CONCRETE
Providing and laying in position
ready mixed or site batched design
mix cement concrete for reinforced
cement concrete work; using
coarse aggregate and fine
aggregate derived from natural
s o u r c e s , Portland Pozzolana /
Ordinary Portland /Portland Slag
c e m e n t , admixtures in
recommended proportions as per
IS: 9103 to accelerate / retard
setting of concrete, to improve
durability and workability without
impairing strength; including
pumping of concrete to site of
5.33 laying, curing, carriage for all
leads; but excluding the cost of
centering, shuttering, finishing and
reinforcement as per direction of
the engineer-in-charge; for the
following grades of concrete. Note:
Extra cement up to 10% of the
minimum specified cement content
in design mix shall be payable
separately. In case the cement
content in design mix is more than
1.10 times of the specified
minimum cement content, the
contractor shall have discretion to
either re-design the mix or bear the
cost of extra cement.
5.33.1 All works upto plinth level
10 minimum cement content of 330 kg
CAO-CN-RSP-MS-ENGINEERING/SOUTHERN RLY
11 minimum cement content of 350 kg
All works above plinth level upto
12 minimum cement content of 330 kg
13 minimum cement content of 350 kg
5.35 Add for using extra cement in the Quintal 15 688.45 10326.75
items of design mix over and above
the specified cement content
6.0 MASONRY WORK
Brick work with common burnt clay
F.P.S. (non modular) bricks of class
designation 7.5 in foundation and
Brick work with common burnt clay
F.P.S. (non modular) bricks of class
6.4 designation 7.5 in superstructure
above plinth level up to floor V
level in all shapes and sizes in :
13.0 FINISHING
CEMENT PLASTER (IN COARSE
13.4 12 mm cement plaster of mix :
13.44S EXTERIOR FINISHING
Finishing walls with water proofing
cement paint of required shade :
applied @ 3.84 kg/10 sqm)
Schedule Schedule F1-ITEMS THAT ARE COVERED UNDER USSOR 2021 (LC 549)SUPPLY OF CEMENT
Item- 21 ITEMS THAT ARE COVERED UNDER USSOR 2021 (LC 549)SUPPLY OF CEMENT
S No. Item No Description of Item Unit Qty Rate Amount
Supply and using Cement at
of approved brands/makes
Schedule Schedule F2-ITEMS THAT ARE COVERED UNDER USSOR 2021 (LC 543) SUPPLY OF CEMENT
Item- 22 ITEMS THAT ARE COVERED UNDER USSOR 2021 (LC 543) SUPPLY OF CEMENT
S No. Item No Description of Item Unit Qty Rate Amount
Supply and using Cement at
of approved brands/makes
Schedule Schedule F3-ITEMS THAT ARE COVERED UNDER USSOR 2021 (LC 558)-SUPPLY OF CEMENT
Item- 23 ITEMS THAT ARE COVERED UNDER USSOR 2021 (LC 558)-SUPPLY OF CEMENT
S No. Item No Description of Item Unit Qty Rate Amount
Supply and using Cement at
CAO-CN-RSP-MS-ENGINEERING/SOUTHERN RLY
of approved brands/makes
Schedule Schedule F4-ITEMS THAT ARE COVERED UNDER USSOR 2021 (LC 574)-SUPPLY OF CEMENT
Item- 24 ITEMS THAT ARE COVERED UNDER USSOR 2021 (LC 574)-SUPPLY OF CEMENT
S No. Item No Description of Item Unit Qty Rate Amount
Supply and using Cement at
of approved brands/makes
Schedule G1-ITEMS THAT ARE COVERED UNDER USSOR 2021 (LC 549)- SUPPLY OF
REINFORCEMENT STEEL
ITEMS THAT ARE COVERED UNDER USSOR 2021 (LC 549)- SUPPLY OF REINFORCEMENT STEEL (LC
S No. Item No Description of Item Unit Qty Rate Amount
Supply of steel reinforcement of
approved brands/makes for R.C.C.
work including straightening,
cutting, bending, placing in position
and binding all complete.
of grade Fe-500D or more of
approved brands/makes.
Schedule G2-ITEMS THAT ARE COVERED UNDER USSOR 2021 (LC 543)- SUPPLY OF
REINFORCEMENT STEEL
Item- 26 ITEMS THAT ARE COVERED UNDER USSOR 2021 (LC 543)- SUPPLY OF REINFORCEMENT STEEL
S No. Item No Description of Item Unit Qty Rate Amount
Supply of steel reinforcement of
approved brands/makes for R.C.C.
work including straightening,
cutting, bending, placing in position
and binding all complete.
of grade Fe-500D or more of
approved brands/makes.
Schedule G3-ITEMS THAT ARE COVERED UNDER USSOR 2021 (LC 558)- SUPPLY OF
REINFORCEMENT STEEL
ITEMS THAT ARE COVERED UNDER USSOR 2021 (LC 558)- SUPPLY OF REINFORCEMENT STEEL (LC
S No. Item No Description of Item Unit Qty Rate Amount
Supply of steel reinforcement of
approved brands/makes for R.C.C.
work including straightening,
cutting, bending, placing in position
and binding all complete.
of grade Fe-500D or more of
approved brands/makes.
Schedule G4-ITEMS THAT ARE COVERED UNDER USSOR 2021 (LC 574)- SUPPLY OF
REINFORCEMENT STEEL
ITEMS THAT ARE COVERED UNDER USSOR 2021 (LC 574)- SUPPLY OF REINFORCEMENT STEEL (LC
S No. Item No Description of Item Unit Qty Rate Amount
Supply of steel reinforcement of
approved brands/makes for R.C.C.
work including straightening,
cutting, bending, placing in position
and binding all complete.
CAO-CN-RSP-MS-ENGINEERING/SOUTHERN RLY
of grade Fe-500D or more of
approved brands/makes.
Schedule H1-ITEMS OF WORKS THAT ARE COVERED UNDER USSOR 2021- WORKS CONNECTED
WITH TEMPORARY ARRANGEMENTS (LC 549)
ITEMS OF WORKS THAT ARE COVERED UNDER USSOR 2021- WORKS CONNECTED WITH
TEMPORARY ARRANGEMENTS (LC 549)
S No. Item No Description of Item Unit Qty Rate Amount
Provision of barricading with
contractor's bamboos / ballies
vertical post of 100mm dia. planted
at every 2m interval, projecting at
least 1.5m above ground level and
driven firmly (minimum 0.5m)
inside ground and including
painting verticals & horizontals with
red luminous paints / strips at
alternative bay on barricade.
Barricades shall be maintained
through out the execution of the
w o r k and shall be removed in
workman like manner on
completion of the work only after
instruction of Engineer in-Charge.
Note: (1) 60% payment shall be
made on provision of barricading at
work-site and balance 40%
payment after removal of
barricades. (2) The released
bamboos / ballies shall be the
property of the Contractor.
members of minimum 50mm dia.
ballast from track, duly digging /
scarifying ballast by beaters / wire
brushes or any mechanical means,
leveling and dressing formation
with specified cross slope after
salvaging ballast, separating muck
by screening the salvaged ballast
with contractor's 20mm size sieve,
stacking of screened ballast for
measurement, disposing off muck
at specified locations with all lead &
lifts as directed by Engineer in-
charge. Note: Payment shall be
made for quantity of ballast
stacked after screening of retrieved
ballast from track.
