Loading…
Loading…
3 results • Latest
Slope protection work of river embankment of confluence point of River Sileru (Right Side) and River Saberi (Left Side) at Motu in the District of Malkangiri
Removing old revetment and approns and repacking with old stones and 40 % new stone including cost of materials, conveyance,cess, all taxes (excluding GST) and as directed by the Engineer-in-Charge
Earth work,sand filling, C.C.M15, Rigid centering and shuttering, Quarrying collecting and supplying, weep hole, spreading 40 and 20mm granite metal, filling with excavated material and earth filling by mechanical means etc.
Earth work in hard soil or graveely soil within 50 mm Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7 cm and laying in layers not exceeding 0.3m in depth and as per the direction of the E.I.C.
Construction of Conference Hall cum Office Building (Ground Floor) of office of the C.C.E., P.I.P. Balimela
CIVIL ITEMS