Loading…
Loading…
880 results • Latest
Removal of silt in Dy.no 26,27,& 28 under KRNBC(at selected reaches)
Removal of silt and weeds from ch. 0.00 KM to 26.00 KM of Hampapura nala under Mirle series (at selected reaches)
Removal of silt in Ist,2nd & 3rd branch, pickup canals & uddi under CLBC(at selected reaches)
Removal of silt & Jungle in from 11th branch, Arjunahalli pickup and Galigekere pickup under CLBC.(at selected reaches)
Removal of Silt, jungle & weeds in Kallahalli branch, pickup canals & uddi under RSM (at selected reaches)
Removal of Silt & Jungle from CH. 0.00 KM to 30.00 KM of CRBC(at selected reaches)
Removal of silt & Jungle in 14th,Basappa hikkalu and Doddanalli uddi under CRBC (at selected reaches)
Removal of Silt & Jungle in Dy.No.54 &54 (A),55 & 58 of HLBC.
Removal of silt in Dy.no 29 & 35 under KRNBC(at selected reaches)
Removal of silt in Dy.no 11,10A and 10 under KRNBC (at selected reaches)
Removal of silt in Dy no 31 under KRNBC (at Selected Reaches)
Removal of silt in Kakanakaluve RBC and 4th branch, pickup canals & uddi under CLBC(at selected reaches)
Removal of silt in Dandigamma pickup, Kodiyamma pickup & Chairman uddi & Station uddi under 9th branch of CRBC under Kasaba Hobli (at selected reaches)
Removal of silt & Jungle in 7 and 8th Branches, pickup canals & uddi under CRBC (at selected reaches)
Removal of silt & Jungle in Ist & 2nd branches, pickup canals & uddi coming under CRBC (at selected reaches)
Removal of Silt & Jungle in Dy.No.83 & 85 of HLBC.
Restoration of Cauvery walkway bridge at KRS Brindavan Garden
Removal of silt in selected reaches of Madhavamanthri main canal and branch canal from chainage 0.00 to 29.00km for the year 2026-27
Removal of silt in selected reaches of distributories 5, 11 & 12 coming under Thuruganur branch canal for year 2026-27
Removal of silt in selected reaches of Ramaswamy main canal and uddinalas coming from chainage 41.00 to 80.00km for the year 2026-27
Removal of silt in selected reaches distributary No 2 and its sub Distributary and its minors and also Minors of Distributary No 1 coming under Link canal for the year 2026-27
Removal of silt in selected reaches of Ramaswamy main canal and uddinalas coming from chainage 0.00 to 40.00km for the year 2026-27
Removal of silt in selected reaches of BG pura canal, BG branch canal, BG pura branch extension canal, Kundur branch canal and its distributories for year 2026-27
Estimate for conducting topographical survey work using total station and and preparation of detailed estimate for reconstruction of aqueducts in LBC and Providing cement concrete box drain in LBC and protective work to sluices in LBC of Nonavinakere tank tiptur taluk
Estimate for Providing Electrification to Proposed Construction of Four Rooms and Toilet for Taluk Valmiki Bhavana at Tiptur Town. (Sub Estimate)
Improvements to road connecting doddankanahalli village to kemanpura village via virija canal 46th km to 43rd km atchkat road and tank road in srirangapattana taluk
Construction of Road bridge at Ch 16.10KM in virija canal and improvements to connecting roads in Srirangapattana taluk, Mandya district
Providing & fixing Metal crash barrier to selected critical reaches and improvements to service road in virija Canal from CH 33.00km to 69.00km in Srirangapattana Taluk, Mandya District
Providing and fixing rubber seals to radial crest gates, river sluice gates and sluice gates of KRBC of Kabini Dam
Epoxy painting to upstream face of radial crest gates, river sluice gates and sluice gates of Kabini left and right bank canal of Kabini dam.
Removal of silt and jungle in selected reaches from ch 38.00 to 60.00 km of SRDN canal.
Removal of silt and jungle LBC, RBC and draft halla of Channarayapatna Amanikere tank.
Repair works to pipe aqueduct at ch 2.275 - 2.285 km of D-30 under HLBC.
Reconstruction of PO at ch 475 M of D-28 and Removal of silt in selected reaches of D-27 and D-28 under HLBC.
Removal of silt and jungle from ch 75.00 to 108.00 km of SRDN.
Servicing of Pump and motors of BNT approach, BNT Exit and Nuggehalli LIS.
Removal of silt and jungle in BNT approach LIS RBC.
Removal of silt in selected reaches of D-41, 45 and D-42 coming under HLBC.
Removal of silt and jungle in selected reaches of D-31 and D-32 under HLBC.
Removal of silt and jungle in selected reaches minors 1 and 2 of D-33 under HLBC.
Removal of silt and jungle in selected reaches from ch 61.00 to 75.00 km of SRDN canal.
Removal of silt and jungle in selected reaches D-43 of HLBC and Repairs of aqueduct in D-43 under HLBC.
Removal of silt and jungle in D-46 and D-44 of HLBC.
Removal of silt and jungle in Ooginahally branch canal of SRDN.
Removal of silt and jungle in BNT Exit LIS LBC and Nugehalli LIS canal.
Reconstruction of damaged bund at Ch.3.50 km of 10th branch under CLBC
Removal of silt in Kallahalli branch Chamalapura branch , patel uddi, Kumbara hikkalu,17, & 17(A) hikkalu, pickup canals & uddi under 9th branch of CRBC
Plugging leakages and Reconstruction of damaged bund from Ch.38.00 Km to 63.00 km and 6th to 14th branches of CRBC (at selected reaches)
Removal of silt & Jungle in Right and left branches of Mullur Basavanakere,pickup canals & uddi under CRBC (at selected reaches)
Plugging leakages and Repairs to damaged bund from 1st to 5th Branches of RSM Canal