Found 22 active tenders
22 results • Latest
Urgent Major Mtc. and strengthening of approaches of CDs, syphones, cut _ covers, aqueducts. Spun pipes, culverts, main canal in/c. branch canals of Left Bank Canal of KMIP (at Ch. 7500.00 to 17594.00 Mtrs.) during the year 2025-26. (2nd Call)
Excavation for Structures A. Without dewatering. Earthwork in excavation for structures as per drawing and MoRD technical specifications Clause 305.1 including setting out, construction of shoring & bracing, removal of stumps & other deleterious material and disposal upto a lead of 50 m, dressing of sides & bottom and backfilling in trenches with excavated suitable material. i) Ordinary Soil i) Upto 3 m depth
Urgent Major Mtc. and strengthening of approaches of CDs, syphones, cut _ covers, aqueducts. Spun pipes, culverts, main canal in/c. branch canals of Right Bank Canal of KMIP (at Ch. 5500.00 to 13600.00 Mtrs.) during the year 2025-26.(2nd Call)
Excavation for Structures A. Without dewatering. Earthwork in excavation for structures as per drawing and MoRD technical specifications Clause 305.1 including setting out, construction of shoring & bracing, removal of stumps & other deleterious material and disposal upto a lead of 50 m, dressing of sides & bottom and backfilling in trenches with excavated suitable material. i) Ordinary Soil i) Upto 3 m depth
Urgent Major Mtc. and strengthening of approaches of CDs, syphones, cut _ covers, aqueducts. Spun pipes, culverts, main canal in/c. branch canals of Right Bank Canal of KMIP (at Ch. 0.00 to 5500.00 Mtrs.) during the year 2025-26. (2nd Call)
Excavation for Structures A. Without dewatering. Earthwork in excavation for structures as per drawing and MoRD technical specifications Clause 305.1 including setting out, construction of shoring & bracing, removal of stumps & other deleterious material and disposal upto a lead of 50 m, dressing of sides & bottom and backfilling in trenches with excavated suitable material. i) Ordinary Soil i) Upto 3 m depth
Mtc. of different MI Schemes under Teliamura R.D. Block during the year 2025-26 under Water Resource Sub-Division Teliamura /SH_- Mtc. of priming tank, Pipe line leakage and other allied works etc. (Job No. TR/60/Minor Works/WRD-I/2025-26)(2nd Call)
Excavating trenches required width for pipes, cables, etc. including excavation for sockets, dressing of sides where required, ramming of bottoms , depth upto 1500mm (Slope-1 in 200) including getting out the excavated soil and backfilling of soil as required after laying of pipeline, in layers not exceeding 200mm in depth including consolidating each deposited layers by ramming watering etc. and disposing of surplus excavated soil with all required lead as per chapter 2 of CPWD specification & direction of the Engineer-in charge. A) For UPVC pipes in new work i) For pipes exceeding 90 mm dia but not exceeding 300 mm dia
Laying of new distributory PVC pipe line and repair of existing pipe line from Left Bank Main Canal to the agricultural land under Vivekananadanagar GP / SH_- Providing_laying of PVC pipeline, construction of storage reservoirs and other allied works
Making road crossing by horizontal boring for smooth laying of UPVC / CI / DI / GI pipes etc. of required dia complete as per specification and the direction of the Engineer-in-charge. i) By manual means
Renovation of Left Bank Canal of KMIP / SH_- Construction of new canal by brickwork (Length _ 65.50 Mtrs.) _ repair of existing canal (Length _ 525.00 Mtrs.) of Gamaibari Branch Canal.. 2024-25. (Job No. TR/13/SE/WRC-I/2059/2025-26) (2nd Call)
Excavation for Structures A. Without dewatering. Earthwork in excavation for structures as per drawing and MoRD technical specifications Clause 305.1 including setting out, construction of shoring & bracing, removal of stumps & other deleterious material and disposal upto a lead of 50 m, dressing of sides & bottom and backfilling in trenches with excavated suitable material. i) Ordinary Soil i) Upto 3 m depth