Loading…
Loading…
Found 6 active tenders
6 results • Latest
Construction of Box Cell (Bridge) at RD 2490Mtr over Disty. No.10 of Machhagaon Main Canal
Earth work in excavation of foundation in all kinds of soil including dressing and levelling the foundation bed and depositing the excavated materials clear of work site with all leads, lifts, delifts and dewatering & shoring including removing bushes, stumps and any other foreign materials from the working area as well as from the foundation trenches with cost of all labour, T&P, hire and running charges of all machineries, labour cess etc. complete in all respects as per specification and direction of the Engineer-in-Charge.
Restoration to Bhargavi left bank from RD 19.65Km. to RD 19.87Km.
Clearing grass and removal ; rubbish up to a distance 50 Mtr. Outside disposal of unserviceable materials with all leads,lifts and delifts with cost of all labour T&P, labour welfare cess etc.complete as per direction the Engineer-in-charge.
Construction of VRB (Pile) on Prachi Dhara near Puraba.
Clearing grass and removal ; rubbish up to a distance 50 Mtr. Outside disposal of unserviceable materials with all leads,lifts and delifts with cost of all labour T&P, labour welfare cess etc.complete as per direction the Engineer-in-charge.
Improvement to Gabadiha T.R.E. near Siarocut.
Clearing grass and removal ; rubbish up to a distance 50 Mtr. Outside disposal of unserviceable materials with all leads,lifts and delifts with cost of all labour T&P, labour welfare cess etc.complete as per direction the Engineer-in-charge.
Improvement to Baulanga Sub-Minor from RD 0.728Km. to 0.900Km.
Earthwork in excavation of foundation in all kinds of soil within in 50 m initial lead and 1.5 m initial lift including rough dressing breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth & making fit for foundation with all labour, T&P,labour welfare cess etc. complete as per the direction of the Engineer-in-charge.
Construction of Foot Bridge on G.B.C. near Village Bisharpur Kudasahi.
Earthwork in excavation of foundation in all kinds of soil within in 50 m initial lead and 1.5 m initial lift including rough dressing breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth & making fit for foundation with all labour, T&P,labour welfare cess etc. complete as per the direction of the Engineer-in-charge.