Loading
Loading…
Loading…
351 results • Recent activity
EXTENSION OF EXISTING CONTROL ROOM BUILDING FOR UP GRADATION OF EXISTING 30V DC CONTROL SYSTEM INTO 110V DC SYSTEM AT VELAMPALAYAM 33/11 KV SUBSTATION
Engaging of additional Manpower as per the Instructions of DD vide letter No CE PLG RC EA F Man power 2025 Dated 17.11.2025 Memo. No. DD EA F.Man power Summer 2026,DT.28.01.2026 for quick restoration of power supply during Summer 2026
SPECIFICATION FOR PROCUREMENT OF Fixed Moving Contact center switch
SPECIFICATION FOR PROCUREMENT OF COTTON BELT ROPE ,5 8
SPECIFICATION FOR PROCUREMENT OF Breather of size 100 kva and 250 kva
SPECIFICATION FOR PROCUREMENT OF SILLICAGEL