Repairing rebuilding of boom assembly welding and embodiment and stick assembly repairing along with fitment of 06 nos Bush and 02 nos Pin through line boring and cabin glass fitment 02 nos in Shovel Sl No B695 under Tetariakhar OCP Rajhara Area
Removal repair n fitment of radius rod upper and lower both side repairing of propeller shaft n replacement of bush drive flying guard hydraulic mounting diesel tank foundation repair of engine transmission mounting repair of rear suspension LHS
Miscellaneous required civil works for uplifting of Sangam vihar colony under GM Unit, Piparwar Area
Custom Bid for Services - Rehandling of spilled coal slurry around 4 mtr floor area clean coal and middling bunker of post washery and its surrounding areas of main plant of Kedla Washery Similar Category Customized AMC/CMC for Pre-owned Products
Dismantling Fabrication and erection/repairing, alignment of take up drum structure of Transfer B/C and ROM B/C and counter weight structure (counter drum) of transfer B/C and ROM B/C in PCH section of Sawang Washery.
Dismantling, repairing, fabrication, erection and alignment of railway discharge chute with changing of plates, angles, beam and rail supporting structure in Railway Siding of Sawang Washery.
Monthly Basis Cab & Taxi Hiring Services - MUV; 3000 Km x 364 hours; Local
Comprehensive annual maintenance contract (CAMC) for day-day erection of 220V and 440V overhead line at quarry03, quarry 02, old and new coal stock, mini-quarry, weighbridge area etc. at Kathara OCP under Kathara Colliery for the period of 01 year o
SO(EnM)/GRD/E-NIT/26-27/17 Dtd- 25.06.2026
SO(EnM)/GRD/E-NIT/26-27/15 Dtd- 27.05.2026
SO(EnM)/GRD/E-NIT/26-27/14 Dtd- 27.05.2026
SO(EnM)/GRD/E-NIT/26-27/13 Dtd- 25.05.2026
Repairing, maintenance and erection of LT, Over Head Line (440V, 5wire system) at Vasant Vihar Colony near 750KVA Substation of Township Administration Bachra, under GM Unit, PPR Area.
Onsite testing and checking of different Protection Relays installed in Circuit Breakers and Starters, Transformer Tests of the 11 kV by 3.3 kV, 1.6 MVA Transformer including D.G.A. analysis of the Transformer Oil, and the 3.3 kV Motors installed at
Preventive protection of two nos. of 11 kV by 3.3 kV Power Transformers under Karo O.C.P., BnK Area
Onsite preventive maintenance of six nos. of Transformers, of capacity 25 kVA to 100 kVA, w.r.t. Karo OCP under BnK Area.
Repairing of one no. 3.3 kV, 400 A, Sr. No. 82249, Reyrolle Burne make OCB, being used for primary control of the 3.3 kV by 415 V, 630 kVA Transformer, installed at Kargali Railway Siding PF 2, under Karo OCP, BnK Area
Onsite testing and checking of different Protection Relays, installed in Circuit Breakers and Starters, DGA analysis of Transformer Oil of different Transformers, installed at Karo OCP, under BnK Area.
Repairing and part rewinding of one no. 3.3 kV, 350 kW, 1490 RPM, Marathon Electric make, Sr. No. F330123 by 1, Three Phase Induction Motor, installed in Mine at Karo OCP, under BnK Area
Onsite repairing of one no. Neutral Grounding Resistor 3.3 kV grade 50 amps, Maxtron make being used for neutral grounding of the 11 kV by 3.3 kV, 2 MVA Transformer, installed at the 11 kV Main Substation of Karo OCP under BnK Area.
Supply, design, and installation of AC DC Float cum Boost Charger 110 V AC to DC with heavy duty Industrial Battery and laying of AC DC supply line for different Circuit Breakers at the 11 kV by 3.3 kV Main Substation, under Karo OCP, BnK Area
Breakup of work for outside repair of Rear wheel hub, Rear brake system and floating seal re-placement in both side of BH100 Dumper sl.no. 1280, CIL no. D11117 (hours worked-18973) and sl.no. 1281, CIL no. D11118 (hours worked-18976) of KDH project.
