Loading…
Loading…
1,260 results • Recent activity
SH Construction of retaining wall at Ch.0.0.075 Km Ch.2.350 Km and 2.680 Km
SH-Metaling, Grouting, Re-carpeting, Tack Coat, Seal coat, Surface drain etc. during the year 2025-26.(3rd Call)
SH-Metaling, Grouting, Re-carpeting, Tack Coat, Seal coat, C.C Block and Surface drain etc. during the year 2025-26.(2nd Call)
Providing Installation commissioning of 15 and 2 TR Split type high wall inverter compressor technology Air Conditioning machines at OT unit in the newly constructed Sabroom Sub Divisional Hospital Sabroom South Tripura
1 Providing Installation commissioning of Hi Wall split type air Conditioning System in the Court Chamber of the Civil Judge Jr Div Cum JM 1st Class and the Chamber of the Judge Vulnerable witness Deposition Centre at Khowai Court complex Khowai Di
Pot holes repair, sand seal coating, PMC Work and surface drain