Loading…
Loading…
1,333 results • Recent activity
TTPS Mech II BM Unit I Boiler Attending patch up works in the air ingress area of the pent house and repairing the crown plates seal plates around the intersection of various headers in pent house during 2025 2026 overhaul
TTPS Mech II BM Unit I Dismantling the existing seal plates and re erection after rectification works in BAH and overhauling of boiler fill pumps hot well makeup pumps during 2025 2026 overhaul
TTPS Mech II BM Unit I Painting of the safety valve exhaust pipes its silencers and CST tank during the overhaul 2025 2026
TTPS Mech II BM Unit I Overhaul of long retractable soot blower LRSB and water wall soot blower during the year 2025 2026
Remedial measures by Strengthening and Protective Coating to the RCC PSC Structures of Coal Jetty 1 Conveyor System - 14 from JT 1E towards West Long Span 11 - 12, Short Span 13 - 14 of TTPS in Red Gate area North Break Water of VOC Port at ECHS
Construction of Common Toilets to the South of Ash Silo of 1 2 and 3 area at TTPS