Loading…
Loading…
690 results • Recent activity
Improvement and widening AT road to kaifung Para PMGSY road to Sadhu Para ( L407)(Length-0.62),2.No Regrouping Colony to Ompi Raban Para PMGSY Road ( L402) (Length-0.771),Regrouping colony to Ompi Raban PMGSY road ( L401) (Length-0.793 km) under
Running Maintenance of RWS Scheme in Ampi RD Block/ carrying of drinking water during drought period as an when required at different locations within DWS Sub-Division Ampi, Gomati Tripura during the year 2025-26 .
please refer to the DNIeT
Please refer to DNIeT
JJM Scheme in Boxanagar RD Block under Sepahijala District/ Construction of Cement Concrete platform , G.I. post including necessary fittingsattached to different DTW and SBDTW Schemes for FHTC under the
O and M of UWS/RWS scheme in North Tripura District of DWS Division Dharmanagar 2025-26/Providing, applying of Bleaching powder, Hydrated lime for production of quality treated water as per guideline of WHO/BIS of DWS Sub Division Dharmanagar/Gr-III