Loading…
Loading…
2,984 results • Latest
Repairing of two nos. of pumps of capacity 1000 GPM at KOCP under Hazaribagh area
Day to day dismantling, shifting and installation, laying of Pump-Motor set for smooth dewatering operation during monsoon season at KOCP under Hazaribagh area
Rewinding/Repairing of 2 Nos HT Motor A. 165 KW, 1470 RPM 3.3KV induction motor make Alstom B. 125 KW, 1470 RPM 3.3KV induction motor make Marathon of JOCP under Hazaribag Area
Making shed and platform for pump, transformer and switches at various locations in mine at Rajhara OCP under Rajhara Area.
Cleaning, testing, repairing and adjusting of CI test weight of 20 kg each for Stamping of 100 Ton capacity road weighbridge make Tycoon installed at Rajhara Colliery Rajhara Area
Preparation of new earthpit and reconditioning, treatment of old earthpits to improve earth valve in different location of Amrapali OCP under A-C Area
Repairing and Re-conditioning of 2 Nos. Diesel pump Engine Rating 228.16 KW at 126.5 KW installed at different places at Amrapali OCP under A-C Area
Replacing of damaged fabricated poles at OB dump, strengthing of tilted poles at different location and providing and fixing conductor spacer on all LT overhead line at Amrapali OCP under A-C Area
Repairing and reconditioning of existing CCTV and CAMC for 01 year with supply and repairing of anticipatory spares wrt Kathara Area
Extension of existing internet connection at various locations of Magadh OCP and provision of network switch, wifi dongle and other necessary items at all the weighbridges, check posts and other locations of Magadh OCP, Magadh-Sanghmitra Area
Preparation of monsoon by provision and repair of garland drain, cross drainage work, CTR road repair in Bokaro Colliery of BnK Area
Earthing of metallic pole of overhead Line Located in public movement areas of Balumath, Bukru and Phulbasiya siding nearby railway station, coal receiving Shelter, pumping station, weighbridges and 500 KVA Distribution Transformers area of Magadh
Fabrication of three nos of pontoon at different sump of AADOCM project Dhori Area
Repairing the damaged overhead line and shifting the tilted electric tubular poles between coal stocks 32 and 28, near the pond of WB - 15, the viewpoint, and near the Kundi Sub-Station of Magadh OCP under the M-S Area
Cleaning, testing, and adjusting the C.l. test weights (20kg) for annual verification and stamping of rail in motion Weighbridges installed at Balumath siding Line No-01 n 04, Capacity - 140 MT under Magadh OCP, M-S Area
Carriage of Spillaged Coal from the Raw Coal Section by Manual Labour at Rajrappa Washery Project
carriage of spillaged coal from the surrounding area of media circuit by manual labour including loading unloading stacking and work of iron ore loading and charging by manual labour to media tank or a period of 1 year in RJP Washery
Repairing of 04 nos HT motor in view of Monsoon 26-27 installed at AADOCM Project Dhori Area
Day to day repairing and maintenance of railway track,cleaning of tracks and drains for 02(two) years at Tarmi Siding under SDOCM Dhori area.
Cleaning of Garland drain, pucca drain near Pit Office, base workshop and unit store, Kutcha drain cutting along the haul road at Kathara mines under Kathara Colliery, Kathara Area
Cutting of Garland drain including cleaning of existing drains and new drains at different places
End termination or pole mountings of different size and voltage grade cable with supply and installation of chemical earthpits at 4,5,6 and 7,8 incline sub-station and colonies transformer pins etc. of Dhori (K) colliery, Dhori Area
Repairing of 2000GPM, 150mtr. Head pump, type 10/12 make MnP Sl No 81316960/20/06 of Rajrappa Project.
repairing and maintenance of 06 nos. of HT starters installed in mines of Rajrappa Project for upcoming monsoon.
Cleaning of drain Providing roofing sheet at damaged portions and trimming under Rajrappa Washery Project Retender
Barbed wire Fencing and plantation work at NSG UG mouth Makoli under Dhori Khas project of Dhori Area .
Lifting, Lowering activity of Submersible pump installed at different old shaft for domestic water supply to CCL as well as its periphery area, Giridih Project.
For uninterrupted power supply to DAV public school Kedla Nagar at Kedla OCP under Hazaribagh Area.
rewinding /repairing of A)160 KW , 215HP, 550Volt, 1488RPM make CG Sl no-NADZX17531 and B)90 KW 120HP, 550Volt, 1480RPM make CG sl no- of KOCP under Hazaribag Area
Supply fixing of limit switch and MCCB DT of rating 630 and 800 amps at different locations of KOCP.
Repair and maintenance of 6 nos. DG set under CCD, Dhori Area.
Repairing/ hot vulcanizing of trailing cable steel round armoring with screening semi conduction layer 18 Nos. joints Shovel Sl. No- Exc-1075, Exc-1851 and Exc-2859 of Kathara Colliery.
Dismantling, loading, transporting, laying and jointing of 6inch dia GI MS pipe line 3 range and installation shifting of 03 set 1000 GPM pump motor set for dewatering of Karipani sump to discharge point under SDOCM, Dhori Area.
Laying of New pipeline at IV seam mine at KOCP under Hazaribag Area.
Providing and fixing of Garden lights with cable laying and other miscellaneous works in campus of Doctors colony at Central Hospital, Ramgarh.
Shifting of motor pump set for arrangement of pipeline work during monsoon 2026 of capacity 2000 GPM and 1000 GPM installed or shifting at different locations of SDOCM Mine
Laying of 6inch or 4inch dia pipe Including shifting of pumps for SDOCM project Dhori Area
Replacement of Garden lights with allied works in campus of Mines Rescue Station, Ramgarh.
Annual maintenance Contract for repairing/replacement of 440V overhead power line as and when required and also during heavy storm, rainfall etc on emergency basis for a period of 01 year at MRS, Ramgarh
Laying 10 dia MS pipe 01 range length 3050 m patch A area from main sump to near IOCL Plant Nala under Ashok O C P PPR Area.
Providing and fixing of V-belt link belt Gland packing with provision of tyre coupling with pilot bore for smooth running of pumping operation under Ashok project PPR Area.
Bush cutting/branch trimming on as and when required basis 5 mtr both side of 33kv, 11kv, 3.3 kv HT Overhead lines, LT overhead lines of mines under Ashok OCP and outer premises of 10 MVA, 5 MVA Sub station and TSS installed in different location of
Laying of HDPE pipe and lay flat hose (490 mtr length) from main dewatering pie line of patch A towards coal stock 90 for prevention of spontaneous heating of coal and (2) Laying of ms pipe 150 mm dia length 790 mtr from departmental patch to OB d
Repairing and rewinding of 250 KVA, 3.3KV/440V local Sl. No. BHK/OWS/Tr-24 oil cooled transformer under Bhurkunda Colliery.
Cutting and Cleaning of Catch drain and sump arrangement around OB dump and Laying of hume pipes at different locations at TTK OCP under Rajhara Area
SO(EnM)/GRD/E-NIT/26-27/03 Dtd- 11.04.2026
LED Luminaire for Floodlight (V2) Conforming to IS 10322 (Part 5/Section 5) (Q3)
Dismantling, shifting and installation of 500 GPM pump along with pipeline work for matching installed at 3 no. old Makoli sump under Tarmi OCP
Custom Bid for Services - FIREFIGHTING Similar Category Manpower Outsourcing Services - Man-days based
Repair maintenance of 3 nos. pump installed in 3P sump and 2 nos. pump for face pumping under SDOCM Project , Dhori Area