Repairing and fitment of bushes of rod assy, tie rod assy A frame and engine and transmission guard, of HD465 Dumpers SL NO 10360 and 10362 of Rohini Project
Various Repairing and Replacement (R.H side Final drive from grounded Dozer) work in Dozer 13616, Replacement of Steering clutch both side including brake band both side, Repairing of brake bracket L.H side Repairing of End rod in steering control l
Installation of mounting set and load cell in RD1614 weighbridge of TYCOON make installed at AADOCM Project of Dhori Area
Repairing, Re-Conditioning of electronic Road weighbridge installed at KPS of 50te. Capacity, make ASEC under SDOCM Project, Dhori Area.
Repairing or refurbishment of foundation Slabs for four nos. of Lighting Transformers, and perimeter protection for the same including 3.3 kV grade Cable laying and switchgear Safeguarding in Mine, w.r.t. Karo OCP, under BnK Area.
Custom Bid for Services - Work of cleaning of Electrical MCC Room of main washery, pre washery, Post washery and other location of Kedla Washery Similar Category Facility Management Service- Manpower based (Version 2)
Vocational Training Services - Version 2 - offline; 4; Buyers Location; Skill Development
Calibration Services - Cleaning testing and adjusting of CI test weights each of 20Kg for annual verification and stamping of 02 nos 60MT Capacity Electronic Road Weighbridge Make Tycoon installed at Dakra siding and 01 Nos 120Te inmotion Rail weig..
Repairing of Blade assembly, Cutting edge, End bit, base plate and lift cylinder of BD155 Dozer sl. no. 13633 at Tapin North OCP.
Supply, providing and fixing of different rating MCCBs at different locations under Bokaro Colliery, BNK Area
Fabrication and installation of cable entry boxes for Transformer, Switchgear and Starter Protection against moisture and unauthorised access to the manpower installed at Bokaro Colliery, BNK Area
For CAMC of day-to-day basis repair/maintenance of different type of pump including new spare parts as DSM-3 (03) Nos., DSM-2 pump (02) Nos. and DSM-4 pump (01no) installed at C n D pump house, G M Office fountain pump and Asnapani Colony fountain p
Repairing of Operator cabin assy. with mounting, Anchor Assy., Pan hard rod and safety railing of B H60M dumper Sl. No. 60888 deployed at Topa OCP, Kuju Area.
Bio-Medical Waste Management Services for 06 dispensaries under Kuju Area.
Patch repair of Bituminous Coal Trunk Road near Chumba under GM unit of Kuju Area.
Filling with soil and rolling of field quarry ground under Kargali OCP of BnK Area
Cleaning, testing and adjusting of CI Test weights 20kg each for Annual Verification and Stamping of 50MT ASEC make electronic Road weighbridge installed at Sarubera Project under Kuju Area.
Monthly Basis Cab & Taxi Hiring Services - MUV; 2400kmx720hrs; Local 24*7
Repair and maintenance of Community place (Durga Mandap) at Sharda Colony under GM Unit of Dhori Area
Felling of 58 Nos of trees at saran sthal within premises of mines and transportation of logs from ROCP to charhi forest depot under Rajrappa Project
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete
Onsite running repair and preventive maintenance of 11KV/440V 750KVA, 630KVA, 500KVA, 500KVA, 315KVA, 200KVA, 250KVA Distribution transformers supplying power to different colonies under Bokaro Colliery, BNK Area
Dismantling and reinstallation of 60T capacity weightrack (Global ) make Weighbridge (RD1612) due to heightening of platform. Installed at AADOCM, Dhori Area.
Rewiring of PO Office at Karma OCP under Kuju Area.
brother OEM Toner Cartridge Manufactured by Brother, brother OEM Toner Cartridge Manufactured by Brother International (India) Private Limited
JK Sparkle 2.34 kilogram Ream of 500 Sheet 75 gsm A4 size Plain, JK Sparkle 2.34 kilogram Ream of 500 Sheet 75 gsm A4 size Plain Copier Paper
Handling, Transport and Other Mining Services - Percentage quote based - Handling & Transport Service, Loading and Transporting 150000 te Karo
MIRROR PART NO 649000078100, MIRROR649000063300