Loading…
Loading…
512 results • Recent activity
Urgent flood protection and mitigation work by repairing slip of R Embankment of River Cossye TE1H1 at ch.24.5Km for length of 90M occurred due to rainfall and discharge during the period from 15.07.25 to 18.07.25 at Mouza.Shaldhori in Block Debra
Urgent flood protection and mitigation work by protection of river bank at Rbank of River New Cossye TE1H1from Ch.37.47 Km to ch.37.8 for length of 330M occurred due to rainfall anddischarge from 14.07.25 to 18.07.25 at Mouza Talberia Gunguni Patna
Urgent flood protection and mitigation work by protection of river bank at R bank of River Old CossyeTE2H2 at Ch 5Km for length of 50 M occurred due to rainfall and high discharge from 14.07.25 to 18.07.25 at Mouza Singarghar, Block , P.S Debra,
Urgent flood protection and mitigation work by protection of river bank at Rbank of River Old Cossye TE2H2 at Ch.2.30 Km for length of 100M occurred due to rainfall, high discharge from 14.07.25 to 18.07.25 at Mouza Boikunthapur, Block ,P.S Debra
Urgent flood protection and mitigation work by repairing slip in between Biharichak Sluice to 10Vent Sluice on L Embankment of Bhosra Khal for 200M due to rainfall and high discharge from15.07.25 to 18.07.25 at Mouza-Chak Prayag in Block-Debra
Geotechnical investigation for the work Construction of RCC Bridges of at Mouza Kanpur and Jarnunaber, over River Kubai Buriganga in G.P11 No. Kalagram, Block Keshpur, PS Keshpur. Paschim Medinipur in connection with Ghatal Master Plan.