Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
24 live2 closing this weekmost from CCE Potteru Irr.Project,Balimela
24 results • Latest
Desilting and resectioning RD0.00Km to RD1.320Km Lachhipeta S/M-III, RD0.00Km to RD0.570Km S/M-IV, RD0.00Km to RD0.420Km S/M-V, RD0.700Km to RD1.880Km Lachhipeta Minor, and repair of 5 falls at RD2.055Km, RD2.105Km, RD2.335Km and RD2.405Km Canal
Strengthen canal embankment RD0.480-2.230Km Motu Distributary, CC channeling RD0.495-0.600Km Boundary S/M-II, RD0.350-0.511Km Gurnamguda S/M-I, desilting and resectioning RD0.00-1.365Km Boundary S/M-II, desilting RD0.00-1.965Km Gurnamguda S/M-I.
CCC RD0.6-0.7Km Tigal S/M-I and RD0.3-0.455Km, desilting and resectioning RD1.96-2.23Km, repair 1.0M fall RD0.8Km Kancheru Minor, repair 1.5M fall RD1.38Km, addl pipe culvert RD1.3Km U.guda S/M-I, PDS repair RD8.73Km T.palli Minor Canal
C C ChannelinginbetweenRD.0.450KmtoRD.0.650KmandRe-sectioningfromRD.0.00KmtoRD.0.750KmofBejangiwadaS/M-I andCC Channeling in betweenRD.1.420KmtoRD.1.620Kmand Re-sectioning from RD.0.00Km to RD.1.620KmofBejangiwadaS/M-IIICanal.
Construction of Boundary wall of PHC (Bidi Labour) at Kalimela Canal.
WBM road from RD.10.025Km to RD.10.873Km of Udayagiri Distributary Canal.
Construction of VRB at RD.6.025Km of Jakalgundi Distributary Canal.
Repair of Falls, De-silting, Re-sectioning and Concrete channelling at vulnerable reaches in between RD.0.00Km to RD.1.115Km of Wollempalli S/M-IV Canal.
Cement Concrete Channeling from RD.1.100Km to RD.1.200Km, Repair of Fall at RD.15.126Km of Kunanpalli Distributary and repair of 1.0Mtr. Fall at RD.0.635Km of Lugal Minor Canal.
Construction of additional VRB at RD.0.200Km of Kamarguda S/M Canal-II.
WBM road from RD.16.240Km to RD.17.085Km of Udayagiri Distributary Canal.
Construction of VRB at RD.1.896Km of Jakalgundi Distributary Canal.
Construction of Rest Shed at Irrigation Colony, M.V-88 Canal.
Construction of addl. Culvert at RD.10.150Km of Kondaplli Minor Canal.
Repair of Fall at RD.0.510Km, Cement concrete channelling from RD.0.420Km to RD.0.510Km, bank Strengthening and De-silting from RD.1.245Km to RD.1.365Km of Supulur Minor Canal.
Construction of additional Pipe Culvert at RD.3.100Km of Lugal Minor and Renovation of VRB at RD.1.130Km of Lugal S/M Canal-II.
Construction of additional Culvert at RD.0.725Km and RD.0.755Km of Petta S/M-I for the year 2026-27 Canal.
Renovation of Culvert at RD.9.090Km of Tamanpalli Minor Canal.
Renovation of CD structure at RD.9.914Km, Jungle clearance and Re-sectioning from RD.8.667Km to RD.9.800Km of Jakalgundi Distributary Canal.
Construction of VRB at RD.0.320Km of Podia Sub-Minor-V and VRB at RD.0.450Km of Podia Minor-II Canal.
Construction of VRB at RD.8.813Km of Jakalgundi Distributary Canal.
Improvement to Service Road from RD 40.000 km to RD 60.000 km of TMC under Potteru Irrigation Project, Balimela
Improvement to Service Road from RD 0.000 km to RD 20.000 km of TMC under Potteru Irrigation Project, Balimela
Earth work,Filling foundation and plinth with sand and excavated materials, C.C.- M-15 , RCC work, HYSD bar, centering and shuttering 20 mm C,M, spreading of metal and sand, fixing of pressure relief valves, fixing of PVC crack, fixing of perforated