Providing Caution Watchman at a
location where caution order is
imposed and ensuring to be on
continuous vigil and exhibit
necessary hand signals to the
trains for their passage over
caution spot. Note: 1) Prescribed
protection equipment shall be
supplied by Railways and the same
shall be returned after work is over.
2) If Contractor fails to post
watchman at any time during one
day, penalty at double the
accepted rates will be levied and 3)
The watchman nominated by the
contractor will be screened for
suitability as per Railway norms.
CAO-CN-RSP-MS-ENGINEERING/SOUTHERN RLY
Maintenance of track on main line
& loops, Points & crossings etc.
including special attention to
section for carrying out various
maintenance works listed in Indian
Railways P.Way Manual / Bridge
Manual for safe running of goods
and passenger trains with
contractor's tools / labours etc.
complete, as directed by Engineer
in-charge. Note: Contractor shall
arrange one gang at any point of
time comprising of minimum
specified labours with sufficient
experience in P.Way working.
physically fit labours plus 1 Mate. Day
N o t e : (1) In case, contractor
provides less no. of Labour/Mate or
for non availability of vehicle,
payment will be deducted for each
such person or non-availability of
vehicle @ 20% of the accepted
item rate, separately for each
shortfall. (2) The Contractor shall
keep one pick up Truck of minimum
1.5T payload capacity with Driver
all the time and all expenditures for
running at an average of 80 kms
per day shall be born by the
Manufacturing, fabricating and
supplying retro-reflective
Engineering Indicator boards, made
of 2mm thick aluminium sheet or
3mm thick aluminium composite
sheet, face to be fully covered with
high intensity encapsulated type
heat activated retro-reflective
sheeting conforming to type-IV of
ASTM-D4956-01 in yellow & black
or other colour combination
including subject matter, message,
symbols, borders etc. as approved
by Engineer In-charge or as per
IRPWM guidelines, pasted on
substrate by an adhesive backing
which shall be activated by
applying heat and pressure
conforming to class-2 of ASTM-D-
4956-01 and fixing the same with
suitable sized aluminium alloy
rivets @ 20 cm c/c to back-support
frame of M.S. angle iron of size
25mm x25mm x 3mmprovided all
along the edges of board with theft
resistant measures back side of
board shall be with non-peelable
weatherproof paint, consisting of
one coat of zinc chromate primer
and two coats of epoxy paint.
Vertical post shall have black &
white anti-corrosive paint or
powder coating complete, as
CAO-CN-RSP-MS-ENGINEERING/SOUTHERN RLY
1400mmx400mm with back
support frame fixed to vertical post
of MS angle of size
50mmx50mmx6mm of 3650 mm
equilateral triangular shape having
each side of 1000mm with back
support frame fixed to vertical post
of MS angle of size
50mmx50mmx6mm of 3650 mm
Circular shape having diameter of
1000mm with back support frame
welded to vertical post of MS angle
of size 50mmx50mmx6mm of 3950
Schedule H2-ITEMS OF WORKS THAT ARE COVERED UNDER USSOR 2021- WORKS CONNECTED
WITH TEMPORARY ARRANGEMENTS (LC 543)
ITEMS OF WORKS THAT ARE COVERED UNDER USSOR 2021- WORKS CONNECTED WITH
TEMPORARY ARRANGEMENTS) (LC 543)
S No. Item No Description of Item Unit Qty Rate Amount
Provision of barricading with
contractor's bamboos / ballies
vertical post of 100mm dia. planted
at every 2m interval, projecting at
least 1.5m above ground level and
driven firmly (minimum 0.5m)
inside ground and including
painting verticals & horizontals with
red luminous paints / strips at
alternative bay on barricade.
Barricades shall be maintained
through out the execution of the
w o r k and shall be removed in
workman like manner on
completion of the work only after
instruction of Engineer in-Charge.
Note: (1) 60% payment shall be
made on provision of barricading at
work-site and balance 40%
payment after removal of
barricades. (2) The released
bamboos / ballies shall be the
property of the Contractor.
members of minimum 50mm dia.
ballast from track, duly digging /
scarifying ballast by beaters / wire
brushes or any mechanical means,
leveling and dressing formation
with specified cross slope after
salvaging ballast, separating muck
by screening the salvaged ballast
with contractor's 20mm size sieve,
stacking of screened ballast for
measurement, disposing off muck
at specified locations with all lead &
lifts as directed by Engineer in-
charge. Note: Payment shall be
made for quantity of ballast
stacked after screening of retrieved
ballast from track.
CAO-CN-RSP-MS-ENGINEERING/SOUTHERN RLY
Providing Caution Watchman at a
location where caution order is
imposed and ensuring to be on
continuous vigil and exhibit
necessary hand signals to the
trains for their passage over
caution spot. Note: 1) Prescribed
protection equipment shall be
supplied by Railways and the same
shall be returned after work is over.
2) If Contractor fails to post
watchman at any time during one
day, penalty at double the
accepted rates will be levied and 3)
The watchman nominated by the
contractor will be screened for
suitability as per Railway norms.
Maintenance of track on main line
& loops, Points & crossings etc.
including special attention to
section for carrying out various
maintenance works listed in Indian
Railways P.Way Manual / Bridge
Manual for safe running of goods
and passenger trains with
contractor's tools / labours etc.
complete, as directed by Engineer
in-charge. Note: Contractor shall
arrange one gang at any point of
time comprising of minimum
specified labours with sufficient
experience in P.Way working.
physically fit labours plus 1 Mate. Day
N o t e : (1) In case, contractor
provides less no. of Labour/Mate or
for non availability of vehicle,
payment will be deducted for each
such person or non-availability of
vehicle @ 20% of the accepted
item rate, separately for each
shortfall. (2) The Contractor shall
keep one pick up Truck of minimum
1.5T payload capacity with Driver
all the time and all expenditures for
running at an average of 80 kms
per day shall be born by the
CAO-CN-RSP-MS-ENGINEERING/SOUTHERN RLY
Manufacturing, fabricating and
supplying retro-reflective
Engineering Indicator boards, made
of 2mm thick aluminium sheet or
3mm thick aluminium composite
sheet, face to be fully covered with
high intensity encapsulated type
heat activated retro-reflective
sheeting conforming to type-IV of
ASTM-D4956-01 in yellow & black
or other colour combination
including subject matter, message,
symbols, borders etc. as approved
by Engineer In-charge or as per
IRPWM guidelines, pasted on
substrate by an adhesive backing
which shall be activated by
applying heat and pressure
conforming to class-2 of ASTM-D-
4956-01 and fixing the same with
suitable sized aluminium alloy
rivets @ 20 cm c/c to back-support
frame of M.S. angle iron of size
25mm x25mm x 3mmprovided all
along the edges of board with theft
resistant measures back side of
board shall be with non-peelable
weatherproof paint, consisting of
one coat of zinc chromate primer
and two coats of epoxy paint.
