Loading…
Loading…
1,326 results • Recent activity
TTPS ES Circle Instn I Overhauling of 9 Nos sample coolers painting and replacement of 6 Nos 1/2 defective high pressure valves in sample lines of Unit I during the period of Capital overhaul for the year of 2025 26
TTPS ES Circle Inst I Unit I Capital Overhauling Releasing Transporting Overhauling Painting Re fixing and conducting functional test 4 nos Burner tilt Power cylinder Releasing Overhauling calibrating refixing and conducting load test on 44 Nos SADC
Repair and Maintenance Works to the Unit 3 Cable Gallery of 0.00mtr, 4.50mtr and 9.50mtr of Power House Building
Rectification Works to the Deck Slab, Column, Beams in the Stopper Gate area in Cooling Water Skimmer Bay Intake Channel 1 of Yellow Gate - North Break Water area
Rectification Works to the Damaged Ash Slurry Line Pedestals of Units 1 to 3 from JT 3 West side to AEE AHP Building South side in Unit 4 and 5 area
Rectification Works to the Damaged Ash Slurry Line Pedestals of Units 1 to 3 from ASPH West side to JT 3 West side in Unit 4 and area