Loading…
Loading…
1,394 results • Recent activity
ECHP-II Complete overhauling of 8 Ton, 5 Ton and 2 Ton capacity electrical hoist with trolley including dismantling and re-erection at TT-7 Top floor, Conveyor 61 tail end, Conveyor 61 head end, drive house floor of Conveyor-61, Conveyor-73 head
Strengthening and Raising the West side Inner Bund using Ash mixed with Mill Reject and Red Gravel for a length of 150m from CH 0m to CH 150m from hump towards spillway
ECHP-II- Fixing of 50 Nos. 42W LED based well glass light fitting in the stair case in Transfer Towers TT-7, TT-2, Junction Towers JT-20, JT-20A Drive House of Conveyor-61 including wiring with M.S conduit pipe
Erection of SS grade 304 seal plates for 26A Conveyor Frame No.101 to 108, 75 to 94, 59 to 69, 35 to 48 and 27 to 33
SUPPLY,ERECTION,TESTING AND COMMISSIONING OF 10 TON CAPACITY, ELECTRICAL WIRE ROPE HOIST AT JUNCTION TOWER 4 CONVEYOR 16 HEAD END
ICHP- Reconditioning of carrier roller assembly released from variousD80-A12 Dozer No.11, 12.