Vertical post shall have black &
white anti-corrosive paint or
powder coating complete, as
1400mmx400mm with back
support frame fixed to vertical post
of MS angle of size
50mmx50mmx6mm of 3650 mm
equilateral triangular shape having
each side of 1000mm with back
support frame fixed to vertical post
of MS angle of size
50mmx50mmx6mm of 3650 mm
Circular shape having diameter of
1000mm with back support frame
welded to vertical post of MS angle
of size 50mmx50mmx6mm of 3950
Schedule H3-(ITEMS OF WORKS THAT ARE COVERED UNDER USSOR 2021- WORKS CONNECTED
WITH TEMPORARY ARRANGEMENTS) (LC 558)
ITEMS OF WORKS THAT ARE COVERED UNDER USSOR 2021- WORKS CONNECTED WITH
TEMPORARY ARRANGEMENTS) (LC 558)
S No. Item No Description of Item Unit Qty Rate Amount
CAO-CN-RSP-MS-ENGINEERING/SOUTHERN RLY
Provision of barricading with
contractor's bamboos / ballies
vertical post of 100mm dia. planted
at every 2m interval, projecting at
least 1.5m above ground level and
driven firmly (minimum 0.5m)
inside ground and including
painting verticals & horizontals with
red luminous paints / strips at
alternative bay on barricade.
Barricades shall be maintained
through out the execution of the
w o r k and shall be removed in
workman like manner on
completion of the work only after
instruction of Engineer in-Charge.
Note: (1) 60% payment shall be
made on provision of barricading at
work-site and balance 40%
payment after removal of
barricades. (2) The released
bamboos / ballies shall be the
property of the Contractor.
members of minimum 50mm dia.
ballast from track, duly digging /
scarifying ballast by beaters / wire
brushes or any mechanical means,
leveling and dressing formation
with specified cross slope after
salvaging ballast, separating muck
by screening the salvaged ballast
with contractor's 20mm size sieve,
stacking of screened ballast for
measurement, disposing off muck
at specified locations with all lead &
lifts as directed by Engineer in-
charge. Note: Payment shall be
made for quantity of ballast
stacked after screening of retrieved
ballast from track.
Providing Caution Watchman at a
location where caution order is
imposed and ensuring to be on
continuous vigil and exhibit
necessary hand signals to the
trains for their passage over
caution spot. Note: 1) Prescribed
protection equipment shall be
supplied by Railways and the same
shall be returned after work is over.
2) If Contractor fails to post
watchman at any time during one
day, penalty at double the
accepted rates will be levied and 3)
The watchman nominated by the
contractor will be screened for
suitability as per Railway norms.
CAO-CN-RSP-MS-ENGINEERING/SOUTHERN RLY
Maintenance of track on main line
& loops, Points & crossings etc.
including special attention to
section for carrying out various
maintenance works listed in Indian
Railways P.Way Manual / Bridge
Manual for safe running of goods
and passenger trains with
contractor's tools / labours etc.
complete, as directed by Engineer
in-charge. Note: Contractor shall
arrange one gang at any point of
time comprising of minimum
specified labours with sufficient
experience in P.Way working.
physically fit labours plus 1 Mate. Day
N o t e : (1) In case, contractor
provides less no. of Labour/Mate or
for non availability of vehicle,
payment will be deducted for each
such person or non-availability of
vehicle @ 20% of the accepted
item rate, separately for each
shortfall. (2) The Contractor shall
keep one pick up Truck of minimum
1.5T payload capacity with Driver
all the time and all expenditures for
running at an average of 80 kms
per day shall be born by the
Manufacturing, fabricating and
supplying retro-reflective
Engineering Indicator boards, made
of 2mm thick aluminium sheet or
3mm thick aluminium composite
sheet, face to be fully covered with
high intensity encapsulated type
heat activated retro-reflective
sheeting conforming to type-IV of
ASTM-D4956-01 in yellow & black
or other colour combination
including subject matter, message,
symbols, borders etc. as approved
by Engineer In-charge or as per
IRPWM guidelines, pasted on
substrate by an adhesive backing
which shall be activated by
applying heat and pressure
conforming to class-2 of ASTM-D-
4956-01 and fixing the same with
suitable sized aluminium alloy
rivets @ 20 cm c/c to back-support
frame of M.S. angle iron of size
25mm x25mm x 3mmprovided all
along the edges of board with theft
resistant measures back side of
board shall be with non-peelable
weatherproof paint, consisting of
one coat of zinc chromate primer
and two coats of epoxy paint.
Vertical post shall have black &
white anti-corrosive paint or
powder coating complete, as
5 202021 Caution Indicator Board of size Each 8.00 7028.86 56230.88
1400mmx400mm with back
support frame fixed to vertical post
of MS angle of size
50mmx50mmx6mm of 3650 mm
CAO-CN-RSP-MS-ENGINEERING/SOUTHERN RLY
equilateral triangular shape having
each side of 1000mm with back
support frame fixed to vertical post
of MS angle of size
50mmx50mmx6mm of 3650 mm
Circular shape having diameter of
1000mm with back support frame
welded to vertical post of MS angle
of size 50mmx50mmx6mm of 3950
Schedule H4-ITEMS OF WORKS THAT ARE COVERED UNDER USSOR 2021- WORKS CONNECTED
WITH TEMPORARY ARRANGEMENTS) (LC 574)
ITEMS OF WORKS THAT ARE COVERED UNDER USSOR 2021- WORKS CONNECTED WITH
TEMPORARY ARRANGEMENTS) (LC 574)
S No. Item No Description of Item Unit Qty Rate Amount
Provision of barricading with
contractor's bamboos / ballies
vertical post of 100mm dia. planted
at every 2m interval, projecting at
least 1.5m above ground level and
driven firmly (minimum 0.5m)
inside ground and including
painting verticals & horizontals with
red luminous paints / strips at
alternative bay on barricade.
Barricades shall be maintained
through out the execution of the
w o r k and shall be removed in
workman like manner on
completion of the work only after
instruction of Engineer in-Charge.
Note: (1) 60% payment shall be
made on provision of barricading at
work-site and balance 40%
payment after removal of
barricades. (2) The released
bamboos / ballies shall be the
property of the Contractor.
members of minimum 50mm dia.
ballast from track, duly digging /
scarifying ballast by beaters / wire
brushes or any mechanical means,
leveling and dressing formation
with specified cross slope after
salvaging ballast, separating muck
by screening the salvaged ballast
with contractor's 20mm size sieve,
stacking of screened ballast for
measurement, disposing off muck
at specified locations with all lead &
lifts as directed by Engineer in-
charge. Note: Payment shall be
made for quantity of ballast
stacked after screening of retrieved
ballast from track.
CAO-CN-RSP-MS-ENGINEERING/SOUTHERN RLY
Providing Caution Watchman at a
location where caution order is
imposed and ensuring to be on
continuous vigil and exhibit
necessary hand signals to the
trains for their passage over
caution spot. Note: 1) Prescribed
protection equipment shall be
supplied by Railways and the same
shall be returned after work is over.
2) If Contractor fails to post
watchman at any time during one
day, penalty at double the
accepted rates will be levied and 3)
The watchman nominated by the
contractor will be screened for
suitability as per Railway norms.
