Loading…
Loading…
378 results • Recent activity
Clearing and removing water hyacinth and floating materials including jungle cutting for smooth drainage water of DD1 East Channel (between Ch. 1280.00 to 2775.00) for a length of 1.495 km from 1st June of 2026 to 31st May 2027 under MDD-II.
Clearing and removing water hyacinth and floating materials including jungle cutting for smooth drainage water of EE1 East Channel (between Ch. 1400.00 to 2200.00) for twelve (12) months under MDD-II for a length of 0.80 km from 1st June of 2026
Clearing and removing water hyacinth and floating materials for smooth drainage water and clearing thick and thorny jungles and long grass etc. of EE1 West Channel (between Ch. 00.00 to 940.00) for twelve (12) months for a length of 0.94 km from 1st
Making bamboo fencing along Right bank in between 1550.0 m to 2230.0 m maintenance of fencing along Left bank in between 1400.0 to 1700.0 m of EE1 East Branch Channel including canal side jungle cutting in between 3700.0 to 4100.0 m of Intercepting
Assessment of present cross sectional profile with topographical survey of Saheber Khal at Mouza Tipi Gopalpur Patua within Block Swarupnagar and Ghoragachha, Shibpur Keotsha buruj Soniya Atlia Sompur within Block Baduria of District North 24 pgs
Assessment of present capacity of Extended portion of LLL2K Sultanpur khal Drain of belgharia expressway within block PS Barrackpur for preparation of desiltaion Scheme by conducting hydrographic topographic survey under the jurisdiction EE UDD