Loading…
Loading…
137 results • Latest
Construction of RCC foot bridge L 37.00 Mtr at Taiharchung Bari over Marandi Cherra near Kasoo Bazar under Dakhin Maharani VC of Matabari RD Block.
Name of the Job
Construction of Blacktop road from Udaipur Kakraban main road via PWD road via Khiruda sundari AWC at Ichacherra GP under Udaipur Division during the year 2025-26.
Name of the Job
Vertical Extension for construction of Temporary Boys and Girls hostel at Roof top of existing Building of integrated Ayush Hospital, Udaipur, Gomati District.
Name of the Job
Construction of Blacktop Road from Laltilla Bazar to Roy Para Ward No-3 of Bijoynagar under Mohanpur Block under RD Mohanpur Division during the FY-2025-26 (L-540 Mtr.)
Select, At Par, Excess (+), Less (-) IOCL
Internal electrification work for the Construction of 02 nos Health Sub Centre at Purbajoy Reang Para SC, Kathaliachara SC of Bokafa RD Block under the jurisdiction of RD Santirbazar Division
Select, At Par, Excess (+), Less (-) IOCL
Internal electrification work for the Construction of Health Sub Centre at Gaburchara SC of Hrishyamukh RD Block under the jurisdiction of RD Santirbazar Division
Select, At Par, Excess (+), Less (-) IOCL