Loading…
Loading…
1,394 results • Recent activity
TTPS Mech II BM Unit I Strengthening of weak welding joints of step grills platform grills renewal of damaged corroded structurals from 0 Mtr to 52 Mtr elevation and re routing of ash disposal pipe line of Unit I Boiler
TTPS Mech II BM Unit I Replacement of wornout corroded structural supports painting of structurals removal of existing wornout Asbestos sheets and providing new Galvalume sheets in all four sides in Unit I Boiler at 56mtr elevation
SUPPLY ERECTION AND COMMISSIONING OF DEWATERING PUMP STORM WATER PUMP SET INCLUSIVE OF COLUMN PIPE AND DELIVERY PIPE UP TO SOLE PLATE ALONG WITH ELECTRICAL ACCESSORIES CAPACITY 500 M3 or HR FOR FUEL OIL PUMP HOUSE SYSTEM
TTPS Mech II TM I UnitII Inspection overhauling and commissioning of condenser butterfly valves and steam line valves actuators during the forthcoming annual overhaul
TTPS Mech II TM I Unit II Removal and Re fixing of wool mattress or Cera blanket insulation of Turbine Casing and their allied pipe lines valves during the forthcoming annual overhaul
TTPS Mech II TM I Unit II Overhauling of steam and condensate valves of Turbine Regeneration system during the forthcoming annual overhaul