Loading…
Loading…
1,333 results • Recent activity
TTPS Mech II AHP Painting of Unit I Bottom ash hopper body plate and its connected structural supports from 0 mtr to 6 mtr EL during forthcoming overhaul
TTPS Mech II AHP Unit I Attending overhauling works in Unit I ECO APH hoppers Ash disposal system flushing apparatus Rubber expansion bellow and allied sea water pipe lines fittings valves and rectification work in ECO APH hopper platforms dur
TTPS Mech II AHP Replacing the Clinker grinder Feed gate assembly Power cylinders and its connected pipe lines Feed sump Hydraulic ejector assembly etc in unit I Bottom ash hopper ash disposal system during forthcoming overhaul
TTPS Mech II BM Unit I Renewal of damaged heavy oil line atomizing steam line in AB CD EF elevations of Unit I Boiler during the annual overhaul 2025 2026
TTPS Mech II BM Unit I Inspection Rectification of emitting electrode suspension frame in ESP during annual overhaul for the year 2025 2026
TTPS Mech II BM Unit I Removal of ash accumulated over the mechanical dust collector path A B C D and ID fan A B suction side ducts and welding the eroded weld joints in the mechanical dust collector path A B C D and suction side duct of ID fan A B