Loading…
Loading…
117 results • Recent activity
CONSTRUCTION WORK OF TUBEWELL CIRCLE OFFICE BAREILLY
construction of CC lining work reach from 1.500 km to 1.785 Km of total 285 mtr in main canal of gurha pump canal gram gurhakalan block naraini distt banda
construction of CC lining Reach From1.785 to 2.065 Km 280.00 mtr total in main cana to basrahi minorl at Gurha pump canal block naraini distt banda
construction of CC lining Reach From 2.896 Kulaba no 17 to 3.171 Km Kulaba No 19 275.00 mtr total in main canal at Gurha pump canal block naraini distt banda
construction of CC lining Reach From3.441 to 3.606 Km 165.00 mtr total in main canal and syphon no 06 Both side 50 mtr total 100 mtr at Gurha pump canal block naraini distt banda
CONSTRUCTION OF 04 Nos JUNIOR ENGINEER RESIDENCE Type III G Plus 1 AT TUBEWELL COLONY CAMPUS JALAUN of District JalaunU.P.