Loading…
Loading…
1,333 results • Recent activity
TTPS MechII AHP Plastering of refractory cement inside Unit II BAH and removal of ash slag and debris from BAH floor and trenches during the forthcoming annual overhaul
TTPS MechII AHP Painting of Unit II Bottom ash hopper body plate and its connected structural supports from 0 mtr to 6 mtr EL during the forthcoming annual overhaul
TTPS Mech II AHP Renewal of wornout South side vertical column box BAH structural supports, walkway platform with staircase around BAH seal trough and makeup valve in Unit II BAH during the forthcoming annual overhaul
TTPS Mech II AHP Renewal of worn out portions of Bottom ash hopper body plate connected structural supports and BAH supporting vertical columns in North East and West side dismantling and erection of BAH overflow trough and its outlet pipe lines in
TTPS Mech II AHP Replacement of Regular make up jetting assembly connected pipe Lines flushing header assembly overhauling of valves cleaning and welding of seal trough in unit II BAH during the forthcoming annual overhaul
Remedial measures by Strengthening and Providing Protective Coating in the RCC PSC Structures in Conveyor - 15 Long Span 35 - 39 and Short Span 40 - 41 in Red Gate area North Break Water of VOC Port at ECHS areas