Maintenance of track on main line
& loops, Points & crossings etc.
including special attention to
section for carrying out various
maintenance works listed in Indian
Railways P.Way Manual / Bridge
Manual for safe running of goods
and passenger trains with
contractor's tools / labours etc.
complete, as directed by Engineer
in-charge. Note: Contractor shall
arrange one gang at any point of
time comprising of minimum
specified labours with sufficient
experience in P.Way working.
physically fit labours plus 1 Mate. Day
N o t e : (1) In case, contractor
provides less no. of Labour/Mate or
for non availability of vehicle,
payment will be deducted for each
such person or non-availability of
vehicle @ 20% of the accepted
item rate, separately for each
shortfall. (2) The Contractor shall
keep one pick up Truck of minimum
1.5T payload capacity with Driver
all the time and all expenditures for
running at an average of 80 kms
per day shall be born by the
CAO-CN-RSP-MS-ENGINEERING/SOUTHERN RLY
Manufacturing, fabricating and
supplying retro-reflective
Engineering Indicator boards, made
of 2mm thick aluminium sheet or
3mm thick aluminium composite
sheet, face to be fully covered with
high intensity encapsulated type
heat activated retro-reflective
sheeting conforming to type-IV of
ASTM-D4956-01 in yellow & black
or other colour combination
including subject matter, message,
symbols, borders etc. as approved
by Engineer In-charge or as per
IRPWM guidelines, pasted on
substrate by an adhesive backing
which shall be activated by
applying heat and pressure
conforming to class-2 of ASTM-D-
4956-01 and fixing the same with
suitable sized aluminium alloy
rivets @ 20 cm c/c to back-support
frame of M.S. angle iron of size
25mm x25mm x 3mmprovided all
along the edges of board with theft
resistant measures back side of
board shall be with non-peelable
weatherproof paint, consisting of
one coat of zinc chromate primer
and two coats of epoxy paint.
Vertical post shall have black &
white anti-corrosive paint or
powder coating complete, as
1400mmx400mm with back
support frame fixed to vertical post
of MS angle of size
50mmx50mmx6mm of 3650 mm
equilateral triangular shape having
each side of 1000mm with back
support frame fixed to vertical post
of MS angle of size
50mmx50mmx6mm of 3650 mm
Circular shape having diameter of
1000mm with back support frame
welded to vertical post of MS angle
of size 50mmx50mmx6mm of 3950
Schedule I1-ITEMS OF WORKS COVERED UNDER DSR 2021- FOR DISMATLING OF GATE LODGE, ETC
Item- 33 ITEMS OF WORKS COVERED UNDER DSR 2021- FOR DISMATLING OF GATE LODGE, ETC (LC 549)
S No. Item No Description of Item Unit Qty Rate Amount
15.0 DISMANTLING AND DEMOLISHING
Demolishing cement concrete
manually/ by mechanical means
15.2 including disposal of material
within 50 metres lead as per
direction of Engineer - in - charge.
mix (i/c equivalent design mix)
CAO-CN-RSP-MS-ENGINEERING/SOUTHERN RLY
by mechanical means including
stacking of steel bars and disposal
of unserviceable material within 50
metres lead as per direction of
Engineer - in- charge.
Demolishing brick work manually/
by mechanical means including
stacking of serviceable material
and disposal of unserviceable
material within 50 metres lead as
per direction of Engineer-in-charge.
Demolishing stone rubble masonry
manually/ by mechanical means
including stacking of serviceable
15.9 material and disposal of
unserviceable material within 50
metres lead as per direction of
Engineer-in-charge :
Dismantling doors, windows and
clerestory windows (steel or wood)
shutter including chowkhats,
architrave, holdfasts etc. complete
and stacking within 50 metres lead
15.18 Dismantling steel work in built up Kg 500 4.65 2325
sections in angles, tees, flats and
channels including all gusset
6 plates, bolts, nuts, cutting rivets,
welding etc. including
dismembering and stacking within
50 metres lead.
by mechanical means in built up
7 sections without dismembering and
stacking within 50 metres lead as
per direction of Engineer-in-charge.
Schedule I2-ITEMS OF WORKS COVERED UNDER DSR 2021- FOR DISMATLING OF GATE LODGE, ETC
Item- 34 ITEMS OF WORKS COVERED UNDER DSR 2021- FOR DISMATLING OF GATE LODGE, ETC (LC 543)
S No. Item No Description of Item Unit Qty Rate Amount
14.0 REPAIRS TO BUILDING
14.75AS ROUTINE MAINTENANCE WORK
including disposal of dismantled
1 materials i/c malba all complete as
per directions of Engineer-in-
15.0 DISMANTLING AND DEMOLISHING
Demolishing cement concrete
manually/ by mechanical means
15.2 including disposal of material
within 50 metres lead as per
direction of Engineer - in - charge.
mix (i/c equivalent design mix)
by mechanical means including
stacking of steel bars and disposal
of unserviceable material within 50
metres lead as per direction of
Engineer - in- charge.
CAO-CN-RSP-MS-ENGINEERING/SOUTHERN RLY
Demolishing brick work manually/
by mechanical means including
stacking of serviceable material
and disposal of unserviceable
material within 50 metres lead as
per direction of Engineer-in-charge.
Demolishing stone rubble masonry
manually/ by mechanical means
including stacking of serviceable
15.9 material and disposal of
unserviceable material within 50
metres lead as per direction of
Engineer-in-charge :
Dismantling doors, windows and
clerestory windows (steel or wood)
shutter including chowkhats,
architrave, holdfasts etc. complete
and stacking within 50 metres lead
15.18 Dismantling steel work in built up Kg 400 4.65 1860
sections in angles, tees, flats and
channels including all gusset
8 plates, bolts, nuts, cutting rivets,
welding etc. including
dismembering and stacking within
50 metres lead.
by mechanical means in built up
9 sections without dismembering and
stacking within 50 metres lead as
per direction of Engineer-in-charge.
Dismantling tile work in floors and
roofs laid in cement mortar
including stacking material within
50 metres lead.
Dismantling precast concrete or
stone slabs in walls, partition walls
etc. including stacking within 50
Dismantling G.I. pipes (external
work) including excavation and
refilling trenches after taking out
15.44 the pipes, manually/ by mechanical
means including stacking of pipes
within 50 metres lead as per
direction of Engineer-in-charge :
15.56 Dismantling old plaster or skirting Sqm 90 45.05 4054.5
raking out joints and cleaning the
13 surface for plaster including
disposal of rubbish to the dumping
ground within 50 metres lead.
Schedule I3-ITEMS OF WORKS COVERED UNDER DSR 2021- FOR DISMATLING OF GATE LODGE, ETC
Item- 35 ITEMS OF WORKS COVERED UNDER DSR 2021- FOR DISMATLING OF GATE LODGE, ETC (LC 558)
S No. Item No Description of Item Unit Qty Rate Amount
15.0 DISMANTLING AND DEMOLISHING
CAO-CN-RSP-MS-ENGINEERING/SOUTHERN RLY
Demolishing cement concrete
manually/ by mechanical means
15.2 including disposal of material
within 50 metres lead as per
direction of Engineer - in - charge.
mix (i/c equivalent design mix)
by mechanical means including
stacking of steel bars and disposal
of unserviceable material within 50
metres lead as per direction of
Engineer - in- charge.
