Loading…
Loading…
383 results • Recent activity
Clearing drainage congestion in Babanpur Khal From chainage 1700 to chainage 1850 Metre for a length of 150 M in North Barrackpore Municipality BarrackporeII Block PSMohonpur Dist North 24 Parganas Under Urban Drainage Sub-Division NoI of Urban Drain
Clearing of congession from Udaipur branch khal for a length 338 metre by removing accumulated silt within Kamarhati municipality Dist North 24 Parganas under Urban Drainage Division during the year 2026_27.
Clearing drainage congestion under the bridge of Kalyani Expressway in Ichapur Khal for a length 45 metre inMohanpur GPBarrackporeII Block PSBasudebpur DistNorth 24 Parganas Under Urban Drainage SubDivision NoI of Urban Drainage Division during the
M/R to Topsia Regulator gates along with allied works at Topsia in P.S - Tiljala and Ward No - 66 of KMC under Calcutta Drainage Outfall Sub-Division no-I of Calcutta Drainage Outfall Division.
Emergent hump clearance of silts accumulated on Ballygunge Drainage Pumping Station outfall point at Suburban Head Cut Channel at Ward No.65 of Kolkata Municipal Corporation
M.R to protection at Right Bank of Chandipur Khal for a length of 35.00 metre in G.P - Belari, Block - Shyampur-I, P.S - Shyampur, Dist - Howrah