Loading…
Loading…
9,664 results • Latest
Loading, Transportation, Dozing and Handling of Gypsum at FACT (CD) for a period of one month.
Loading, Transportation, Dozing and Handling of Gypsum at FACT (CD) for a period of one month.
Reclamation and Reclaimed Gypsum Transportation to Phase-1 Yard for a period of 45 days at FACT-CD
Reclamation and Reclaimed Gypsum Transportation to Phase-1 Yard for a period of one month at FACT-CD
ANALYSIS OF OIL, COOLENT AND WATER FOR NAVY SHIP
ANALYSIS OF LUB OIL, COOLENT, HYDRAULIC OIL AND PORTABLE WATER. PAYMENT BASED ON THE ACTUAL. ANALYSIS OF LUB OIL, COOLENT AND PORTABLE WATER OF ALL MAIN ENGINES, DIESEL ALTERNATORS, GEAR BOXES AND AUXILARY MACHINERIES TO BE CARRIED THROUGH NABL CERTIFIED LABORATRY AND Three COPIES OF THE EACH REPORT TO BE SUBMITTED WITHIN 24 HOURS OF TEST UNDERTAKEN.
SPECIAL REPAIRS TO P-165 P-98 OVER HEAD TANKS (OHT) AT NAD AND PARIYAR VIHAR AT NAD ALWAYE
Drilling and installing the 12 mm dia holes about 100 mm on the concrete beam/slab. Cleaning the holes with compressed air and a spiral brush to free them from drill dust and fixing GI packer of 10 mm dia OD (to sustain pressure up to 10 Kg/cm2) in 12 mm dia holes. Grouting with 1 K high-performance polyurethane grout – CERA Inject SS shall have a minimum pot life of 15 minutes at maximum expansion of 2,700 %( Ratio 10; 1Resin water). It shall achieve a minimum tensile shear strength 4 /Nmm2 incl scaffolding upto 20mtr height complete all as specified and directed
SOIL INVESTIGATION FOR PROVISION OF DEF SINGLE LIVING ACCOMMODATION FOR DSC AT NAVAL BASE KOCHI UNDER GE (P) (NW) KOCHI
Mobilization
CUTTING ELECTRODE_9-8232, CUTTING TIP_9-8211_80 A_, CUTTING TIP_9-8212_100 A_, CUTTING ELECTRODE_9-8390, CUTTING TIP_ 9-8395
Consumables for Plasma Machine