Loading…
Loading…
666 results • Latest
Supply of Light mazdoor, JCB, Un-skilled Mazdoor for Irrigation Management and Concerned Work. Including Law and Order Under Juridition of Section under Sub Division Mangalwedha, Tal-Mangalwedha for Rabi and Hot Weather 2025-26.
Repairs and Renovation Of Building of Sub Division No.6 Mahuli of Tembhu LIS Project Tal Khanapur Dist Sangli
Repairs and Lining to Yeralwadi Right Canal at Ch. 0/220 Km to Ch. 0/570 Km and Repairs and Lining to Yeralwadi Left Canal at Ch. 0/412 Km to Ch. 0/835 Km
Construction of guide wall near Urmodi River escape.
A) Construction of security room on right flank, Inspection tower on both flank of Urmodi dam B) Providing and fixing FRP gauge plate at Urmodi dam
Balance work Repairs Leakage prevention work of Temghar dam, Monolith no 18 to 27
Balance work Repairs Leakage prevention work of Temghar dam, Monolith no 1 to 13
Repairs of waste weir bank and cutting of trees shrubs and other acillary work at kadus M I Tank
Repair work of SWF in K m 1 Construction of DHPC at Ch 58 950 Construction of Escape at Ch 58 900 Leakage Repair work in Km 1 to km 32 and K m 64 to 84 of Sangola Branch Canal No 5
Providing Epoxy Mortar Treatment from Upstream side to Piers in the second Bay of Ujjani Dam for Stopping Water Leakage through Construction Joints.
Irrigation Management of Sina Madha LIS for the Rabbi and Hot Weather season 2025-26 rotation through Outsourcing.
Irrigation Management of Sina Madha LIS for the Kharip, Rabbi and Hot Weather season 2025-26 rotation of PDN Dy no.1 2 2 through Outsourcing.
Providing and Engaging manpower for Security at Various Check Posts and at Gallery of Ujjani Dam for Regular works in Rabbi and
Providing and Engaging Manpower for Maintenance, Surveillance, Upkeep of R.H.S. and L.H.S. Portion of Ujjani Dam in Kharip, Rabbi and Hot Weather Season.
Providing and Engaging manpower for Security at Jalpari Garden and Main Entrance to Ujjani Dam Kharip, Rabbi and Hot Weather Season.
Design, development, implementation, hosting, operations and maintenance of Shetkari-Mitra Web and Mobile Application for WRD Maharashtra
Providing Labour for maintenance and repairs to warana and dudhganga colony office premises (Period 18/02/2026 to 18/02/2027)
Estimate of Providing Chain link Fencing at kur colony under Office of Dudhganga Right Bank Canal Sub Division No 3 Nidhori Taluka Kagal Dist Kolhapur
Repairs to Main Irrigation Outlet gate of Mhakoshi M.I tank to stop the leakage as well as fixing Gauge plate, information board and other ancillary work .Ta-Bhor District-Pune.
Repairing roads in the Koyna Dam Premices
Carrying out repair works to the PB Class 2 2 residential quarters in the koyna Project Colony
Arrangement of a separate room for the BSNL Telephone Exchange in the Koyna Project Colony
Replacement of sheets of VIP suites in the Koyna Rest House campus painting work and other allied works
CONSTRUCTION OF MECHANISED C C LINING OF LINK CANAL OFFTAKING FROM DC2 DARGANHALLI CANAL CH 0000 TO 0260 80 M AND CONSTRUCTION OF SECURITY WALLS TO DC 1 AND DC 2 OF DARGANHALLI CANAL OF EKRUKH LIFT IRRIGATION SCHEME
PROVIDING LABOURS FOR WATER SUPPLY AND CLEANING AT UJJANI COLONY FINAL PLOT NO. 31, 41 AND 41E FOR YEAR 2025-2026
INCREASING THE HEIGHT OF PROTECTION WALL AT CIRCLE OFFICE PREMISES
MAINTENANCE WORK IN PREMISES OF SUBDIVISION OFFICE 15, 57, 37 AND QUALITY CONTROL OFFICE AT SOLAPUR
CONSTRUCTION OF GUNITING WORK FOR LAID UNCOVERED RISING MAIN OF SHIRAPUR LIS STAGE 1 1.75 KM 2 ROWS 1500 MM DIA TAL MOHOL DIST SOLAPUR
LINING TO THE MINOR NO. 2 (500 M) AND MINOR NO. 6 (2.5KM) OF LINK CANAL OF SHIRAPUR LIFT IRRIGATION SCHEME
Maintenance and Repair of Krishna Water Dispute Tribunal Office / Rest House at Delhi.
Conversion of direct outlets to valve Chamber on Nira Deoghar Right Bank Canal
Construction of SWF at km 47/420 m. in Km 48 of Nira Deoghar right bank canal Tal.Khandala, Dist.Satara
Construction of Approach Road and CD Work to Kavathe Rehabilitated Village of Nira Deoghar Project
Repairand Painting work of JalSampatti Bhavan Building
Urgent Repairs Works of K.T.Weir Shingoli, Tal. Mohol Due to Flood in Sina River Sept. 2025
Servicing, Repairing and Anti Corrosive Painting to Automatic and Rolling Gates of Bhatghar Dam (Year 2026-27)
Construction of New Toilet Block at Vadgaon,Pandare and Malad Section
Repairs to Bhoyachi Malai K.T Weir on Ambawade stream and other ancillary works on it. Ta-Bhor Dist.-Pune. for the year 2025-26.
Providing and Supplying Skilled labour on contract basis for irrigation management in Kharip, Rabbi and Hot Weather rotation of Irrigation Sina River under Bhima Development Sub Div No.10 Kurduwadi for year 2025-26
Supplying L.M.V. Vehicle and driver to Irrigation Sub Division Barshi, supplying L.M.V. vehicle to Kukadi Left Canal Sub Division No 12 and to Irrigation Sub Division Karmala
Annual Repair and Maintenance of offices and office premices under Solapur Irrigation Division for Period of One Year.
M and R TO LEFT CANAL SERVICE ROAD OF MEDIUM PROJECT EKRUKH, TAL. NORTH SOLAPUR.
REPAIRS AND MAINTENANCE OF GUIDE WALL AND APRON AT K.T WEIR DEGAON
.Construction of Grampanchayat Building at Valvan,Tal. Mahableshwar, Dist. Satara.
Surveying Canals of Ner Medium Project And Preparation of Design, Estimate for Existing Canal System.
Surveying, Design And Prepration of Estimates For Conversion of Canal System into PDN of Mayani and Kankatrewadi MI Tank.
Repaires of Earthwork in deep cut 21/600 to Km.24/100 and Km 24/400 to 25/900 km in Bhima -Sina Link Canal Tal. Madha Dist- Solapur.
Repair of the K.T.Weir Kavhe Tal Madha, damaged due to flood including Construction of Wing wall U S side, repairs to pier, channel, wearing coat and railing along with ancillary works and supply of k.t.weir needles.
Repair of K.T Weir Kolegaon Tal Mohol repairs of channels and other Ancillary works K T Weir Shirapur Tal Mohol Repairs of Channels, Railing and Repair Works
Constructing Stair case from embankment to outlet gate at Mangi Dam, fixing gauge plate and embankment on dam top and removing silt and providing embankment on RBC LBC Canal Mangi M.P. Tal,Karmala.