Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical MAIN ROAD RAMGARH CANTT 829122 | RAMGARH | RAMGARH | JHARKHAND | 829122 | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical 00 MUKUNDPUR PAHO DOMANPUR MUKUNDPUR PAHO MIRZAPUR UTTAR PRADESH 231306 | MIRZAPUR | UTTAR PRADESH | 231306 | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical MAIN ROAD KUJJU RAMGARH JHARKHAND 825316 | KUJJU | RAMGARH | JHARKHAND | 825316 | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
Refer Docs
EMD Value
₹6,400
Closing Date
27 Jul 2026, 6:55 pmClosed
SO(ENM)
GM UNIT KUJU
A) Repairing and rewinding of 100KVA 3.3KV/440V lighting Transformer installed at Pundi Project B) Rewinding of 300KVA 11KV/440V Distribution transformer installed at B type colony of Ara Colliery.
2026_CCL_362104_1
GM (K)/EnM/eTender/26-27/58
Open Tender
Electrical and Maintenance Works
Item Rate
15 days
GM UNIT KUJU
2 documents required · 2 mandatory
₹6,400
28 Jul 2026
16 Jul 2026
28 Jul 2026
16 Jul 2026
27 Jul 2026
17 Jul 2026
16 Jul 2026 - 23 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2 | A):-Repairing and complete rewinding of 100KVA,3.3KV/440V,Sl.no.Pundi/TR/05 lighting transformer,installed at quarry no.-1 of pundi project and is used for lighting power suppy to pumping ststion and approch road to pumping station as well as to mahua tungdi basti of pundi project under kuju Area | - | - | - | - |
| 3 | 15SWG Dual Coated Copper wires,Class H+Tempreture index 200 DEG Centrigard | 80 | KG | - | - |
| 4 | Less Scrap value 60% cost of copper | - | L/S | - | - |
| 5 | insulation cost @ 15% of cost of copper | 1 | L/S | - | - |
| 6 | Labour cost @15% of cost of copper | 1 | L/S | - | - |
| 7 | B):-Rewinding of 300KVA,11KV/440V,Sl.no.246,distribution transformer installed at B-type colony of Ara | - | - | - | - |
| 8 | 15SWG Dual coated copper wires class H+Temperature index 200 DEG Centrigrad | 240 | kg | - | - |
| 9 | Less Scrap value 60% cost of copper | - | L/S | - | - |
| 10 | insulation cost @ 15% of cost of copper | 1 | L/S | - | - |
| 11 | Labour cost @15% of cost of copper | 1 | L/S | - | - |
stage.html
html • 0.02 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.94 MB
BOQ_374995.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .