Loading…
Loading…
666 results • Latest
Repairs to Kamewadi K T Weir under Jangamhatti Medium Project
Removal of shrubs and grass cleaning of drain Maintenance and repair of U S and D S pitching dam top road waste weir of Terani M I Tank Tal Gadhinglaj
Repairs to Jarali K. T. Weir Under Chitri Medium Project
Repair of of Top of road of KTW Hajgoli and Construction of flood protection wall At Right bank and Left bank Of Upstream Side Under Chitri Medium Project Tal Ajara, Dist Kolhapur
Painting of Koyna Rest House and Other ancillary works
Repair of the Police Wireless Massage Office at KDVS Deshmukhwadi Koynanagar along with allied works
Repair of class two rest house in Koyna Project Colony and implementing leakage prevention measures for B and C type residences in Koyna Project Colony and constructing a shed near the community center in Koyna Project Colony
Repairing of Tambadwadi Panchdhara Tunnel 2 Km Road
Colouring to Kolkewadi Dam
Construction of Guard Wall on Tambadwadi Panchdhara Tunnel Road
Repairing of Footpath, Hanging bridge of Kolkewadi Dam Foot Garden
Construction of flood protection wall on Left bank of Koyna River from Old Bridge to New Bridge at Warunji Tal Karad Dist Satara
CONSTRUCTION OF CROSS REGULATOR AT HEAD OF THE PONDHAWADI BRANCH CANAL IN KM 223 AND INLET at CH 22 obliq 720 223 obliq 400 OF KLBC and CH 9 obliq 300 10 obliq 260 10 obliq 440 11 obliq 430 OF PBC
Repair work of C.C. Lining of Km. 17 at Ch. 16/050 to 16/085 and Km. 16 at Ch. 15/995 to 16/030 of Mohol Karamba Branch Canal including gate repairs on Mohol Branch Canal
Const. of Part-1 works through PDN of Chorade Dy2,Shenwadi, Mhasurne Dy, Nimsod Dy 1,2 Holichagaon Minor 17, Umbarde Dy, Umbarde Minor2,3, Naykachiwadi Minor, Vaduj Minor1,2,3,5,6,7 Ganeshwadi Minor1,2, Katarkhatav Dy, Dalmodi Minor1,2,Katar.K.Minor2
Construction of Flood Protection Work at Phejiwade Near Muslim Dafanabhumi on Bhogawati River Tal. Radhanagari Dist. Kolhapur
Construction of Control Room of Size 11 X 5 M. near Switchyard of Wakurde Lift Irrigation Scheme Part - 2, Stage - 1 Pump House. Tal- Shirala, Dist- Sangli
A Repairing the pipe line of police Chauki B Construction of 28 No Police Chauki C Repairing Fencing D Painting of high level bridge in koyna dam premices
A Installing a Mural Arts of Chatrapati Shivaji Maharaj in Neharu Park B Creating Tourist Attraction and Relative works in Nehru Park D Developing the Area around the memorial erected to pay tribute to those who died in 1967 earthquake
Installation of light post on the road footpath repair and fencing under the beautification of Koyna Dam Area
A Repair works of the Kolhapur Type K T weir across the Wang River at Maldan Taluka Patan District Satara for the year 2025 2026 B Construction of a guide wall on the right bank of the Kolhapur Type KT weir across the Wang River at Saikade
Construction of flood protection wall at Dalit vasti on bank of Wang River at Saikade Tal Patan Dist Satara
Krishna Koyna Lift Irrigation Scheme Mhaisal Jath Part Conducting Preliminary Survey, Investigation, Design and Preparing Estimate for Proposed Chudekhindi LIS Scheme
Krishna Koyna Lift Irrigation Scheme Mhaisal Jath Part Preliminary Survey Investigation Design and Preparing Estimates for Construction of Pipe Distribution Network For Additional Area of Vilages Diksal, Aavandhi, Antaral inganhalli, And S
Repair, Cleaning and painting to Sina Madha rising main butterfly valves and guard railing to forebay and battery room of sina madha LIS.
Providing and Erecting Crash Barrie on both Side of Main Approach Road of Ujjani Dam
Removal of collapsed geru and silt from Direct Minor No. 4 along the main canal of sina madha lift irrigation schme (chainage 0/00 to 5/120 as well as repair of the bead regulator service path and construction of a platform at minor no. 8 of the mod
Construction of compound wall Around the Pump House of Sina Madha LIS.
Providing and Engaging Manpower for Maintenance, Surveillance, Upkeep of Masonry portion of Ujjani Dam in Kharip, Rabbi and Hot Weather Season.
Replacing Water supply line and Improving Waste Water Management in the Sinchan Bhavan area as well as within Krushnanagar Colony
Lining Work to prevent Leakages through Canal in km 22 to 30 of KBC of KLBC
Lining work to prevent leakages through embankment in km 7 and 8 of DY 15 of KLBC
Lining work to prevent leakages thorugh embankment in Minor No 71 and Ruighavan Minor of KLBC
REPAIRS TO THERAWADI M I TANK
Construction of C C Lining For Koregaon Dhanore Branch Canal And Other Ancillary Works
Construction of Distribution system through Pipe distribution Net Work ( P.D.N.) for Dhom Balkawadi Right Bank canal km 128 to 147 Tal. Phaltan and Dist. Satara.
Construction of flood protection wall at Yerne Kh Tal Mahabaleshwar Dist Satara on Solashi River
Maintenance and Repairs to K.T. Weir Puluj Tal. Pandharpur For The Year 2025 -26 . Fixing and Removing M S Needles and Ancillary work
Operation work to watch and ward to C.R. in Km. 20 on ULBC Main Canal and H.R. of URBC (ForKharip Rotation) for year 2025-26)
Repair works to Piers Sill and Guide Wall for leakage prevention and strengthening and other ancillary works of KT Weir at Bordara
Repair works to Piers Sill and Guide Wall for leakage prevention and strengthening and other ancillary works of KT Weir at Burkegaon
Construction of Asphalting Road for SubDivision and Regional Workshop Under Mechanical Division Satara
Construction of Protection Wall to the west side of the Krishnanagar colony and Increasing height of the existing protection wall
Construction of Parking facility For the vehicles of Officers and Employees working In the Sinchan Bhavan Premises, At Satara
Repair of Village Road Bridges in Takari Main Canal Km 91 to 144
Maintenance and Repairs to K.T. Weir Mundhewadi Tal. Pandharpur For The Year 2025 -26 . Fixing and Removing M S Needles and Ancillary work
Maintenance and Repairs to K.T. Weir Gursale Tal. Pandharpur For The Year 2025 -26 . Fixing and Removing M S Needles and Ancillary work
Maintenance and Repairs to K.T. Pirachi Kuroli and Bhandhishegaon Tal. Pandharpur For The Year 2025 -26 . Fixing and Removing M S Needles and Ancillary work
Construction of Toilet Block at Shripur Sub Division and Sangam Section.
Repair Works of concrete in KM78 below and Both sides of VRB at CH.77 335 at Ujani Right Bank Canal, Canal Lining at KM. 12 of Dy. 33 and Repairing Of HR Gate of DY. 34.