Loading…
Loading…
1,241 results • Recent activity
Strengthening of road from NH-8 to Kamalacharra from Ch.0.00 Km to Ch.1.50 Km (L-1.50km)/GSB, WBM-II, WBM-III, Carpeting Road side drain, protection wall, CD etc.
Improvement of road from Patni Chachu Bazar to Bidhyadhan para under Mandwi R D Block. Group I ( ch 0.00 km to 1.00 km, Length 1.00 km).
Improvement of road from Satpara PWD road to Kamanmura under Mandwi R D Block (Length 1.00 km) during the year 2024-25.
Improvement of Brick soled road from Wakhirai Sardar para to Kwtwi para under Belbari R.D. Block (L 0.800 Km) during the year 2024-25.
Improvement of Brick soled road from RC Colony to Ramkrishna para under Belbari R.D. Block (L 0.700 Km) during the year 2024-25
Patch WBM, Grouting, Re-carpeting and seal coating etc.