Loading…
Loading…
1,394 results • Recent activity
ICHP- Dismantling of existing SH 150mm NB pipe from Conveyor-67 at Coal Jetty area and fixing service water line of Conveyor-57 to Conveyor-63 area after removing the damaged pipe line
Strengthening and Raising the North side Inner Bund using Ash mixed with Mill Reject and Red Gravel for a length of 150m from CH 450m to CH 600m from hump towards spillway.
ECHP-I- Strengthening of damaged base concrete of cable tray support structure and also providing additional support from Transfer pile structure to the cable tray from 95 mtr. To 195 mtr. at Conveyor-16
Strengthening and Raising the North side Inner Bund using Ash mixed with Mill Reject and Red Gravel for a length of 150m from CH 300m to CH 450m from hump towards spillway
Supply of 3 Phase 415V 110KW Draw out Type LT Module
Strengthening and Raising the West side Inner Bund using Ash mixed with Mill Reject and Red Gravel for a length of 150m from CH 150m to CH 300m from hump towards spillway