Loading…
Loading…
391 results • Recent activity
Restoration of slipes, erosions along the countryside of river Rupnarayan left bank over right side of existing drainage channel parallel to the Rupnarayan left at Shibpur near Shibpur wooden bridge for a length of 30.00m in G.P-Baneswarpur-II,
Re-Construction of wooden Bridge(Length-18.70 metre) over Nabibbabu Khal in G.P-Chandipur, P.S-Amta, Block-Amta-I, District-Howrah under LDC Sub-Division No-II
Re-Construction of wooden bridge Somruk in place of damage wooden bridge over Kashmul Khal G.P-Hutgacha-II, P.S-Uluberia, Block-Uluberia-I, District-Howrah.
Reconstruction of damage wooden bridge(length-22.00Mtr.) over Jhamtia Khal at Dharapara in G.P-Kasmoli, P.S-Amta, Block-Amta-II, District-Howrah.
Improvement of Branch Channel-II of Howrah Drainage Channel by construction U trough RCC section for a length of 800 from (Ch. 1600 to Ch. 800 m ) and restoration of damaged lined section between Ch. 800.00 m to 0.00, in Block Bally- Jagacha , P.S
Improvement of Pocha Khal by construction of U trough RCC section for a length of 990.00 M from Belgachia Oxidation Pond to Biradingi More in ward no. 8 of Howrah Municipal Corporation, P.S.-Liluah, Dist- Howrah