Loading…
Loading…
19 results • Latest
IMPROVEMENT TO ROAD FROM KHATIGUDA TO MURAN DAM SITE FROM RD 7.530 KM. TO RD 12.390 KM., UIDC, KHATIGUDA.
Making 50mm x 50mm furrows, 25mm deep, 45 degree to the center line of the road and at one metre interval in the existing thin bituminous wearing coarse including sweeping and disposal of excavated material within 1000mtr lead all cost of incidental charges and cess etc. complete as per approved specification and direction of the Engineer -in- Charge. (25 mm deep furrow cutting)
Canal Structural works
Earthwork in excavation in foundation in all kind of soil including rough dressing & levelling the bed of foundation, breaking the clods to maximum 5cm to 7cm and laying the excavated materials in the earmarked place in layers not exceeding 0.30 M in depth with all lead, lif & de-lift excluding GST & including labour charges tools and plants, taxes, cess, rehandling of the excavated materials, if required etc, all costs incidental to the work all complete as per specification and direction of the Engineer-in-Charge
Canal Structural works
Clearing shrub jungles uprooting stumps and small bushes and trees below 1M girth on premeasurement
Canal Structural Works
Dismantling and removing cement concrete including stacking the useful materials for reuse and removing the debrts within 50m lead.
Canal Structural Works
Clearing & Grubbing of road land including uprooting rank vegetation, grass, bushes shrubs, saplings & trees girth upto 300 mm,removal of stumps of trees cut earlier & disposal of unserviceale materials & stacking of serviceable materials to be used or auctioned, upto a lead of 1000 mtrs including removal & disposal of top organic soil not exceeding 150 mm thickness etc complete as 1 directed by Engineer in charge.
Canal Structural Works
Clearing & Grubbing of road land including uprooting rank vegetation, grass, bushes shrubs, saplings & trees girth upto 300 mm,removal of stumps of trees cut earlier & disposal of unserviceale materials & stacking of serviceable materials to be used or auctioned, upto a lead of 1000 mtrs including removal & disposal of top organic soil not exceeding 150 mm thickness etc complete as 1 directed by Engineer in charge.