Loading…
Loading…
3,139 results • Recent activity
Diversion and shifting of the Digital Flowmeter installed at the delivery pipeline of the 2000 GPM Pump by dismantling, cutting and laying of 8 inch dia M.S. Pipeline, in Mine w.r.t. Karo OCP, under BnK Area
Dismantling and laying of 8 inch dia M.S. Pipeline required for extension of delivery pipeline of the 2000 G.P.M. Pump Motor Set installed at the A patch in Mine, involved in dewatering of the A patch, w.r.t. Karo OCP, under BnK Area
Dismantling and diversion cum erection of 220 V OH Electric OH feeding power to the Road weighbridges no. 4 and 6, w.r.t. Karo OCP, under BnK Area
Providing, laying and fixing of 6.6 KV grade HT cable in High tension line near zero point across the transporting road at Amrapali OCP under A-C Area
Making of Portable Sheds, with internal electric wiring for the three nos. of 2000 G.P.M. Pump Motor sets, installed in Mine, w.r.t. Karo OCP, BnK Area
Dismantling and diversion cum laying of 8 inch dia M.S. Pipeline of the two nos. of 2000 G.P.M. Pump Motor Sets, in the A Patch in Mine, suppplying water to the Water Tanker Point, w.r.t. Karo OCP, under BnK Area