Provision of Rain Water Harvesting Pit at Substation of Rohini OCP Under Rohini Project, NK Area
Onsite Fabrication, Erection, Testing and Commissioning of One LT Secondary Control Cubicle with Weatherproof Shed for Existing 630 KVA Transformer Installation at Chalkari Site, Bokaro Colliery
Tape vlcnzd rubber, Drill Machine 850W, Digital Multimeter 3V, 1.1KV, 2C, 1.5 Sqmm Cable, 3C, 6 Sqmm Cable, 4C, 2.5Sqmm Cable, MTR TST CLMP, 0 to 1200 0- 1000A AC DC, DGTL, PUMP BARREL ROTARY WIPE 4M, CRIMPER HYD, 6-300MM2, BLOCK TACKLE CHN PLLY, 3TON, WRENCH SET CMBNTN 5 by 16 TO 1-1 by 8IN, 8NOS, PLIERS CUTNG, 8IN, WRENCH ADJSTBL 375MM, TAPE ADHSV STL GRIP 3 by 4 IN X 10 M, GREASE GUN 1KG, HND, With ACCSSRS, COTTON WASTE, DOUBLE FACED SLEDGE HAMMER 5.4 KG, SLING WRE RPE 25MM, 8M
Monthly Basis Cab & Taxi Hiring Services - SUV; 2500 km/month X 36 Months(1095 days) X 24 Hours/day; Outstation
LOW HYDROGEN ELELECTRODE, 4 MM X 450 MM
Fitment of Safety Glass in BH60M Dumpers 60781, 60882, 60937 and WS 28 II Water Sprinkler Sl. No. 28016 and repairing of operator cabin, railing platform of dumper 60937 of Religara Colliery.