Demolishing brick work manually/
by mechanical means including
stacking of serviceable material
and disposal of unserviceable
material within 50 metres lead as
per direction of Engineer-in-charge.
Demolishing stone rubble masonry
manually/ by mechanical means
including stacking of serviceable
15.9 material and disposal of
unserviceable material within 50
metres lead as per direction of
Engineer-in-charge :
Dismantling doors, windows and
clerestory windows (steel or wood)
shutter including chowkhats,
architrave, holdfasts etc. complete
and stacking within 50 metres lead
15.18 Dismantling steel work in built up Kg 500 4.65 2325
sections in angles, tees, flats and
channels including all gusset
6 plates, bolts, nuts, cutting rivets,
welding etc. including
dismembering and stacking within
50 metres lead.
by mechanical means in built up
7 sections without dismembering and
stacking within 50 metres lead as
per direction of Engineer-in-charge.
Schedule I4-ITEMS OF WORKS COVERED UNDER DSR 2021- FOR DISMATLING OF GATE LODGE, ETC
Item- 36 ITEMS OF WORKS COVERED UNDER DSR 2021- FOR DISMATLING OF GATE LODGE, ETC (LC 574)
S No. Item No Description of Item Unit Qty Rate Amount
14.0 REPAIRS TO BUILDING
14.75AS ROUTINE MAINTENANCE WORK
including disposal of dismantled
1 materials i/c malba all complete as
per directions of Engineer-in-
15.0 DISMANTLING AND DEMOLISHING
Demolishing cement concrete
manually/ by mechanical means
15.2 including disposal of material
within 50 metres lead as per
direction of Engineer - in - charge.
CAO-CN-RSP-MS-ENGINEERING/SOUTHERN RLY
mix (i/c equivalent design mix)
by mechanical means including
stacking of steel bars and disposal
of unserviceable material within 50
metres lead as per direction of
Engineer - in- charge.
Demolishing brick work manually/
by mechanical means including
stacking of serviceable material
and disposal of unserviceable
material within 50 metres lead as
per direction of Engineer-in-charge.
Demolishing stone rubble masonry
manually/ by mechanical means
including stacking of serviceable
15.9 material and disposal of
unserviceable material within 50
metres lead as per direction of
Engineer-in-charge :
Dismantling doors, windows and
clerestory windows (steel or wood)
shutter including chowkhats,
architrave, holdfasts etc. complete
and stacking within 50 metres lead
15.18 Dismantling steel work in built up Kg 400 4.65 1860
sections in angles, tees, flats and
channels including all gusset
8 plates, bolts, nuts, cutting rivets,
welding etc. including
dismembering and stacking within
50 metres lead.
15.19 Dismantling steel work manually/ Kg 400 3.2 1280
by mechanical means in built up
9 sections without dismembering and
stacking within 50 metres lead as
per direction of Engineer-in-charge.
Dismantling tile work in floors and
roofs laid in cement mortar
including stacking material within
50 metres lead.
Dismantling precast concrete or
stone slabs in walls, partition walls
etc. including stacking within 50
Dismantling G.I. pipes (external
work) including excavation and
refilling trenches after taking out
15.44 the pipes, manually/ by mechanical
means including stacking of pipes
within 50 metres lead as per
direction of Engineer-in-charge :
15.56 Dismantling old plaster or skirting Sqm 90 45.05 4054.5
raking out joints and cleaning the
13 surface for plaster including
disposal of rubbish to the dumping
ground within 50 metres lead.
CAO-CN-RSP-MS-ENGINEERING/SOUTHERN RLY
Schedule Schedule J1-ITEMS COVERED UNDER USSOR 2021 (P WAY ITEMS) (LC 549)
Item- 37 ITEMS COVERED UNDER USSOR 2021 (P WAY ITEMS) (LC 549)
S No. Item No Description of Item Unit Qty Rate Amount
Recoupment of ballast in running
line with railway's stone ballast
from existing stacks available
along alignment either on top of
cutting or on cess or at toe of bank
by head leads or by any other
means and spreading to make up
deficiency in the required profile
with contractor's labour, tools &
plants, as directed by Engineer-in-
charge . Note: Payment shall be
made based on ballast stack
each additional average lead of
50m or part thereof when total
average lead exceeds 50m, but up
to 250m. Note: This item may be
used only in exceptional
circumstance under prior order on
per procedure prescribed in latest
edition of IRPWM including cess
dressing on both sides of track. The
work will include removing excess
ballast from track and putting the
same in crib and shoulder by
leading to a maximum of 50m
including crossing of track,
deweeding on ballast section etc
and as directed by Engineer-In
Manufacturing and Supply of
Alumino thermic welding portions
approved by RDSO for welding of
rails 52Kg/60Kg/60EI-R260 kg for
25mm gap by the process of AT
welding along with complete
accessories confirming to the
specification laid down in Indian
Railway Standard specification
No.IRST-19-2020 up to date
correction slips with Single shot
crucible fitted with Automatic
Tapping Thimble, 3 pieces pre
fabricated mould (Zircon washed)
manually pressed using
compressed air petrol/LPG pre
heating for execution of welding of
rail joint as directed by the
engineer in charge at site. Note: 1.
The accessories along with welding
portion shall be supplied as per
Annexure-I of the IRUSSOR - 2021.
2. Rate is inclusive of
transportation of above to
SSE/P.Way stores.
CAO-CN-RSP-MS-ENGINEERING/SOUTHERN RLY
25mm gap 'in-situ' welding during
traffic block and finishing of weld to
meet the prescribed tolerances and
pass all stipulated tests with all
required labour, materials,
consumables, tools, equipments
etc. to complete the work in all
respect as per IR's "Manual for
Fusion Welding of Rails by Alumino
- Thermic Process" with latest
correction slips, including marking
of welded joint, painting weld collar
with anticorrosive paint, restoration
of track near weld joint to original
position and fixing of joggled fish
plate at new weld, to be removed
after passing of weld in USFD test
as directed by Engineer in charge.
Note: 1. Welding shall be carried
o u t only by trained welder having
valid competency certificate using
RDSO approved Alumino Thermit
Welding Portions, 3 piece
prefabricated mould (ZIRCON
WASHED) manually pressed, Single
shot crucible fitted with auto
tapping thimble and Compressed
Air Petrol/LPG preheating technique
as per RDSO Specification No
IRST/19-2020 with latest
amendment. 2. Hydraulic Weld
trimmer shall be used for chipping
and profile Grinder for finishing. 3.
Only required nos. of Joggled fish
plates shall be supplied by Railway
at nearest P. Way Stores and the
same shall be returned at nearest
P. Way Store or at other location as
per direction of Engineer-in-Charge
after release from track. All other
items required shall be supplied by
the Contractor.
Providing Caution Watchman at a
location where caution order is
imposed and ensuring to be on
continuous vigil and exhibit
necessary hand signals to the
trains for their passage over
caution spot. Note: 1) Prescribed
protection equipment shall be
supplied by Railways and the same
shall be returned after work is over.
