Loading…
Loading…
36 results • Latest
Improvement to Kainfulianalla M.I.P. At Baragaon in Aska Block under Imp to Tank Scheme for the year 2025-26
Clearing water hyacinth (thickly grown) from canal, drainage channels and reservoir bed on premeasurement including removal of debries and depositing the same clear of work site with all leads , lifts and delifts etc. with supply of all labour and T & P required for the work etc. complete in all respect as directed by the Engineer-in-charge.
Construction of Janibili Check Dam over Saranalla in Bellaguntha Block under MATY scheme for the year 2025-26
Clearing shrub jungles and uprooting stumps and small bushes and trees of below 1 meter girth on pre-measurement including removal of debris and depositing the same clear of work site with all leads, lifts and de-lifts etc., with supply of all labour and T&P required for the work etc., complete in all respect as directed by the Engineer-in-charge.
Improvement to Kot Check Dam in Balangir Block of Balangir District under the scheme Imrovement To CD for the year 2025-26
Clearing shrub jungles uprooting stumps and small bushes and trees below 1M girth on premeasurement.
Construction of Salepali Check Dam in Khaprakhol Block of Balangir District Under The scheme MATY 3.0 for the year 2025-26
Excavation, loading , unloading and carriage by mechanical means of all kind of soil including moorum. stoney earth, gravel etc. interspread with boulders up to 1/2 cum in size with all lifts and delifts including trimming of slopes and bed to design section and depositing the excavated materials away from work site as per the specification and as directed by EIC within an initial lead of 1 km. from the place of excavation complete.
Construction of Ratanbishar Check Dam in Khaprakhol Block of Balangir District Under The scheme MATY 3.0 for the year 2025-26
Excavation, loading , unloading and carriage by mechanical means of all kind of soil including moorum. stoney earth, gravel etc. interspread with boulders up to 1/2 cum in size with all lifts and delifts including trimming of slopes and bed to design section and depositing the excavated materials away from work site as per the specification and as directed by EIC within an initial lead of 1 km. from the place of excavation complete.
Improvement to Bidighat-I Check Dam in Balangir Block of Balangir District under the scheme Imrovement To CD for the year 2025-26
Excavation, loading, unloading and carriage by mechanical means of all kinds of soil, including stoney earth, gravel and moorum etc interspread with boulders upto 1/2 cum size with all lifts and delifts including trimming of slopes and bed to design section and depositing the the excavated materials away from work site as per the specification and as directed by the Engineerin- charge within an initial lead of 1km from the place of excavation complete.