Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
71 live46 closing this weekmost from Chief Engineer (Special Project) PHED, Jaipur
71 results • Latest
Providing laying and jointing and commissioning of various types and sizes of pipeline under Proect Sub Division Pali
Providing laying and jointing and commissioning of various types and sizes of pipeline under Sub Division Rohat.
Providing laying and jointing and commissioning of various types and sizes of pipeline under City Sub Division Pali
Annual Rate Contract for Construction and Commissioning of 200 mm Dia. Tube Wells including 2 Years Defect Liability Period Under City Circle Jodhpur
Annual Rate Contract for Stationery Supply in Office of Chief Engineer (Rural) PHED Jaipur.
Annual Rate Contract for Refilling of Printer Cartridges/Cartridges parts of different makes in Office of Chief Engineer (Rural) PHED Jaipur.
Annual Rate Contract for photocopy in office of Chief Engineer (Rural) PHED Jaipur
AUCTION DIVISION STORE
CONSTRUCTION OF 1 No OHSR OF 200KL CAPACITY ALONG WITH PUMP HOUSE AT JAIN TEMPLE, BARA PADAMPURA UNDER JURISDICTION OF PHED SUB DIVISION CHAKSU
Work of Narmada Based Water Supply Project for 163 Villages of Dhorimanna and Chouhtan Block Distt Barmer Pkg CP-03 JICA Funded
Annual Rate Contract for Providing, Laying, Jointing, testing and commissioning of pipe line and allied works at various schemes under jurisdiction of Division Baran, DISTT. BARAN
Construction and commissioning of 200mm dia tube well and Pipe line in Village Ramgarh G.P. Ramgarh Tehsil Kishanganj District BaranPipe line in Village Ramgarh G.P. Ramgarh Tehsil Kishanganj District Baran
Work for Construction of Water Treatment Plants, CWRs &ampamp CWPHs Near WTPs Clear Water transmission main From WTP various IPSs, Laying of Rising mains to different ESRs,etc Kaliteer Water Supply Project on Hybrid Annuity Model (HAM).
Work for Const. of Intake well inside Chambal River including Approach Bridge, const. of RWR including all works required for inlet inside RWR, outlet system from RWR to outlet chamber, WTP, CWR, RWPH and allied works Package-1, Hybrid Annuity Model
Work of Cons. of CWR and Block CWPH at various locations for clusters, laying of transfer main from block PS to block CPS, rising main from block CPS to Block ESRs, construction of ESRs, laying of cluster distribution mains under Hybrid Annuity Model
Work of “Construction of Intermediate CWPH at Kotra (Baseri), laying of Clear Water transmission main From Kotra to Naroli, Nadbai via junction 2 at Naroli, IPS Nadbai, Nagar, Ramgarh, Kishangarhbas Tijara (Jairolı) under Hybrid Annuity Model
Work for strengthening of Intake well inside Chambal River, construction of approach Bridge, construction of RWR including all works required for inlet inside RWR, outlet system from RWR to outlet chamber, WTP, Construction of CWR and Allied works
work of Chambal Sawai Madhopur Nadoti Water Supply Project CSNP Package3 for providing surface water to the 1424 villages of Karauli and Sawai Madhopur District through FHTCs under Jal Jeevan Mission with 10 years O and M
Work for Construction of Intermediate CWPH at all IPSs CPSs, laying of Clear Water transmission main From Mandrail WTP to Block CPS/IPS all pumping stations up to Sawai Madhopur. Construction of CWRs and Intermediate Pump Houses and Off takes. Con
Drinking WSP for 1473vill of Chittorgarh Pratapgarh Rajsamand Udaipur District from JakhamDam under JJM Pkg2
1473vill ofChittorgarh Pratapgarh Rajsamand UdaipurDistrict Pkg1 WTP IPS1toIPS6 CPS01to19including complete works of theseCPS CD VDCivilworksfor93vill ofChhotiSadri block ofPratapgarh 707vill of 7blocks of Chittorgarhdistrict underJJMwith OandM 10Y