Loading…
Loading…
1,394 results • Recent activity
Cleaning the Roof Tops of various buildings such as Power House, Ash Handling, Boiler, Bunker ESP 4 and 5 Control Room CWPH 2 of Unit 4 and 5 at EL 3.00m to 52.80 m and clearing away the deposits to far off places for the period from 01.04.202
TTPS ES Circle EM I Retubing of more plugged Stator water secondary cooler 3A Dismantling the cooler removing all the old tubes cleaning the baffles and tube plates providing new tubes expanding both ends of the tubes with tube plates inserting the
Periodical Maintenance by engaging machineries to remove the ash deposits in the 457.5 E road in Unit 4 and 5 area for the period from 01.04.2026 to 31.03.2027
Regular Maintenance of the lawns, hedge plants, korean grass in the existing lawn to the South of Repair Bay area of Unit 5 for the period from 01.04.2026 to 31.03.2027
Clearing the drain free of coal dust, silt,slush, debris etc. in and around Primary Crusher House 1 and 2, Transfer Towers 2 and 7 and Junction Tower 20 for the period from 01.04.2026 to 31.03.2027
TTPS ES Circle EM I Unit II Charges for complete overhauling of Hydrogen gas coolers and changing all gaskets cleaning the cooler tubes conducting hydraulic test and ensure hydrogen gas cooler performance in Unit II