Loading…
Loading…
378 results • Recent activity
Clearing and removing of water hyacinth , plastic , thermocol , garbage etc including clearing of Jungles along the slope of bank from ch.0.00m to 800.0 m of of Branch channel IV and from ch. 0.00 to 6880.00 of Branch channel-V for 365 days
Clearing and removing of water hyacinth , plastic , thermocol , garbage etc.including clearing of Jungles along the slope of bank from ch. 3200 m to 4000.0 m of Sheorapota khal for the period of 365 days Sapuipara -Basukhati Chawakpara - Anandanaga
Clearing and removing of water hyacinth , plastic , thermocol , garbage etc.including clearing of Jungles along the slope of bank from ch.0.00 m to 3200.0 m of Sheorapota khal (U-trough) and 0.00 m to 675.0 m of Nayanjuli khal and 0.00 to 2000.0 m
Restoration work at Right Bank of River Hooghly for a total length of 40.00 metre at Karamchatala in Uluberia Municipality of Ward No. - 21 , in P.S-Uluberia, District-Howrah.
Assessment of existing bed profile of along ferry route for the appx length of 3 km near Lot 8 Kakdwip to sagar in the river Muriganga in respect of dredging for the Ganga Sagar Mela 2027 to be conducted by the River Research Institute under WB Irri
Maintenance and Repair work of Surjosen Bridge at ch1000 m of Ichapur Khal near BabanpurLockgateBazarMohonpur GP BarrackporeII Block PS MohonpurDistNorth 24 pgs Under Urban Drainage SubDivisionI of Urban Drainage Division during the year 2026_27