Loading…
Loading…
1,394 results • Recent activity
ECHP-I- Attending breakdown,preventive mechanical maintenance works such as renewal of mesh clothes, replacement of worn out and broken ring hammers etc., at Secondary Crusher House-I
SUPPLY ERECTION AND COMMISSIONING OF 100 NB SEA WATER SEALING PIPE and FITTINGS FOR COOLING WATER PUMPS AND 200 NB SEAMLESS PIPE FOR SEAL WATER PIPE LINE FROM AHP TO COOLING WATER PUMP OF UNIT I, II and III FOR PIPE NO 61,62,63 and 64
ECHP-I- Checking and monitoring of mechanical equipments in Secondary Crusher House-I
SUPPLY, ERECTION, AND COMMISSIONING OF 200 NB M.S. SEAMLESS PIPES AND BENDS FOR UNIT I HEAVY OIL DISCHARGE LINE FOR A LENGTH OF 500 MTR REACH I, FUEL OIL PUMP HOUSE TO NEAR ESP III
ECHP-I- Attending breakdown work, maintenance of pull chord switches , magnetic separators and lighting works in all Conveyors at Primary Crusher House-I and Secondary Crusher House-I.
SUPPLY, ERECTION, AND COMMISSIONING OF 200 NB M.S. SEAMLESS PIPES AND BENDS FOR UNIT II HEAVY OIL DISCHARGE LINE FOR A LENGTH OF 500 MTR REACH I, FUEL OIL PUMP HOUSE TO NEAR ESP III