Loading…
Loading…
512 results • Recent activity
Dumping and placing in position properly filled up Nylon crates to avoid further Erosion at MC Embankment over left bank of River Durbachati near Samanta Para Ghanta Para for a length of 130 m at Mouza Narayanchak Block Daspur II Paschim Medinipur
Dumping and placing in position properly filled up Nylon crates to avoid further Erosion at MC Embankment over L bank of River Durbachati near Nona Narayanchak EP fora length of 80m at Mouza Nona Narayanchak Block DaspurII PS Daspur Paschim Medinipur
Dumping and placing in position properly filled up Nylon crates to avoid further Erosion at MC Embankment over left bank of River Durbachati in between Ch.14.20km to 14.50 km length of work300 m at Mouza Brindabanchak BlockDaspurII Paschim Medinipur
Protection of Country Side of TE3H2 Embankment Over Left Bank of River New Cossye at Ch.at 21.560 Km, Mouza Birsigpur, GP 2 No Bharatpur in Block and PS Debra and Dist. Paschim Medinipur.
Restoration of damaged severe erosion of embankment river Kubai Total Length of restoration 2 Nos 75.00 Meter at Mouzas Garsenapotya and Kulbahara, in Block and P. S. Keshpur , Dist. Paschim Medinipur.
Restoration of damaged severe erosion of embankment river Tamal, Total Length of restoration 3 Nos 135 Meter at Mouzas Gobindapur, sarai and Mugbasan in Block and P. S. Keshpur , Dist. Paschim Medinipur.