2) If Contractor fails to post
watchman at any time during one
day, penalty at double the
accepted rates will be levied and 3)
The watchman nominated by the
contractor will be screened for
suitability as per Railway norms.
Through packing of track, as per
procedure prescribed in latest
edition of Indian Railways
Permanent Way Manual
Density of 1540 Sleepers/Km or
CAO-CN-RSP-MS-ENGINEERING/SOUTHERN RLY
De-stressing of LWR/CWR track of
any density under traffic line block
with contractor's labours, tools,
equipments and consumables
inclusive of all lead & lift. Activities
include cutting of LWR/CWR into
convenient panels of specified
length, removal of ERCs, liners,
greasing of ERCs and liner contact
area, lifting rails and keeping them
on rollers provided at every 15
sleepers, working out elongation of
rail ends depending on prevailing
site conditions, pulling rails with
the help of Hydraulic Tensor to
achieve the desired elongation,
cutting rails, as required, removing
rollers and placing rail in position,
re-fixing ERCs & liners and
adjustment of gap at SEJs : Note:
(1) Welding of rail joints will be
paid separately. (2) Rail cutting and
Hole drilling shall be paid
separately. (3) Opening and closing
of LC if required will be paid
separately. (4) As per procedure
prescribed in latest edition of
IRPWM & CE's Circulars for
destressing of LWR/CWR, if any.
Loading of 52kg / 60kg PSC normal
line and special sleepers up to 2.75
metre length in Depot / Station /
Mid-section between stations in a
neat manner to departmental
material train (DMT) or contractor's
/ Railway's Truck/Trailer with crane
or any other means including
crossing of one track with free lead
up to 250 metre and lift up to 5
metre, if required with contractor's
labour, tools & plants, machinery,
consumables etc. Note: In case of
any damage to sleeper during
loading, penalty @ 50% of the all
inclusive cost of sleeper shall be
block where handling by
mechanical means is not possible
Transportation of Rails, sleepers,
switches, crossings, SEJs and Glued
Joints by road vehicles for different
leads. Note: 1 . Lead shall be the
shortest motorable road length
between the points of loading and
unloading. 2. Loading and
unloading shall be paid extra under
relevant items.
150 Km over item no. 172057
CAO-CN-RSP-MS-ENGINEERING/SOUTHERN RLY
Unloading of 52kg / 60kg PSC line
and special sleepers up to 2.75
metre length in Depot / Station /
Mid-section between stations in
neat manner for Railway usage
from departmental material train
(DMT) or contractor's / Railway's
Truck/Trailer with crane or any
other means including crossing of
one track and lead up to 250 metre
& lift up to 5 metre with
contractor's labour, tools & plants,
machinery, consumables etc. Note:
In case of any damage to sleeper
during loading, penalty @ 50% of
the all inclusive cost of sleeper
shall be levied.
Spreading of New / SH , normal or
wider base PSC sleepers from stack
along track on either side for
different leads with all lifts by any
additional lead of every 500m or
part thereof beyond 500 m
15 181020 Dismantling existing check rail of RM 60.00 217.32 13039.20
Level Crossing, blocks, bolts & nuts
and stacking these in a countable
manner near LC, free from any
infringements as directed by
Engineer in-charge.
16 181030 Dismantling exiting Rail Height Each 2.00 4365.86 8731.72
Gauge carefully and stacking the
released material in countable
m a n n e r , free from any
infringements as directed by
Engineer in-Charge including
removal of cement concrete
foundation and making surface
17 181040 Dismantling existing lifting barrier Set 2.00 28590.06 57180.12
along with winch assembly and
other components like boom,
fringes, locking arrangements,
pedestal, boom rest, locking
rods/wires, pulley stakes, turn out
wheels, 'A' base and other
materials connected with
functioning of lifting barrier,
removing engineering indicators on
track and level crossing road
signages without any damage
including demolishing concrete
base of existing structures, filling,
ramming and levelling the ground
disturbed during demolition,
clearing debris and stacking all
released material in a neat and
countable manner and clear of
infringements, as directed. Note:
Barriers on both sides of level
crossing constitute one set.
CAO-CN-RSP-MS-ENGINEERING/SOUTHERN RLY
Guard Rail by cutting and bending
to required shape & RDSO's
approved drawings. Note: (1) Rails
shall be supplied by Railways. (2)
One set consists of two rails i.e.
both left and right.
portion of guard rails of any rail
section over PSC sleepers including
fixing of with all fittings, including
leading of rails and fittings,
squaring and adjusting spacing of
sleepers as required, providing
nose blocks duly cutting wooden
blocks supplied by railways and
fixing it with bolts of 16mm dia as
directed complete and finished as
per RDSO's approved drawing.
Note: 1.One set consists of LH & RH
side rails of one end. 2.Required
P.Way fittings will be supplied at
SSE stores depot.
with drill twist in the foot of guard
rails for fixing guard rails on bridge
Schedule Schedule J3-ITEMS COVERED UNDER USSOR 2021 (P WAY ITEMS) LC 558
Item- 38 ITEMS COVERED UNDER USSOR 2021 (P WAY ITEMS) LC 558
S No. Item No Description of Item Unit Qty Rate Amount
Recoupment of ballast in running
line with railway's stone ballast
from existing stacks available
along alignment either on top of
cutting or on cess or at toe of bank
by head leads or by any other
means and spreading to make up
deficiency in the required profile
with contractor's labour, tools &
plants, as directed by Engineer-in-
charge . Note: Payment shall be
made based on ballast stack
each additional average lead of
50m or part thereof when total
average lead exceeds 50m, but up
to 250m. Note: This item may be
used only in exceptional
circumstance under prior order on
per procedure prescribed in latest
edition of IRPWM including cess
dressing on both sides of track. The
work will include removing excess
ballast from track and putting the
same in crib and shoulder by
leading to a maximum of 50m
including crossing of track,
deweeding on ballast section etc
and as directed by Engineer-In
CAO-CN-RSP-MS-ENGINEERING/SOUTHERN RLY
Manufacturing and Supply of
Alumino thermic welding portions
approved by RDSO for welding of
rails 52Kg/60Kg/60EI-R260 kg for
25mm gap by the process of AT
welding along with complete
accessories confirming to the
specification laid down in Indian
Railway Standard specification
No.IRST-19-2020 up to date
correction slips with Single shot
crucible fitted with Automatic
Tapping Thimble, 3 pieces pre
fabricated mould (Zircon washed)
manually pressed using
compressed air petrol/LPG pre
heating for execution of welding of
rail joint as directed by the
engineer in charge at site. Note: 1.
The accessories along with welding
portion shall be supplied as per
Annexure-I of the IRUSSOR - 2021.
2. Rate is inclusive of
transportation of above to
SSE/P.Way stores.
25mm gap 'in-situ' welding during
traffic block and finishing of weld to
meet the prescribed tolerances and
pass all stipulated tests with all
required labour, materials,
consumables, tools, equipments
etc. to complete the work in all
respect as per IR's "Manual for
Fusion Welding of Rails by Alumino
- Thermic Process" with latest
correction slips, including marking
of welded joint, painting weld collar
with anticorrosive paint, restoration
of track near weld joint to original
position and fixing of joggled fish
plate at new weld, to be removed
after passing of weld in USFD test
as directed by Engineer in charge.
