| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹27.6 LAccepted-AOC 35 AURI MORE ANPARA ANPARA SONBHADRA UTTAR PRADESH 231225 UDYAM UP 72 0015681 09CSTPD3288A2ZJ R M MII STATUS AS VERIFIED | SONBHADRA | UTTAR PRADESH | 231225 | ₹27.6 L | 1 | Accepted-AOC Lowest |
| 2 | 2₹28.2 LRejected-AOC ILANJIPARAMBIL VELLAKKINAR ALAPPUZHA | ALAPPUZHA | ALAPPUZHA | KERALA | ₹28.2 L | 2 | Rejected-AOC Second Lowest |
| 3 | 3₹33.4 LRejected-AOC 61 3134 1ST FLOOR MATHA ARCADE KSN MENON ROAD VRM ROAD JN RAVIPURAM KOCHI 682016 | KOCHI | ERNAKULAM | KERALA | 682016 | ₹33.4 L | 3 | Rejected-AOC Third Lowest |
| 4 | Rejected-Technical | - | - | Rejected-Technical EMD not remitted |
| 5 | Rejected-Technical 4 63 RAJESH BHAVAN CHANNACKAMON KARAVOOR PO KOLLAM | KOLLAM | KOLLAM | KERALA | - | - | Rejected-Technical EMD not remitted |
| Sl No | Description | Qty | Unit | ADDYUTHIYA POWER PROJECTS PRIVATE LIMITED | Pradeep Lal | LAS POWER | Skylark Enterorises | HI TECH ENGINEERING |
|---|---|---|---|---|---|---|---|---|
| 1.00Labour | ||||||||
| 1.01 | Fitting and erecting one HT PSC Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads. | 14 | No | 52,500 ₹61,950 | 36,666 ₹43,265.88 | 38,766 ₹45,743.88 | 35,000 ₹41,300 | 45,841.04 ₹54,092.43 |
| 1.02 | Fitting and erecting one HT DP using PSC pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads. | 2 | No | 20,000 ₹23,600 | 13,976 ₹16,491.68 | 14,000 ₹16,520 | 13,600 ₹16,048 | 17,471.46 ₹20,616.32 |
| 1.03 | Providing one Driven Earth using GI earth pipe at standard distance away from the pole/structure in loose soil. | 19 | No | 28,500 ₹33,630 | 9,006 ₹10,627.08 | 53,903 ₹63,605.54 | 8,759 ₹10,335.62 | 19,000 ₹22,420 |
| 1.04 | Fitting one set AB switch and giving connection | 2 | No | 7,000 ₹8,260 | 4,470 ₹5,274.60 | 3,736 ₹4,408.48 | 4,360 ₹5,144.80 | 5,724 ₹6,754.32 |
| 1.05 | Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP incl. conveyance of materials. | 12 | No | 21,000 ₹24,780 | 5,400 ₹6,372 | 4,524 ₹5,338.32 | 5,160 ₹6,088.80 | 6,774.6 ₹7,994.03 |
| 1.06 | Fitting one LT 2 line cross arm on HT or LT existing poles incl. fitting insulators and binding the same with LT Line. | 45 | No | 11,250 ₹13,275 | 5,040 ₹5,947.20 | 41,310 ₹48,745.80 | 4,500 ₹5,310 | 6,304.05 ₹7,438.78 |
| 1.07 | Drilling hole of various sizes on existing Channel/Cross Arm. | 85 | No | 2,550 ₹3,009 | 1,134.75 ₹1,339.01 | 935 ₹1,103.30 | 1,190 ₹1,404.20 | 1,422.05 ₹1,678.02 |
| 1.08 | Loading HT PSC pole from the stacking place and unloading the same at work site (transport by vehicle). | 18 | No | 18,000 ₹21,240 | 10,971 ₹12,945.78 | 10,908 ₹12,871.44 | 10,800 ₹12,744 | 13,718.52 ₹16,187.85 |
| 1.09 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading. | 5 | Trip | 25,000 ₹29,500 | 12,569 ₹14,831.42 | 10,500 ₹12,390 | 12,500 ₹14,750 | 15,711.3 ₹18,539.33 |
Tender Value
₹35.3 L
EMD Value
₹88,200
Closing Date
5 Nov 2025, 5:00 pmClosed
Executive Engineer
Project Management Unit KSEBL Alappuzha
CONSTRUCTING NEW HT FEEDER FROM PATHIRAPALLY SUBSTATION TO MUHAMMA WITH 3.85KM UG CABLE
2025_KSEB_809410_1
PMU ALP/E TENDER/2025-26/02/14.10.2025
Open Tender
Electrical Works
90 days
Pathirappally to Muhamma
As per tender documents
4 documents required · 4 mandatory
₹5,900
Yes
₹88,200
Yes
24 May 2026
15 Oct 2025
7 Nov 2025
15 Oct 2025
5 Nov 2025
16 Oct 2025
16 Oct 2025 - 31 Oct 2025
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1350552.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.48 MB
Tender_Documents_UG.pdf
Tender Documents • 0.57 MB
Technical_Field_Requirement.pdf
Other Document • 0.34 MB
BOQ_1350552.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid