Loading…
Loading…
378 results • Recent activity
Clearing and removing of water hyacinth , plastic , thermocol , garbage etc.including clearing of Jungles along the slope of bank for the period of 365 days from Ch. 0.00 m to 5130.00 m of Mahishdhara Khal under Howrah Drainage Sub-Division
Clearing , removing of water hyacinth including solid/semi solid compact mass , jungle cutting of Santra khal (Length 1.75 Km) for the period from 01.06.2026 to 31.05.2027 under Calcutta Drainage Outfall Sub-Division III of Calcutta Drainage Outfall
Constraction of Wooden Bridge over Khagra Canel near Habida Kaji house under Tambuldah 1 Gram Panchayet, Block -Canning-II under Calcutta Drainage Outfall Division
Clearing and removing of water hyacinth , plastic , thermocol , garbage etc.including clearing of Jungles along the slope of bank for the period of 365 days from 0.00 Km to 2.20 Km of Branch -VI of Howrah Drainage Channel
Clearing and removing of water hyacinth for the period 365 Days for the length 10.350 Km of Borjola Khal under Howrah Drainage Sub-Division of Lower Damodar construction Division during the year 2026-27
Clearing and removing of water hyacinth , plastic , thermocol , garbage etc.including clearing of Jungles along the slope of bank from ch.0.00 m to 1885 m of Nayabaz R.C.C. U trough Drain for the period of 365 days under Bankra II and III G.P