Note: 1. Welding shall be carried
o u t only by trained welder having
valid competency certificate using
RDSO approved Alumino Thermit
Welding Portions, 3 piece
prefabricated mould (ZIRCON
WASHED) manually pressed, Single
shot crucible fitted with auto
tapping thimble and Compressed
Air Petrol/LPG preheating technique
as per RDSO Specification No
IRST/19-2020 with latest
amendment. 2. Hydraulic Weld
trimmer shall be used for chipping
and profile Grinder for finishing. 3.
Only required nos. of Joggled fish
plates shall be supplied by Railway
at nearest P. Way Stores and the
same shall be returned at nearest
P. Way Store or at other location as
per direction of Engineer-in-Charge
after release from track. All other
items required shall be supplied by
the Contractor.
CAO-CN-RSP-MS-ENGINEERING/SOUTHERN RLY
Through packing of track, as per
procedure prescribed in latest
edition of Indian Railways
Permanent Way Manual
6 131011 For PSC sleeper Track with Sleeper TRM 150.00 123.11 18466.50
Density of 1540 Sleepers/Km or
De-stressing of LWR/CWR track of
any density under traffic line block
with contractor's labours, tools,
equipments and consumables
inclusive of all lead & lift. Activities
include cutting of LWR/CWR into
convenient panels of specified
length, removal of ERCs, liners,
greasing of ERCs and liner contact
area, lifting rails and keeping them
on rollers provided at every 15
sleepers, working out elongation of
rail ends depending on prevailing
site conditions, pulling rails with
the help of Hydraulic Tensor to
achieve the desired elongation,
cutting rails, as required, removing
rollers and placing rail in position,
re-fixing ERCs & liners and
adjustment of gap at SEJs : Note:
(1) Welding of rail joints will be
paid separately. (2) Rail cutting and
Hole drilling shall be paid
separately. (3) Opening and closing
of LC if required will be paid
separately. (4) As per procedure
prescribed in latest edition of
IRPWM & CE's Circulars for
destressing of LWR/CWR, if any.
Loading of 52kg / 60kg PSC normal
line and special sleepers up to 2.75
metre length in Depot / Station /
Mid-section between stations in a
neat manner to departmental
material train (DMT) or contractor's
/ Railway's Truck/Trailer with crane
or any other means including
crossing of one track with free lead
up to 250 metre and lift up to 5
metre, if required with contractor's
labour, tools & plants, machinery,
consumables etc. Note: In case of
any damage to sleeper during
loading, penalty @ 50% of the all
inclusive cost of sleeper shall be
block where handling by
mechanical means is not possible
Transportation of Rails, sleepers,
switches, crossings, SEJs and Glued
Joints by road vehicles for different
leads. Note: 1 . Lead shall be the
shortest motorable road length
between the points of loading and
unloading. 2. Loading and
unloading shall be paid extra under
relevant items.
CAO-CN-RSP-MS-ENGINEERING/SOUTHERN RLY
150 Km over item no. 172057
Unloading of 52kg / 60kg PSC line
and special sleepers up to 2.75
metre length in Depot / Station /
Mid-section between stations in
neat manner for Railway usage
from departmental material train
(DMT) or contractor's / Railway's
Truck/Trailer with crane or any
other means including crossing of
one track and lead up to 250 metre
& lift up to 5 metre with
contractor's labour, tools & plants,
machinery, consumables etc. Note:
In case of any damage to sleeper
during loading, penalty @ 50% of
the all inclusive cost of sleeper
shall be levied.
Spreading of New / SH , normal or
wider base PSC sleepers from stack
along track on either side for
different leads with all lifts by any
additional lead of every 500m or
part thereof beyond 500 m
14 181020 Dismantling existing check rail of RM 60.00 217.32 13039.20
Level Crossing, blocks, bolts & nuts
and stacking these in a countable
manner near LC, free from any
infringements as directed by
Engineer in-charge.
15 181030 Dismantling exiting Rail Height Each 2.00 4365.86 8731.72
Gauge carefully and stacking the
released material in countable
m a n n e r , free from any
infringements as directed by
Engineer in-Charge including
removal of cement concrete
foundation and making surface
Guard Rail by cutting and bending
to required shape & RDSO's
approved drawings. Note: (1) Rails
shall be supplied by Railways. (2)
One set consists of two rails i.e.
both left and right.
portion of guard rails of any rail
section over PSC sleepers including
fixing of with all fittings, including
leading of rails and fittings,
squaring and adjusting spacing of
sleepers as required, providing
nose blocks duly cutting wooden
blocks supplied by railways and
fixing it with bolts of 16mm dia as
directed complete and finished as
per RDSO's approved drawing.
Note: 1.One set consists of LH & RH
side rails of one end. 2.Required
P.Way fittings will be supplied at
SSE stores depot.
CAO-CN-RSP-MS-ENGINEERING/SOUTHERN RLY
with drill twist in the foot of guard
rails for fixing guard rails on bridge
Schedule K1-ITEMS OF WORKS THAT ARE NOT COVERED UNDER USSOR 2021/DSR 2021 (P way
Item- 39 ITEMS OF WORKS THAT ARE NOT COVERED UNDER USSOR 2021/DSR 2021 (P way items)(LC 549)
S No. Item No Description of Item Unit Qty Rate Amount
1 1 Transportation of class-I and IIrails MT 10.00 2915.75 29157.50
up to 13m long, check railsetc.
available from any stationyard /
midsection/ LCs overSouthern
Railway outside theconcerned
Dy.CE's jurisdiction, torequired site
or specifiedConstruction Stores
Depotincluding collection of
releasedrails also, if any, from
along theRailway alignment,
leading to thenearest road
approach, loading,unloading and
stacking the samein a neat and
countable mannerwith contractor's
road vehicle,crew, labour, tools,
consumablestores with all leads
and lifts etc.complete and as
directed. Note:The weight of rails
for Class- IIwill be 95% of new rails.
For leadup to 100 km.
CAUTIONINDICATORS / ANY
OTHERBOARDS supplied at the
nearestconstruction stores depot
leadingto works spot, painting the
same,fixing the board in concrete
baseof CC 1:3:6 mix of size 0.30
x0.30 x 0.45 m including earthwork
excavation required
andmaintaining the boards
forrequired period and removing
thesame when no longer
requiredleading the handing over
to thenearest construction depot
withall leads and lifts etc.,
completeas directed.( All labour
and toolsby contractor, Cement
concretewhich will be paid
separatelyunder relevant
3 3 Manual replacement of existingPSC Each 85.00 547.73 46557.05
sleepers with PSC special sleepers
for guard rails under traffic
conditions to correct level, spacing,
gaugeand alignment with
necessaryfittings and fastenings
with initial kutcha packing to carry
traffic at20 Kmph. This would
includecontractor's labour, tools
andplants, vehicles,
consumables,fuel etc. and with all
lead and liftand crossing the track
where everrequired. This also
includestacking of released
materials atnominated places in
the yard ornearest construction
depot asdirected by the Engineer -
CAO-CN-RSP-MS-ENGINEERING/SOUTHERN RLY
PSCsleepers using 52Kg / 90R Track
railsunder the bridge portion as Metre
perDrg. No. RDSO/T- 4088
includingcutting and bending rails,
drillingholes for joints
wherevernecessary, fixing rails,
finishing joints, squaring and
adjustingspacing of sleepers as
requiredproviding nose blocks duly
cuttingcontractor's hard wood and
fixingit with bolts, leading and
stackingthe released / balance
materialsat nearest construction
storedepot with all leads and lifts
etc.complete and as directed.
