Loading
Loading…
Loading…
3 live3 closing this weekmost from CCE Lower Indra Irr. Project Nuapada
3 results • Latest
Remedial measures to leakage and damaged structures for treatment and durability enhancement of Drainage Gallery of Lower Indra rrigation Project.
Periodical maintenance with reaming and redrilling of vertical Drainage hole of Drainage Gallery of spillway of LIIP
Concurrent Evaluation Study in respect of Lower Indra Irrigation Project under PMKSY- AIBP and PMKSY- CADWM scheme for the Financial Years 2021-22 to 2025-26