Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.2 LAccepted-Finance 14 9 CHOWBHAGA ROAD CALCUTTA 39 700039 | KOLKATA | WEST BENGAL | 700039 | ₹5.2 L | L1 | Accepted-Finance L1 BIDDER |
| 2 | L2₹5.8 LRejected-Finance | ₹5.8 L | L2 | Rejected-Finance L2 BIDDER |
| 3 | L3₹5.8 LRejected-Finance | ₹5.8 L | L3 | Rejected-Finance L3 BIDDER |
Tender Value
₹5.8 L
EMD Value
₹11,602
Closing Date
13 Feb 2026, 2:00 pmClosed
EE_UDD
Office of the Executive Engineer Urban Drainage Division Jalasampad Bhavan(4th Floor), Bidhannagar, Kolkata- 700 091.
Clearing drainage congestion under the bridge of Kalyani Expressway in Ichapur Khal for a length 45 metre inMohanpur GPBarrackporeII Block PSBasudebpur DistNorth 24 Parganas Under Urban Drainage SubDivision NoI of Urban Drainage Division during the
2026_IWD_1000156_13
WBIW/EE/UDD/e-NIT-15/2025-26
Open Tender
CIVIL WORKS
45 days
ICHAPUR KHAL
REFER TO NIT
5 documents required · 5 mandatory
₹11,602
Yes
9 Mar 2026
6 Feb 2026
17 Feb 2026
6 Feb 2026
13 Feb 2026
6 Feb 2026
Earthwork in excavation in the canals / drainage channels / borrow pits / River bed / slope of bank as noted below as per designed section & throwing the spoils in layers of 25 cm. for making banks as per profile or to deposit the same in any other place within an initial lead of 30 metre and initial lift of 1.5 metre including breaking clods, rough dressing etc. complete as per direction of the Engineer-in-charge. (a) Ordinary soil / local soil / soil mixed with moorum or kankar / silt, dry or moist / slushy silt / sticky soil.
Earthwork in excavation in all kinds of soil for making embankments,repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any othermechanical means on land , including loading, transporting, unloadingand stacking with all lifts bothways and head load where necessary anddepositing the same on embankments, clannels, filling depressions inrequisite profile, levelling as per direction of the Engineer-in-charge NB :- Measurement to be taken on the basis of stack measurement / prepost work section measurement after deduction of void as per norms. No extra payment will be made for stacking. A) Beyond 500 metre and upto 1.00 km
Supplying to site empty cement polythene bags (capacity 50kg) in good condition including stacking, incedental charges etc. all complete (capacity 50 kg).
Labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates(stone / brick) and sewing as done in case of cement bags ,( tying with a knot after filling will not be accepted ) , and stacking within a lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials). NB:- Volume of earth/ sand filled bags should not be less than 0.028 cum/ bag.
Extra rate for item no above for each additional lead of 60 metre or part thereof beyond the initial lead of 30 metre. one extra lead
Dumping in position earth / sand filled gunny / poly bags (capacity 50 kg) within a lead of 30 metre inclusive of all lifts.
Removing earth/sand filled poly bags/gunny bags from the channe bed/slope and initially depositing the same near channel bank at a place as directed by the Engineer-in Charge for measurement of Bag. & then disposing off the same at a distance not less than 150 metre from the channel site.
Bailing out water by pump including all leads and lifts and includingmaking all arrangements for disposal, where continuous flow orseepage of water is encountered and rating of pumps and hours ofoperation is specifically ascertained as per direction of the Engineer-in-charge.
Disposal / carriage of excavated earth / materials outside Government land by truck or by any other conveyance over kancha / pucca road including making access for plying the truck or any other conveyance beyond 300 m and upto a distance of 5.00 km from the excavated point including cost of stacking, loading, unloading, transporting, arrangement of land, if required by agency, spreading and levelling as necessary etc. complete. Measurement : By stacks at loading point after deducting voids as per rule. (This item can only be used after obtaining permission from the concerned Superintending Engineer).
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.56 MB
BARCHART.pdf
Tender Documents • 0.19 MB
2911.pdf
Tender Documents • 0.40 MB
BOQ_2450217.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid