Loading…
Loading…
1,240 results • Recent activity
CAMC for 03 Three No Elevators OTIS make of different capacity installed at NTH l Near Registration Counter Medicine Block Near Main Entrance Jayanti Block near Emergency in AGMC and GBP Hospital Agartala
SH- Patch metalling, grouting, carpeting/ re-carpeting, seal coating, constn. of unlined surface drain, placing of gunny bags etc.
SH- Patch metalling, grouting, carpeting/ re-carpeting, seal coating, constn. of unlined surface drain, placing of gunny bags etc.
Strengthening of road starting from KA road to Sudhangshu Ghosh para (Length - 1.50 Km) during the year 2024-2025/ SH- Patch metalling, grouting, carpeting/re-carpeting, seal coating, constn. Drain etc.
Strengthening of road from KA road to Ghantacharra via Devendra Medical Hall (L-1.50 km)/GSB, WBM-II, WBM-III, Carpeting Road side drain, protection wall, CD etc.
Strengthening of road from NH-8 to Kamalacharra from Ch.0.00 Km to Ch.1.50 Km (L-1.50km)/GSB, WBM-II, WBM-III, Carpeting Road side drain, protection wall, CD etc.