Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
21 live19 closing this weekmost from CE Water Resources Department Gosikurda Project Nagpur
21 results • Latest
Construction of Appraoch Road crossing to Canal at RD 3400 m, 23890 m, 38130 m, 40790 m and 42070 m of Ghodazari Branch Canal.
Construction of Additional Structures ,Widening of Service Road ,Earthwork and Murum filling at selected places and Lining work at RD 0 To 4120 m on Right Distributary of Lal Nala LIS.
Detailed Construction Planning and Designing for Pipe Distribution Network System, Alignment Survey for Main lateral Sub main, Chak Planning, Structures, Taking Trial Bores Trial Pits and Preparation of Estimates of Remaining command Area of Ajans
Construction of Balance Work of Sonegaon Minor of Loharisawanga Distributory, Kar River Project Karanja (Gh
Repair of Slab Culvert at RD 2640 on RBC of Sukali Tank Project
Construction of Selective Lining on Right Bank and Left Bank Main Canal of Sukali Tank Project
Installation of solar power system in departmental office premises, including ground levelling and other allied civil works
Construction Of Repair Work at Slab Culvert Rd - 11445 Mtr On the RBC Under Sukali M.I.Tank.
Construction of inlet at R.D. 600 of Main canal,HR on Khapri minor-2, VRB on Sawardoh minor and Repair of Structures and Miscellaneous works on Jatlapur Distriburory
Appointment of Architect cum Project Management Consultant for Construction of Administrative Building for Water Resources Department at WID Premises , Wardha
Construction of Additional Structures on Left Minor offtaking at RD 420 m on Right Distributary of Lal Nala LIS.
Repair of HR at Lohari Sawga distributary and Construction Of Protection wall at Box Culvert 13050 m Under Kar River Project.
Epoxy Grouting of Aqueduct and Construction Trough at Tonglapur distributory offtaking at 16.66 KM Main canal of Kar River Project Karanja
Construction of the Compound Wall Outside the Pumphouse of Lower Chulband Project, Ta. Sakoli, Dist. Bhandara.
Construction of Cement Concrete Approach Road and Internal Road of Pump House under Lower Chulband Project, Ta. Sakoli, Dist. Bhandara.
Construction of Nerla Lift Irrigation Scheme Stage 2 offtaking RD 5080 M on Nerla Main Canal of Nerla Lift Irrigation Scheme including Survey, Planning, Design of entire Scheme with construction of pump house and Rising main, pumping machinery, mecha
Construction of Balance Lining Earthwork Retaining Wall Ramp and HR cum Inlet Works of Vyahad Branch Canal of Asolamendha Main Canal Selected Lining Earthwork and Construction Works of Usegaon Distributary Rajgad Distributary and Chandapur Minor No.
Improvement and Strengthening of the Service Road of Gosikhurd Right Bank Main Canal from RD 46.00 Km to 99.50 Km at Selected Patches, including Approaches to Canal Crossing Bridges and Allied Works,in Taluka Brahmapuri and Saoli, District Chandrapur
Engineering, Procurement and Construction (EPC) work of Lift Irrigation scheme with pipe Distribution Network of Ghodazari sub branch No. 3 offtaking from Km. 55 of Ghodazari Branch Canal under Gosikhurd Project.
Construction of civic amenities of Open Drain and B.T. Road Under quality rehabilitation for affected Village Tekepar at Rehabilited village Zabada Taluka Dist Bhandara under Gosikhurd Project
Construction of civic amenities of Open Drain and B.T. Road Under quality rehabilitation for affected Village Jamgaon wadad at Rehabilited village Borgaon khurd Ta Dist Bhandara under Gosikhurd Project