Loading…
Loading…
512 results • Recent activity
IPM work of Moorum inspection path from Ch. 15.30Km. Bunglow More to ch.16.00km.Satyapur total length 700 M right bank of 3 Main canal offtaking from MMC in Block and P.S. Debra, District Paschim Medinipur
IPM work of Moorum inspection path from Ch. 9.30Km. Khanamohan to Ch.11.30Km Dogeria (total length 2000 M left bank of 3 Main canal off taking from MMC in Block and P.S. Debra, District Paschim Medinipur
IPM work of Moorum inspection path from Ch.6.50 km.Koigeria to Ch.9.00Km.(Khanamohan) total length 2500 M left bank of 3 Main canal offtaking from MMC in Block and P.S. Debra, District Paschim Medinipur
IPM work to moorum inspection path in between Ch. 26.5 Km Gowalageria to 29.5 Km Palashi of M.M.C.Total length of 3000.00 M in Block and P.S.Debra, Dist.Paschim Medinipur
IPM work to Moorum Inspection Path from Ch.0 km to ch. 1.75 km. Total Length 1750 m. of Left Bank of Dy.1C of 1 Main Canal of MMC in Block KharagpurII, P.S. Kharagpur L Dist. Paschim Medinipur.
Irrigation Periodical Maintenance work for Bhairabpur SubBranch of Dy1S including construction of concrete road from ch.0.90 km to ch.1.36 km Total length 460 M at R B of Bhairabpur Sub Branch of Dy1S of MMC in Block KharagpurII P.S Kharagpur