Loading…
Loading…
2,975 results • Latest
(A)Dismantling of tail drum and head drum size 950x500x10 mm, repairing and installation including repairing of its supporting structure of Unit No. 424 at 4.8 mtr level and (B) Dismantling of head drum and tail drum size 950 x 500 x 10mm, repairing
Dismantling, repairing and replacement of outer lining plate, top channel collar with stripner plate of dilated media tank of dimension dia 4.5mtr, conical length 3.5mtr., cylindrical length-Imtr. of Sec-1 in HMS Section of Kathara Washery
Repair, fabrication and erection of old, worn-out and damaged delivery pipe line from return water to 27 meter level in Hydro Cyclone Section of Kathara Washery
Supply and installation of Retro reflective sign boards at important locations (2) Radium letter writing with pasting for display of names of various switches / panels (3) Painting of various Control Panels / VCBs (4) Designing and writing of Safety
FIP of BS6D170 engine of BEML BD355 dozer, FIP of BS6D170 engine of BEML BD155 dozer
Fuel pump of Cummins QSk19C MCRS engine of BEML BH60 dumper
Monthly Basis Cab & Taxi Hiring Services - SUV; 3000 Km x 364 hours; Local
Painting of pole, danger board, pole numbering, anti-climbing device and pole base concreting for poles erected at GM Unit Kuju Area.
Customized AMC/CMC for Pre-owned Products - Weighbridges; Digital, Global; Comprehensive Maintenance Contract (CMC); fortnightly basis and as when required; Yes
Hiring of Special Purpose Mining or Earth Moving Machines (Monthly Basis) - As Per Buyer's Requirement; Truck Mounted mechanical road sweeper; Mechanical Sweeping and Vacuum Cleaner Trucks
Repairing and maintenance of 1 Nos 3 MVA 11KV/3.3KV Power Transformer and 2 Nos 1 MVA 11KV/3.3KV Power Transformer at Sirka Colliery under Argada Area
Repairing of 02 nos. 40 KW, 400A AC Welding generator machine and 01 nos 350 Amp. 3 Phase 550V oil cooled welding transformer of Sirka group
Monthly Basis Cab & Taxi Hiring Services - Premium SUV; 3000KM X 360 Hours; Local
Repairing of 02 nos. Lathe Machine, 02 nos. Static Drill Machine, 02 Nos Hand drill Machine of EnM workshop, Sirka Colliery
Onsite, supply installation of 02 nos 3.3 KV grade ,10Amps Neutral Grounding resistor for 02 nos 11KV/3.3KV , 03 MVA power transformer with onsite AMC and routine test for 01 year to be installed at main substation in respect of AKK OCP , BnK Area
A)Repairing of sprocket drum assembly and replacement of floating seal, TC gasket and transmission seal and (B)Repairing of equalizer bar, transmission and engine guard of BD-355 Dozer SL No. T-11592 at Kathara Washery
Repairing and overhauling of Terex Pay Loader, Vehicle No. 7221 at Kathara Washery
Monthly Basis Cab and Taxi Hiring Service - Without Fuel - SUV; Mahindra Bolero, Mahindra Scorpio, Toyota INNOVA CRYSTA; AS PER NIT; AS PER NIT; A/C; 12, Monthly Basis Cab and Taxi Hiring Service - Without Fuel - Premium SUV; TOYOYA INNOVA CRYSTA; AS PER NIT; AS PER NIT; A/C; 12, Monthly Basis Cab and Taxi Hiring Service - Without Fuel - SUV; Mahindra Scorpio; AS PER NIT; AS PER NIT; A/C; 12
Repairing after dismantling of old iron bridge channel angle plate etc. and repairing of ring gear box housing (02 Nos)and motorized gear box (02 Nos)and its fitting in thickener no. 1 in the Fine Coal Section at Kathara Washery
Spares for Dozer BD155
A)Repairing of propeller shaft, transmission flange, motor structure, diesel tank and replacement of different spares of CAT-988, SI No. A7A00269 Pay Loader at Kathara Washery B)Repairing of bucket assembly and steering control valve,(C)Repairing of
Repairing and replacement of 2 Nos. 8 Gay Pump of Unit No. 451 and 453 in Fine Coal Section of Kathara Washery
(A)Dismantling, repairing/overhauling and assembling of Gear Box GS-55 of 181 belt conveyor and (B) Complete repairing of 02 (two Nos. bearing block with bearing no. 22220EK of 52 belt conveyor head snub drum at Raw Coal Section of Kathara Washery
Complete repairing of 04 (four) nos. bearing block with bearing no. 22220 EK of 138 belt conveyor head snub drum and 181 belt conveyor tail drum (left and right side) in Raw Coal Section of Kathara Washery
Provision of approach road with guard wall at Giddi-A OCP 60 MT weigh bridge under Giddi-A of Argada Area.