(Payment will be made forfinished
track length of guardrails)
5 5 Removal of cables of any size and Metre 50.00 144.66 7233.00
nature viz. signal/tele/electrical
(HT/LT) existing below ground level
up to 2.00m depth without causing
any damage to the cables including
excavating the earth up to the
cable and refilling the earth after
the removal of cable and placing
the cable on the ground with all
leads, lifts, etc. complete as
directed. (All labour and materials,
consumables, tools nand plants,
machinery by contractor).
(Payment will be for all cables in
one trench of about 45 cm width
6 6 Re-laying of Railways cables below Metre 50.00 103.04 5152.00
ground level including excavation
of earth to the required ( up to
maximum 1.00m or as required)
and filling back the same after
laying the cables, without causing
any damage to the cable with all
lead, lift etc. complete as directed,
(All labour and materials,
consumables, tools and plants.
machinery by contractor).
(Payment will be for all cables in
one trench of about 45 cm width)
7 7 "Dismantling the rail barricading Each 100.00 97.46 9746.00
without any damage to the track
and return the rails full to nearby
places with good road approach
and stacking the same in a
countable manner at the
contractors cost with all lead and
lift and as directed by the Engineer
incharge (All tools, labour,
materials, consumables
etc.required by the contractor).
NOTE: (1).A detailed laid inventory
should be taken prior to
commencement of the work. (2).
Rates includes transportation of
loose fittings like ,fish plates etc to
the nearest store depot. (3) The
rate quoted above shall also
include leading of released rails to
the nearest location with road
approach with a maximum lead of
500m. (4) The item also includes
crossing of track and leading by dip
lorry under block if required..."
CAO-CN-RSP-MS-ENGINEERING/SOUTHERN RLY
fencing duly excavating around the
posts required, removing the posts
and pale and stacking the re usable
pale fencing posts at convenient
[places as directed by the
Engineer-incharge with all lead and
lift etc. complete."
Schedule K3-ITEMS OF WORKS THAT ARE NOT COVERED UNDER USSOR 2021/DSR 2021 (P way
Item- 40 ITEMS OF WORKS THAT ARE NOT COVERED UNDER USSOR 2021/DSR 2021 (P way items)(LC 558)
S No. Item No Description of Item Unit Qty Rate Amount
1 1 Transportation of class-I and IIrails MT 10.00 2915.75 29157.50
up to 13m long, check railsetc.
available from any stationyard /
midsection / LCs overSouthern
Railway outside theconcerned
Dy.CE's jurisdiction, torequired site
or specifiedConstruction Stores
Depotincluding collection of
releasedrails also, if any, from
along theRailway alignment,
leading to thenearest road
approach, loading,unloading and
stacking the samein a neat and
countable mannerwith contractor's
road vehicle,crew, labour, tools,
consumablestores with all leads
and lifts etc.complete and as
directed. Note:The weight of rails
for Class-IIwill be 95% of new rails.
For leadup to 100 km.
CAUTIONINDICATORS / ANY
OTHERBOARDS supplied at the
nearestconstruction stores depot
leadingto works spot, painting the
same,fixing the board in concrete
baseof CC 1:3:6 mix of size 0.30
x0.30 x 0.45 m including earthwork
excavation required
andmaintaining the boards
forrequired period and removing
thesame when no longer
requiredleading the handing over
to thenearest construction depot
withall leads and lifts etc.,
completeas directed.( All labour
and toolsby contractor, Cement
concretewhich will be paid
separatelyunder relevant
CAO-CN-RSP-MS-ENGINEERING/SOUTHERN RLY
3 3 Manual replacement of existingPSC Each 85.00 547.73 46557.05
sleepers with PSC special sleepers
for guard rails under traffic
conditions to correct level, spacing,
gaugeand alignment with
necessaryfittings and fastenings
with initial kutcha packing to carry
traffic at20 Kmph. This would
includecontractor's labour, tools
andplants, vehicles,
consumables,fuel etc. and with all
lead and liftand crossing the track
where everrequired. This also
includestacking of released
materials atnominated places in
the yard ornearest construction
depot asdirected by the Engineer -
PSCsleepers using 52Kg / 90R Track
railsunder the bridge portion as Metre
perDrg. No. RDSO/T-4088
includingcutting and bending rails,
drillingholes for joints
wherevernecessary, fixing rails,
finishing joints, squaring and
adjustingspacing of sleepers as
requiredproviding nose blocks duly
cuttingcontractor's hard wood and
fixingit with bolts, leading and
stackingthe released / balance
materialsat nearest construction
storedepot with all leads and lifts
etc.complete and as directed.
(Payment will be made forfinished
track length of guardrails)
5 5 Removal of cables of any size and Metre 50.00 161.97 8098.50
nature viz. signal/tele/electrical
(HT/LT) existing below ground level
up to 2.00m depth without causing
any damage to the cables including
excavating the earth up to the
cable and refilling the earth after
the removal of cable and placing
the cable on the ground with all
leads, lifts, etc. complete as
directed. (All labour and materials,
consumables, tools nand plants,
machinery by contractor).
(Payment will be for all cables in
one trench of about 45 cm width
6 6 Re-laying of Railways cables below Metre 50.00 103.04 5152.00
ground level including excavation
of earth to the required ( up to
maximum 1.00m or as required)
and filling back the same after
laying the cables, without causing
any damage to the cable with all
lead, lift etc. complete as directed,
(All labour and materials,
consumables, tools and plants.
machinery by contractor).
(Payment will be for all cables in
one trench of about 45 cm width)
CAO-CN-RSP-MS-ENGINEERING/SOUTHERN RLY
without any damage to the track
and return the rails full to nearby
places with good road approach
and stacking the same in a
countable manner at the
contractors cost with all lead and
lift and as directed by the Engineer
incharge (All tools, labour,
materials, consumables
etc.required by the contractor).
NOTE: (1).A detailed laid inventory
should be taken prior to
commencement of the work. (2).
Rates includes transportation of
loose fittings like ,fish plates etc to
the nearest store depot. (3) The
rate quoted above shall also
include leading of released rails to
the nearest location with road
approach with a maximum lead of
500m . (4) The item also includes
crossing of track and leading by dip
lorry under block if required..."
fencing duly excavating around the
posts required, removing the posts
and pale and stacking the re usable
pale fencing posts at convenient
[places as directed by the
Engineer-incharge with all lead and
lift etc. complete."
of stone ballast where the lead
involved is more than 500m and up
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .