Loading
Loading…
Loading…
204 results • Recent activity
Clearing Touchings on LT lines under Electrical Section Perinjanam
LT reconductoring work of Edakulam church transformer under Electrical section, Irinjalakuda No1
LT RECONDUCTORING KALLIDAMKUZHIPEEDIKA TRANSFORMER AREA
Reconductoring LT OH wire with ACSR Rabbit 3.5km, Lt OH3 wire with ACSR Rabbit 1.2 km, Reconductoring OH 4 wire 1km,5 wire 4km
Supplying of Mini Lorry (above 2.5 Tone and below 5 Tone) not more than fifteen year old with driver to Electrical Division North Paravur, from 01.06.2026 to 31.05.2027( one year)
CONSTRUCTING NEW HT FEEDER FROM PATHIRAPALLY SUBSTATION TO MUHAMMA WITH 3.85KM UG CABLE