Loading…
Loading…
130 results • Latest
AS PER BOQ
Construction of Embankment with mechanicaly compacted earth with approved material obtained from borrow pits with a lift upto 1.5m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 Engineer-in-charge as per MORD clause 3.4(301.5).
AS PER BOQ
Construction of Embankment with mechanicaly compacted earth with approved material obtained from borrow pits with a lift upto 1.5m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 Engineer-in-charge as per MORD clause 3.4(301.5).
AS PER BOQ
Construction of embankment with machnicaly compacted earth with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 Engineer-in-charge as per MORD clause 3.4(301.5). (Rates are including all taxes, royalty, labour cess etc but Exculding GST shall be paid as per applicable)
AS PER BOQ
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil Clquse No. 201(i)/A
AS PER BOQ
Construction of Embankment with approved material obtained from borrow pits with all lifts and leads transporting to site spreading grading to required slope and compacting to meet requirement of table MORD Spec.. 300-2 (Cartage Earth up to 1 km.)
Raura Bakauli Road to Nangla Beach Nagla Jakha Harchandi Road
Construction of subgrade and earthen shoulders with apprved material obtained from borrows pits with all fifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300.2 with lead upto 1000 m as per technical Specification Clause 303.1 (Including All Taxes but Excluding G.S.T.)