Loading…
Loading…
1,349 results • Recent activity
TTPS ES Circle EM III Routine cleaning of fly ash and coal dust in the HT fan motors Mill motors cable trays in Unit IV V for a period of twelve months from 01 04 2026 to 31 03 2027
TTPS Operation Circle CAD ACWPH I Inspection, checking of supply and return pipe lines of bearing cooling water, arresting leakages and assisting the shift engineer in all activities at Auxiliary Cooling Water Pump House-I by recording the parameters
TTPS Operation Circle MPM I Unit III Attending to certain preventive and breakdown maintenance works in coal mills, RC feeders Hot, cold and seal air system of mills for a period from 01.04.2026 to 31.03.2027
TTPS ES Circle EM III Operation and routine cleaning of lift car landing gates and doing rescue operation of Freight cum Passenger lift in Unit IV V Boiler area for the period from 01 04 2026 to 31 03 2027
TTPS Operation Circle CAD Auxiliary Cooling Water system unit IV and V Upkeepment and attending minor repair works for the period from 01.04.2026 to 31.03.2027
TTPS ES Circle MRT I Part of Cleaning works of junction Boxes and Push Button boxes related to Turbine side valves in plant area of Unit I II III for the period from 01 04 2026 to 31 032027