Loading…
Loading…
512 results • Recent activity
Urgent flood protection mitigation work to reduce vulnerability of people by closing breach10 M along with repairing of damaged Emkt on R ExZamindary Embk of Kethiya river near House of Banamali Ari occurred due to heavy rainfall subsequent high
Geotechnical investigation including soil testing for 4 nos Canals for Khalkona Khal, Kamalpur Khal, Ballar Khal and Local drainage channel Jamurai to Sandapur in Block Kharagpur I, Dist. Paschim Medinipur.
Geotechnical investigation including soil testing at river bed of river Rupnarayan from Bandar Confluence point of River Shilabati and Darakaswar to Sribara outfall of Dubrachati river at right bank for a length of 28.00 km in Block Ghatal Daspur
MR to Boundary Wall of Ranichak Pump House Compound at Block DaspurII, Dist. Paschim Medinipur under Ghatal Irrigation Sub Division within West Midnapore Division, I and W Dte.
Dumping and placing in position properly filled up Nylon crates to avoid furtherErosion at MC Embankment over left bank of River Durbachati near Dongabhanga Mal backing for a length of 145.00 m at Mouza Dongabhanga Block Daspur II
Dumping and placing in position properly filled up Nylon crates to avoid further Erosion at MC Embankment over left bank of River Durbachati near Samanta Para Ghanta Para for a length of 130 m at Mouza Narayanchak Block Daspur II Paschim Medinipur