Provision of earthen embankment at Pokhariya under Sirka OCP of Argada Area.
Comprehensive Annual Maintenance Contract of Administrative block and other services buildings under Giddi-C Project, Argada Area. (For a period of 02 years).
Comprehensive Annual Maintenance Contract of Administrative block and other service buildings under Gidi-A Project, Argada Area. (for a period of 02 years).
CAMC of 90 nos. CCTV Cameras along with all associated accessories with Hiring of OFC for central Monitoring at ICCC Kuju Area.
Supply, laying, fixing, welding, jointing, testing and commissioning of 63 mm dia High-Pressure Fire Fighting Hose with delivery coupling, nozzle, complete in all respects at Coal Stock under Rohini Project, N K Area, CCL
Day-to-day repair and Electrical maintenance of DG sets, Electrical equipment of offices along with 440V power line of BnK water supply pump house, Balu Bankar water supply pump house, Hospital colony water supply pump house, Ambedkar colony water su
Construction of shed with ramp and toilet for community meeting at Saunda Basti Panchayat , Barka-Sayal Area.
Repair and maintenance of SDL 969 and SDL 880 of 7/8 incline of Dhori khas colliery.
Construction of Chhath ghat at Saunda basti panchayat under CSR Scheme of FY 2025-26 of Barka-Sayal Area
Laying, erection, dismantling, diversion and repairing of 150mm and 200mm dia pipeline for monsoon preparation under Bhurkunda Colliery.
Fresh Wiring of newly Builded Canteen with accessories etc as required At Pit office Of ashok OCP.
AMC for Engine overhauling of 04 nos. DG set in which 02 nos. of 30 KVA installed at Rest House and GM banglow and 02 nos. 0f DG set ( 06KVA and 10 KVA ) running at Bhurkunda AKC Hospital for a period of 1 year under Bhurkunda Project
Repair cum preventive maintenance works of the Global make, 60 Te. capacity Electronic Road Weighbridge no. 4, under Karo OCP, BnK Area
cable jointing kit 50MM2, CU, 6.6KV
Repair cum maintenance works of the Global make, 60 Te. capacity Road Weighbridge no. 5, under Karo OCP, BnK Area
Miscellaneous repair works of the Global make, 60 Te. capacity Road Weighbridge no. 3, under Karo OCP, BnK Area
Requirement for Cleaning of ETP, Sedimentation Ponds, Catch Drains, and Cleaning and re-painting of environmental Display Boards at North Urimari Project under Barka-Sayal Area
LT Over Head line pole grouting, strengthening of ckt and painting of pole at KKC Upardhada, Pakkadhada Old Durga Mandap colony area under Sayal-D Project.
LT Over Head line pole grouting, strengthening and earthing of 1-B staff colony circuit under Sayal-D Project
Monsoon 2026 activity regarding Repairing of 2000 GPM, 150 mtr head pump of Sayal-D OCP
Dismantling, diversion and erection of 3.3 kV OH Electric Line, for providing power to Shovel, involved in O.B. removal at new proposed location in D.D. Mines, w.r.t. Bokaro Colliery, under BnK Area.
Re-organisation of lighting O/H Lines in Haul Road due to development of Haul Road, under Bokaro Colliery, BnK Area.
Extension of existing pipelines at Topa OCP and Karma OCP for firefighting purpose.
Custom Bid for Services - SUPPLY OF COOL DRINKING WATER Similar Category Hiring of Water Tanker Service
Guard wall provisioning at Karo RFID check post under Karo OCP of BnK Area